}

Tender For Garden, Parks And Fountains.Sh- Providing And Laying Epdm Flooring (Synthetic Track) With The Concrete Sub Base For Jogging Track In Nehru Park, Chanakyapuri, New Delhi., NDMC Area-Delhi

New Delhi Municipal Council-NDMC has published Tender For Garden, Parks And Fountains.Sh- Providing And Laying Epdm Flooring (Synthetic Track) With The Concrete Sub Base For Jogging Track In Nehru Park, Chanakyapuri, New Delhi.. Submission Date for this Tender is 20-02-2020. Fountains Tenders in NDMC Area Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

23565204
Tender For Garden, Parks And Fountains.Sh- Providing And Laying Epdm Flooring (Synthetic Track) With The Concrete Sub Base For Jogging Track In Nehru Park, Chanakyapuri, New Delhi.
Open Tender
Indian
Delhi
NDMC Area
20-02-2020

Tender Details

Tender For Garden, Parks and Fountains.SH- Providing and laying EPDM flooring (Synthetic Track) with the concrete sub base for jogging track in Nehru Park, Chanakyapuri, New Delhi.

Key Value

Document Fees
Refer document
EMD
INR 602219.0 /-
Tender Value
INR 3.01 Crore /-

BOQ Items

Name of Work:-Garden, Parks and Fountains. SH- Providing and laying EPDM flooring (Synthetic Track) with the concrete sub base for jogging track in Nehru Park, Chanakyapuri, New Delhi.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineerin-Charge. BI01010001010000000000000515BI0100001113 5430 Metre
2 2 Providing and laying at or near ground level factory made kerb stone of M- 25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). BI01010001010000000000000515BI0100001114 229 Cubic Metre
3 3 Earth work in surface excavation not exceeding 15 cm in depth but exceeding 1.5metre in width as well as 10 square metre on plan including disposal of excavated earth lead upto 50 metre and lift upto 1.5 metre. 4887 Square Metre
4 4 Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and\ndirections of Engineer-in-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 815 Cubic Metre
5 5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) including manufactured sand derived from Recycled concrete aggregate (RCA) upto 25% : 3 graded stone aggregate 20mm nominal size including Recycled concrete aggregate (RCA) upto 25%) aggregate 20 mm nominal size). 611 Cubic Metre
6 6 Providing and laying 15mm EPDM GRANULES (9mm SBR Bottom layer & 6mm EPDM Top layer) Flooring manufactured under quality management system of ISO 9001:2015 or above having polymer content 20-22% , High UV rating min 3 to 5 on greyscale, VOC less than 3.0 g/L, Combustibility less than 40 mm/min, elongation at break >500%, standard grain size 1.0-3.5mm and laying in three layers. Layer 1 - Polyurethane based primer coating. Layer 2- 9 mm Black Rubber base particle size mix with PU base binder. Styrene butadiene rubber / synthetic rubber .Layer 3 – 6 mm EPDM GRANULES chemically bonded with MDI single component of Diphenylmethane Diisocyanate and Paraffinic Oil etc. according to the specification of approved material and shade as per the direction of engineer-in-charge. (Only upto 80% of the amount will be paid through running bills/final bill till successful execution of the this item No.6. the balance amount i.e 20% will be paid in the following manner:-\n10% at the end of 1st year, 5% at the end of 2nd year and rest 5% at the end of 3rd year after actual date of completion as recorded by engineer-in-charge.)\n\n\n 8145 Square Metre
7 7 Carriage of Material by Manual Labour including loading, unloading from out side of park to inside of park at required site (for all leads)\n(a) Cement Concrete (1:1.5:3) 611 Cubic Metre
8 8 Carriage of Material by Manual Labour including loading, unloading from out side of park to inside of park at required site (for all leads)\n(a) kerb stones 17516 1000 No.
9 9 Purchase and taken the dismantled material surviceable / unserviceable which to be received form the work and taken aye by the contractor on as and wereis basic for which cartage shall be born by the contractor himself and against these material payment shall be made by the contractor to the department or necessary recovery shall be made form the bill as per the quantities received for different materials \n(a) Old Kerb Stone 17800 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail