Proposed Construction Of W . B . M Roads To Internal Roads In Prabhag No . 04 At Shiv-Shakti Nagar For Municipal Council Udgir
Tender Value
7.86 Lakhs
Estimated cost
Bid Submission
24 Feb 2020
0 days left
EMD
7868
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
UDGIR → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Proposed Construction Of W . B . M Roads To Internal Roads In Prabhag No . 04 At Shiv-Shakti Nagar For Municipal Council Udgir
BOQ
| Name of Work: PROPOSED CONSTRUCTION OF W.B.M ROADS TO INTERNAL ROADS IN PRABHAG NO.04 AT SHIV-SHAKTI NAGAR FOR MUNICIPAL COUNCIL UDGIR | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. MORTH 301 BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.11 & PAGE NO.27 BASIC RATE | 114.11 | Cu.M. | |
| 2 | 2 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. MORTH 305 BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.25 & PAGE NO.28 BASIC RATE | 91.288 | Cu.M. | |
| 3 | 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.29A & PAGE NO.29 | 135.67 | Cu.M. | |
| 4 | 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. By Mechanical Means - Grading I (Using Screening Type B (11.2 mm) Aggregate) BASIC RATE AS PER SSR 2019-20 ITEM NO. 3.19 & PAGE NO.33 | 171.165 | Cu.M. | |
| 5 | 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) BASIC RATE AS PER SSR 2019-20 ITEM NO. 3.12 & PAGE NO.36 | 85.583 | Cu.M. | |
| 6 | 6 | Supplying soft murum at the road site,including conveying and stacking complete. BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.29B & PAGE NO.29 | 28.528 | Cu.M. | |
| 7 | 7 | Spreading hard murum for side width etc. complete BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.30 & PAGE NO.29 | 221.253 | SQM | |
| 8 | 8 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. BASIC RATE AS PER SSR 2019-20 ITEM NO. 2.31 & PAGE NO.29 | 703.5 | SQM | |
| 9 | 9 | In SSR for items of supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates. For the items of sand and crushed metal rates are inclusive of royalty charges.Prevalent Royalty charges shall be separately considered while preparing estimate and shall be part of Schedule-B of tender.Any revision in Royalty charges shall be included in the rate analysis of the respective item. If there is variation in Royalty charges the difference shall be paid extra over the items to the contractor and shall be recovered if the Royalty rates are reduced by Govt.i.e Revenue department [As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges of Rs.141.34/Cu.M. ) are considered. E DSR ITEM NO. ... & PAGE NO.... BASIC RATE | 531.917 | Cu.M. | |
| 10 | 10 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender. testing of material by Quality control and certified quality must be use by contractor. CONCRETE AGG. | 2 | Nos. | |
| 11 | 11 | Add GST 12% | 1 | Nos. |
AI Tender Summary
Tender Timeline
Feb 10, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 24, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 25, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender