Tender For Mechanical Maintenance Of Ptms, Transfer Gantry, 160T Crane, Lifting Beam, Pot Room Rails & Cleaning Of Equipments, Smelter Plant, NALCO, Angul,Odisha-Odisha

National Aluminium Company Limited has published Tender For Mechanical Maintenance Of Ptms, Transfer Gantry, 160T Crane, Lifting Beam, Pot Room Rails & Cleaning Of Equipments. Submission Date for this Tender is 22-02-2020. General Cleaning Equipments Tenders in Smelter Plant, NALCO, Angul,Odisha Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

23556694
Tender For Mechanical Maintenance Of Ptms, Transfer Gantry, 160T Crane, Lifting Beam, Pot Room Rails & Cleaning Of Equipments
Tender
Indian
Odisha
Smelter Plant, Nalco, Angul,Odisha
22-02-2020

Tender Details

Tender For Mechanical Maintenance Of Ptms, Transfer Gantry, 160T Crane, Lifting Beam, Pot Room Rails & Cleaning Of Equipments - -1 Ptm / 160T Crane, Lt Drv.Wheel, G.Box & 2 L.T. Gearbox Changing 3 L.T. Guide Wheel Changing 4 L.T. Middle Wheel Assy. Changing 5 L.T. Articulation Assy. Dsmnt. O / H & Fit 6 Lt Trailing & Guide Wheel Changing 7 Lt Gearbox Spider Element Changing 8 Lt Gearbox Coupling Changing 9 Lt Gearbox Brake Changing 10 Lt Gearbox Brake Side Chk Nut Tightening 11 Ht Drv.Wheel, Gearbox & Guide Wheel Chang 12 Ht Idler & Guide Wheel Changing 13 Ht Idler Wheel Changing 14 Ht / 25T Ct Gearbox Changing 15 25T Drv Trolley, G.Box & G.Wheel Changing 16 25T Idler & Guide Wheel Changing 17 25T Ct Top Guide Wheel Changing 18 25T Ct Bottom Guide Wheel Changing 19 25T Ct / Ht Ct G.Box Spider Elmnt.Changing 20 10T Frame G.Wheel Dismntl, O / H & Fitting 21 25T Hoist Wire Rope Changing 22 25T Hoist Entangled Wire Rope Re-Setting 23 160T Crane 80T Hoist Wire Rope Changing 24 Ptm Two Bucket Shovel Wire Rope Changing 25 Ptm 5Mt Hoist Wire Rope Changing 26 25T Ct Cable Trolley Repairing / Changing 27 25T Ct Cable Trolley Repairing / Fitting 28 25T Ct / Ht / Hyd.Working Pltfrm Insl.Chang 29 Ptm 25T Hoist Gearbox Changing 30 Ptm 25T Hook Assy. Changing 31 Ptm 25T Hoist G.Box Drv.Shaft Changing 32 Ptm 25T Hoist / 160T Crane 80Tbrake Change 33 Ptm 25T Brake Disc Changing 34 25T Hoist Bottom Pulley&V-Block Assy Chn 35 Ptm 25T Hoist Safety Brake Assy.Changing 36 25T Hook Load Cell Insl.Dismnt.Clean&Mnt 37 25T Hoist Gbox O / H Incl. Brg.&Seal Chang 38 Cabin Rep, Glass With Bed.Changing Paint 39 Old Cab Dismount & New / Rep.Cabing Fiting 40 Cab. Rail Dismnt, Repr, Grinding&Fit Back 41 Ptm Cabin Cable Troley Rail Repairing 42 Ptm Cabin Gearbox Changing 43 Ptm Cabin Idler Wheel Cahnging Per No. 44 Ptm Cabin Allignment 45 Ptm Cabin Glass & Bedding Changing 46 Ptm Slip Ring Dismounting & Fitting 47 Ptm Cb Insulatorchanging ( Per Ptm ) 48 Ptm Cb Tank Cleaning 49 Ptm Cb Hopper Gate / Spout Gate Changing 50 Ptm Cb Structure Changing 51 Cb Str.Ms Pipe Repair In Position 52 Cb Al.Pipe Repairing / Fabrication 53 Cb Pipe Lifting Gearbox Changing 54 Cb Pipe Rotation Gearbox Chanaging 55 Cb Pipe / Spout Lifting Pulley Changing 56 Cb Pipe Lifting Gearbox Drum Changing 57 Ah Assy.Repair Incl.Ah Str Repair 58 Ptm Anode Grab Changing 59 Old / Defect Ah Str.Dismount & Repair 60 Ptm A / H Hyd Cylinder Changing 61 A / H Br.Str.Mounting Or Br.Spring Tighten 62 Clamp Act.Assy Structural Repair 63 Clamp Actuator Hyd.Motor Tube Changing 64 Clamp Actuator Pne.Cylinder Changing 65 Clamp Actuator Wrench Assy.Changing 66 Clamp Actuator Y-Piece Changing 67 Old / Defect Clamp Act. Dismount & Repair 68 Complete Br.Assy Repair Incl.Br.Str. 69 Old / Defect Br.Assy Dismntg & Rep / New Fit 70 Br.Main Hyd.Cyl. Dismntg & New / Rep.Fit 71 Ptm Br.Titling Hyd.Cyl.Changing 72 Ptm Turret Hyd.Motor Changing 73 Ptm Hyd.Tank Mounting Bolt Changing 74 Ptm Sliding Cylinder Changing 75 Ptm Pne.Breaker Assy.Changing 76 Ptm Br. Tilt.Joint Rep. & Bush Changing 77 Crust Br.Str.Antivibration Mntg.Changing 78 Ptm Br.Top Structural Repair 79 Spout Low Gate Strl.Repair, Gasket Repl. 80 Spout Strl.Repair & Brg.Changing Excl. 81 Complete Spout Assy. Changing 82 Spout Allignment 83 Spout Lifting Gearbox Changing 84 T.B.S. Guide Structure Rail Changing 85 T.B.S. Guide Structure Rail Repairing 86 T.B.S. Moving Str.Changing & Hose Conne. 87 T.B.S. Moving Structure Repairing 88 T.B.S. Pne.Cylinder Changing 89 T.B.S. Bucket Changing 90 T.B.S. Gearbox Changing 91 T.B.S. Cyl.To Bucket Connect. Rod Repair 92 T.B.S. S.S. Extn.Box Repairing &Changing 93 T.B.S. Linkage Assy.Repairing & Changing 94 T.B.S. Rope Setting & Rope Guide Fitting 95 T.B.S. Rope Pulley Changing 96 T.B.S. Fixed Str. For Rope Slack Repair 97 T.B.S. Assy. Releasing From Pot 98 T.B.S. Ss Extn Box Mntg.Bolts Chng / Tight 99 Ptm 5Mt Hoist Geabox Changing 100 Fabrication Of Structurals & Erections 101 Hopper Trolley Rail Repairing ( 2 Nos ) 102 25T C.T Rail Repairing ( 1 No ) 103 Cabin Rail Repairing ( 1 No ) 104 Clean&Paint Of Ptm / 160T Crane Incl Write 105 Structural Cleaning & Painting 106 Ptm Compressor Air Radiator Changing 107 Ptm Compressor Oil Cooler Changing 108 10T Grab Structural Repair In Position 109 10T Grab Changing 110 Complete 10T Grab Str.Dismntl & Repr / Fit 111 10T Frame Guide Roller Changing 112 Structural Bolt Tight To Required Torque 113 Ptm Earthing Wire Brush Reclaimation / Fit 114 Ptm Earthing Roller Reclaimation / Re-Fitt 115 Lifting Beam Upper Latch Assy.Strl.Repr. 116 Lifting Beam Upper Latch Assy.Lower / Fit 117 Lifting Beam Chain ( Sz-2 ) Dismnt, Clean. 118 Lifting Beam Bumper Dsmnt Strl Repair 119 Transfer Gantry Drv.Wheel&Gearbox Change 120 Transfer Gantry Idler Wheel Changing 121 Transfer Gantry Drive Gearbox Changing 122 Transfer Gantry Latch-In Assy Repairing 123 Dsmtl.Of Old Comp.&Fit.New Comp.Incl Acc 124 Hydrovane / Screw Comp ( Air End ) Dismnt & 125 Supply Of Skilled Manpower 126 Supply Of Un-Skilled Manpower 127 Tight / Fit Of Breaker / Clamp Act.Str.Bolt 128 C.B. Pipe Rotn.Unit Dsmntl, Repr Incl Brg 129 Repl.Of Damaged Clamps & Base Plates 130 Tightening Of Rail Bolts Or Reqd.Torque 131 Levelling Of Gap Setting Of Rails 132 Fix Of Earth Conctr Betn Rail-Railgirder 133 Repair Of Rail Wornout Position By Weld 134 Ptm Thorogh Clean By Vacuum Cleaning M / C 135 Manual Clean Of Maint Pltforms, Ptms 136 Bagging & Shifting Of Alumina Powder 137 Pot Room Lifting Beam Pump Changing 138 Ptm C / Bath Pipe Wire Rope Setting 139 Tbs Spring Tie Rods Changing ( Per Spring 140 Ptm Lt Retractable Bumper Changing 141 C / Bath Tank Fluidizing Fabric Changing 142 Hopper Trolley Guide Wheel Changing 143 Anode Hoist / Br.Hyd.Cyl.O Ring Changing 144 Ptm Comp.Coupling Element Changing 145 Anode Hoist Liner Block Rep. & Changing 146 Ptm / 160T Crane Lt / Ht / Ct Brake Disc Chang 147 Ptm 25T Hoist Gearbox Flange Changing 148 Tbs Rope Drum Mounting Platform Repair 149 Tbs Rope Drum Bearing Changing 150 Hydraulic Main Pump Replacement 151 Turret Rotation Pump Replacement 152 Turret Rotation Stopper Repairing 153 Comp. Oil / Air Cooler Mntg. Frame Repair 154 Cabin Door Lock Changing 155 Hydraulic Hose Changing 156 Pneumatic Hose Changing 157 Hyd. Valve Base ORing Changing / Valve 158 Pne. Valve With Base Changing 159 Pneumatic Valve Changing 160 Ptm Thorough Manual Cleaning 161 Moisture Separator Bowl Chanign 162 Comp. Radiators & Air Filters Cleaning 163 Cb Gate Cyl. / Al. Fill Spout Cyl.Changing 164 Pendant Gearbox Trolley Unit Changing 165 Pendant C.T. Rail Repairing 166 Ptm Cabing Guide Wheel Changing 167 Ptm 25T Hook Load Cell Tie Rod Opening 168 Screw Comp.Discharge Valve Changing 169 Pot Room Lift.Beam Lwr Latch Assy Repair 170 Repl.Pne.Fitting In Pne.Lines 171 25T Hoist Bottom Pulley Block Repairing 172 Potroom Rail Girder Mntg.Toolbox Levling 173 Trans.Gantry Latch-In-Guide Assy.Repair 174 Trans.Gantry Ptm Lockingdevice Repairing 175 Ptm Hyd.Power Pack Complete Hose Changin 176 25T Area All Pne.Hose Changing ( Excl Top ) 177 Lt Drv Wheel Lock Plate Bolt Tightening 178 Cabin Cable Trolley Repair & Changing 179 Spout Arm Bearing Change ( Per Brg ) 180 Hopper Trolley / 25T Ct Brake Unit Change 181 Comp.Oil Sep. Element Changing ( Per Comp ) 182 Comp.Oil Sep. Chmbr Gasket Changing 183 Turret.Hyd Motor Seal Changing 184 Ptm Spout Rope Set / Counter Wgt Ins.Chng 185 Cb Al.Pipe Changing 186 Main Hyd. Tank Cleaning 187 25T Hook Rotn. Power Pack Changing 188 Comp.Pipe Coupling Changing 189 25T Hoist Wire Rope Changing ( Per Rope ) 190 Tbs Hoist Wire Rope Changing ( Per Rope )

Key Value

Document Fees
INR 500 /-
EMD
INR 125000.0 /-
Tender Value
INR 1.47 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail