Repairs To Badly Damaged Temporary Plinths And Raising At Bg Dhand
Tender Overview
Project Description
Repairs To Badly Damaged Temporary Plinths And Raising At Bg Dhand , Demolishing Brick Work Manually/ By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge . In Cement Mortar , Demolishing Dry Brick Pitching In Floors , Drains Etc . Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead : , Brick Work With Common Burnt Clay F . P . S . ( Non Modular ) Bricks Of Class Designation 7 . 5 In Foundation And Plinth In:Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) With Old Available Bricks , Excavating , Supplying And Filling Of Local Earth ( Including Royalty ) By Mechanical Transport Upto A Lead Of 5Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches , Plinth , Sides Of Foundation Etc . Complete . , Supplying And Filling In Plinth With Sand Under Floors , Including Watering , Ramming , Consolidating And Dressing Complete , Dry Flat Brick Flooring With Common Burnt Clay F . P . S ( Non Modular ) Bricks Of Class Designation7 . 5 Including Filling Joints With Fine Sand With Old Available Bricks , Dry Brick On Edge Flooring With Common Burnt Clay F . P . S ( Non Modular ) Bricks Of Class Designation7 . 5 Including Filling Joints With Grouting Of Mortar 1:6 ( 1 Cement:6 Coarse Sand ) With Old Available Bricks . With Old Available Bricks , Dry Brick On Edge Flooring With Common Burnt Clay F . P . S ( Non Modular ) Bricks Of Class Designation7 . 5 Including Filling Joints With Grouting Of Mortar 1:6 ( 1 Cement:6 Coarse Sand ) With Old Available Bricks . With New Bricks , 12 Mm Cement Plaster Of Mix :1:4 ( 1 Cement: 4 Fine Sand ) , Colour Washing Such As Green , Blue Or Buff To Give An Even Shade :New Work ( Two Or More Coats ) With A Base Coat Of White Washing With Lime
BOQ
| Name of Work: Repairs to badly damaged Temporary plinths and raising at BG Dhand. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | BI01010001010000000000000515BI0100001113 | 85 | cum |
| 2 | 2 | Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : | BI01010001010000000000000515BI0100001114 | 1320 | cum |
| 3 | 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) with old available bricks\n | BI01010001010000000000000515BI0100001115 | 217 | cum |
| 4 | 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | BI01010001010000000000000515BI0100001116 | 2032 | cum |
| 5 | 5 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete | BI01010001010000000000000515BI0100001117 | 957 | cum |
| 6 | 6 | Dry flat brick flooring with common burnt clay F.P.S (non modular) bricks of class designation7.5 including filling joints with fine sand With old available bricks | BI01010001010000000000000515BI0100001118 | 8635 | Sqm |
| 7 | 7 | Dry brick on edge flooring with common burnt clay F.P.S (non modular) bricks of class designation7.5 including filling joints with grouting of mortar 1:6(1 cement:6 coarse sand) With old available bricks. With old available bricks | BI01010001010000000000000515BI0100001119 | 1190 | Sqm |
| 8 | 8 | Dry brick on edge flooring with common burnt clay F.P.S (non modular) bricks of class designation7.5 including filling joints with grouting of mortar 1:6(1 cement:6 coarse sand) With old available bricks. With new bricks | BI01010001010000000000000515BI0100001120 | 4887 | Sqm |
| 9 | 9 | 12 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) | BI01010001010000000000000515BI0100001121 | 675 | sqm |
| 10 | 10 | Colour washing such as green, blue or buff to give an even shade :New work (two or more coats) with a base coat of white washing with lime | BI01010001010000000000000515BI0100001122 | 675 | sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender