}

Laying Of 150Mm Dia And 100Mm Dia Di Water Supply Line In Place Of Damaged 100Mm Dia Rcc/Ac/Ci Pipe Lines To Avoid Chronic Pollution At H.No.10-1-631/2/A/2, Lavanya Medical Shop To 10-1-522/25, H.No.10-1-576/A, 10-1-573, Ramreddy Chicken Market To 10-1-56, HYDERABAD-Telangana

Hyderabad Metropolitan Water Supply And Sewerage Board-HMWSSB has published Laying Of 150Mm Dia And 100Mm Dia Di Water Supply Line In Place Of Damaged 100Mm Dia Rcc/Ac/Ci Pipe Lines To Avoid Chronic Pollution At H.No.10-1-631/2/A/2, Lavanya Medical Shop To 10-1-522/25, H.No.10-1-576/A, 10-1-573, Ramreddy Chicken Market To 10-1-56. Submission Date for this Tender is 18-02-2020. Cast Iron Pipe Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

23567262
Laying Of 150Mm Dia And 100Mm Dia Di Water Supply Line In Place Of Damaged 100Mm Dia Rcc/Ac/Ci Pipe Lines To Avoid Chronic Pollution At H.No.10-1-631/2/A/2, Lavanya Medical Shop To 10-1-522/25, H.No.10-1-576/A, 10-1-573, Ramreddy Chicken Market To 10-1-56
Open Tender
Indian
Telangana
HYDERABAD
18-02-2020

Tender Details

Laying Of 150Mm Dia And 100Mm Dia Di Water Supply Line In Place Of Damaged 100Mm Dia Rcc/Ac/Ci Pipe Lines To Avoid Chronic Pollution At H.No.10-1-631/2/A/2, Lavanya Medical Shop To 10-1-522/25, H.No.10-1-576/A, 10-1-573, Ramreddy Chicken Market To 10-1-561, Buduga Jangam Basthi, Chintal Basthi Under Humayun Nagar Section, Sub Division-Ii Of O&M Division No.Iii.(1St Call)

Key Value

Document Fees
Refer document
EMD
INR 9261.0 /-
Tender Value
INR 9.26 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 water supply Standard specification 47.62 One cum 5948.00 283243.76
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers. (For Road restortion).
2 water supply Standard specification 73.69 One cum 132.40 9756.56
Carting away the surplus excavated materials such as rock / earth the site to a suitable diatance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
3 water supply Standard specification 14.82 One cum 923.00 13678.86
Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidental and operational charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
4 water supply Standard specification 166.85 One cum. 34.90 5823.06
Refilling the pipe line trenches with using excavated soils other than sand with standard specification including watering and tamping in layers of 225mm etc., complete to the finished item as directed by the H.M.W.S.&.S. Board Engineers.
5 water supply Standard Specification 4.00 One Each 3066.00 12264.00
Making dummy arrangement to 100mm dia DI including cost of CI Socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc. complete as directed by the HMWS&SB Engineers.
6 water supply Standard Specification 25.00 One Each 80.00 2000.00
Making 1/2" dia boring to the existing DI / CI WS line including all sundries,labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
7 water supply Standard Specification 31.20 One Rmt. 423.00 13197.60
Supply, laying jointing and testing 100mm SWG 1st class pipes with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 5? depth and refilling with watering and tamping etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
8 water supply Standard Specification 5.76 One cum. 4203.00 24209.28
Dismantling and re-construction of CRS masonry in CM (1:6) prop: with available stones including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the H.M.W.S.&.S. Board engineers.
9 water supply Standard Specification 145.20 One Rmt. 201.00 29185.20
Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.
10 water supply Standard Specification 7.00 One Each 7411.00 51877.00
Supply and delivery fixing of RCC Precast manhole chambers having the size of 36"x21" dia at top fixing in CC 1:4:8 Prop:along with FRC Cover and frame laying CC 1:2:4 prop: including cost of materials labour charges earth work curing conveyance etc., Complete as directed by the HMWS&SB Engineers
11 water supply Standard Specification 8.67 One M.T 1215.00 10537.69
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
12 water supply Standard specification 78.00 One Kg 6.00 468.00
Supplying of cement including cost and conveyance etc., complete as directed by the HMWS&SB Engineers.
13 water supply Standard Specification 6.00 One Each 265.00 1590.00
Jointing 100mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
14 water supply Standard Specification 8.00 One Each 399.00 3192.00
Jointing 150mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
15 water supply Standard Specification 3.00 One Each 138.00 414.00
Labour charges for lowering and keeping in position 100mm dia D.I. / C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
16 water supply Standard Specification 4.00 One Each 233.00 932.00
Labour charges for lowering and keeping in position 150mm dia D.I. / C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
17 water supply Standard Specification 6.00 One Each 111.00 666.00
Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
18 water supply Standard Specification 4.00 One Each 209.00 836.00
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
19 water supply Standard Specification 4.00 One Each 348.00 1392.00
Cutting of 250mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
20 water supply Standard Specification 8.00 One Each 206.00 1648.00
Jointing 250mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
21 water supply Standard Specification 72.00 One Each 136.00 9792.00
Jointing 100mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
22 water supply Standard Specification 78.00 One Each 166.00 12948.00
Jointing 150mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
23 water supply Standard specification 907.00 One Rmt. 128.69 116721.83
Barricading, hoarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6\0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers.
24 water supply Standard Specification 225.50 One Rmt. 49.00 11049.50
Lowering the 100mm dia D.I. / C.I (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
25 water supply Standard Specification 228.00 One Rmt. 80.00 18240.00
Lowering the 150mm dia D.I. / C.I (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
26 water supply Standard specification 240.55 One cum. 343.00 82508.65
Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For pipeline trenches where depth is less than 1.5 times the width).
27 water supply Standard specification 35.81 One Cum 1342.00 48054.34
Cutting of BT road with 75 mm thick including labour charges all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
28 water supply Standard specification 57.23 One cum 2793.00 159843.39
Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail