Purchase Of Setting Up Of Anechoic Chamber Needed For The Emi / Emc Pre-Compliance Test Set-Up
Tender Overview
Project Description
Purchase Of Setting Up Of Anechoic Chamber Needed For The Emi / Emc Pre-Compliance Test Set-Up
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Feb-2020 | EXTENSION OF CRUCIAL DATES | Date | 24-Feb-2020 |
| 2 | 19-Feb-2020 | EXTENSION OF DATES | Date | 21-Feb-2020 |
BOQ
| Name of Work: PURCHASE OF SETTING UP OF ANECHOIC CHAMBER NEEDED FOR THE EMI / EMC PRE-COMPLIANCE TEST SET-UP [Note: Kindly Verify the Detailed Technical Specifications] | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | PURCHASE OF SETTING UP OF ANECHOIC CHAMBER NEEDED FOR THE EMI / EMC PRE-COMPLIANCE TEST SET-UP | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.1 | Pre-compliance EMC/Antenna Chamber\n• Chamber Dimensions – 6.2x3.8x3 meter chamber with 250mm raised floor need to be provided.\n• Frequency Range of Operation - 30MHz- 40GHz\n• The chamber design should support Semi anechoic EMC measurement and Full anechoic antenna measurement.\n• Chamber should be constructed in PAN type modular structure with atleast 2mm Galvanized steel with necessary support structure.\n• Chamber should be independent and self-supported structure.\n• RF Door – 2 X 0.9, meter, swing Dual access RF proof, semi-automatic door with electric actuation and necessary Be-Cu based finger stocks. \n• Flush mounted 1 meter Turn Table with load handling capacity of 500Kgs need to be provided.\n• Reflective ground plane on the floor is required. \n• Airvent with necessary air handling unit for Air ventilation is required.\n• Atleast 20A Power filter with electrical distribution need be provided\n• Manual Antenna Mast with variable height range 0.8 to 1.8 meter need to be provided.\n• Shielding effectiveness 90dB and better is required as per IEEE299.\n• Spurious free EMC lighting is required.\n• Connector panel with SMA, N Type connectors along with Ethernet, USB, Fiberoptic need to be provided for DUT monitoring.\n• Complete absorber lining to perform EMC and Antenna measurement need to be provided.\n• Removable Absorber need to be provided on the floor to support EMC measurements.\n• Absorber should have reflectivity of atleast -40dB at 1GHz and above.\n• Absorber should have impedance matched to perform low frequency radiated emissions measurement. \n• Modular Antenna positioner along with suitable software need to be provided for 2D/3D pattern measurement compatible with renowned Network analyzer with report generation capability.\n• The antenna positioner need be sync with Turn table for 2D/3D measurement.\n\n | BI01010001010000000000000515BI0100001113 | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender