| 1 | 1 | Schedule-1 (Construction) | | | |
|---|
| 2 | 2 | SUB HEAD : PREPARATORY WORKS, SITE CLEARANCE, DISMANTLING \nSetting Out Pillars \nProviding & Fixing of Working benchmark Pillars 4 nos. per km & 40 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | | 0.725 | Km |
|---|
| 3 | 3 | Clearing and Grubbing Road Land including uprooting wild vegetation , grass,bushes,shurbs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and unseviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification(clause201.1) | | 0.145 | Ha |
|---|
| 4 | 4 | Box Cutting\nExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | | 54.375 | cum |
|---|
| 5 | 5 | SUB HEAD : EARTHWORK\nConstruction of embankment with material obtained from road way cutting\nConstruction of embankment with approved materials deposited at site and obtained from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | | 32.63 | cum |
|---|
| 6 | 6 | Construction of Embankment with Material Obtained from Borrow Pits\nConstruction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 . (Including Royality & Labour Cess).\nFor 1000 m lead | | 572.77 | cum |
|---|
| 7 | 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1. (Including Royality & Labour Cess).\nB) In Rigid Road | | 394.22 | cum |
|---|
| 8 | 8 | SUB HEAD : CC PAVEMENT \nGranular Sub-Base with Coarse Graded Material (Table:- 400- 1)\nConstruction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (To achive minimum CBR value of 50% ) | | 77.21 | cum |
|---|
| 9 | 9 | WBM Grading 3 (By Manual Means )\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | | 207.98 | cum |
|---|
| 10 | 10 | Cement Concrete Pavement \nConstruction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water or else (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | | 443.7 | cum |
|---|
| 11 | 11 | Hard Shouldering \nLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412 | | 362.5 | sqm |
|---|
| 12 | 12 | SUB HEAD : ROAD FURNITURES , KM STONES , TRAFFIC & DIRECTION SIGN , MMGSY LOGO\nProviding and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.\n | | 30 | m |
|---|
| 13 | 13 | Kilometre stone \nReinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703\nii) Km stone | | 2 | No. |
|---|
| 14 | 14 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 \niii) 200 m stone | | 3 | No. |
|---|
| 15 | 15 | Traffic sign A. Retro Reflectorised Traffic signs\nProviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801\n600 mm equilateral & triangle, | | 2 | Nos |
|---|
| 16 | 16 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801\n600 mm circular , | | 2 | Nos |
|---|
| 17 | 17 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801\n800 mm x 600 mm rectangular, | | 2 | Nos |
|---|
| 18 | 18 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801\n600 mm x 450 mm rectangular, | | 2 | Nos |
|---|
| 19 | 19 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801\n900 mm side octagon, OR | | 1 | Nos |
|---|
| 20 | 20 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface\nProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | | 145 | sqm |
|---|
| 21 | 21 | Providing and Fixing 'Logo' of Project \nProviding and fixing of typical PMGSY/ MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 | | 3 | No. |
|---|
| 22 | 22 | SUB HEAD : QUANTITY FOR NEW H.P. CULVERT (600mm) 1No.\nEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | | 15.662 | cum |
|---|
| 23 | 23 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | | 2.054 | cum |
|---|
| 24 | 24 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | | 15.165 | cum |
|---|
| 25 | 25 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. | | 7.5 | m |
|---|
| 26 | 26 | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 | | 39.197 | sqm |
|---|
| 27 | 27 | GST @ 12% on Schedule-1 (Construction) | | 1 | Rupees |
|---|
| 28 | 28 | Labour Cess @ 1% on Schedule-1 (Construction) | | 1 | Rupees |
|---|
| 29 | 29 | Seigniorage (As calculated) on Schedule-1 (Construction) | | 1 | Rupees |
|---|
| 30 | 30 | Schedule-2 (Maintenance) | | | |
|---|
| 31 | 31 | 1st Year Maintenance cost | | 1 | Year |
|---|
| 32 | 32 | 2nd Year Maintenance cost | | 1 | Year |
|---|
| 33 | 33 | 3rd Year Maintenance cost | | 1 | Year |
|---|
| 34 | 34 | 4th Year Maintenance cost | | 1 | Year |
|---|
| 35 | 35 | 5th Year Maintenance cost | | 1 | Year |
|---|
| 36 | 36 | GST @ 12% on Schedule-2 (Maintenance) | | 1 | Rupees |
|---|
| 37 | 37 | Labour Cess @ 1% on Schedule-2 (Maintenance) | | 1 | Rupees |
|---|
| 38 | 38 | Seigniorage (As calculated) on Schedule-2 (Maintenance) is Equal to Zero | | | |
|---|