| 1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | | 95 | No |
|---|
| 2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | | 2 | No |
|---|
| 3 | 3 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | | 20 | No |
|---|
| 4 | 4 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | | 30 | Trip |
|---|
| 5 | 5 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | | 83 | No |
|---|
| 6 | 6 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | | 5 | No |
|---|
| 7 | 7 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | | 1 | No |
|---|
| 8 | 8 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | | 34 | No |
|---|
| 9 | 9 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | | 2 | No |
|---|
| 10 | 10 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. | | 1 | No |
|---|
| 11 | 11 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. | | 1 | No |
|---|
| 12 | 12 | Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials. | | 1 | No |
|---|
| 13 | 13 | Erection of LT 2 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing). | | 1 | No |
|---|
| 14 | 14 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. | | 3 | No |
|---|
| 15 | 15 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. | | 6 | No |
|---|
| 16 | 16 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | | 1 | No |
|---|
| 17 | 17 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | | 12 | km/km |
|---|
| 18 | 18 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | | 18 | No |
|---|
| 19 | 19 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | | 1 | No |
|---|
| 20 | 20 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | | 10 | No |
|---|
| 21 | 21 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | | 60 | No |
|---|
| 22 | 22 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | | 15 | No |
|---|
| 23 | 23 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | | 33 | No |
|---|
| 24 | 24 | Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and stacking. | | 2 | No |
|---|
| 25 | 25 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. | | 4 | No |
|---|
| 26 | 26 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. | | 1.5 | km |
|---|
| 27 | 27 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. | | 1.5 | km |
|---|
| 28 | 28 | Providing/Inserting 3 line spacer on the existing LT OH line. | | 20 | No |
|---|
| 29 | 29 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | | 12 | No |
|---|
| 30 | 30 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | | 60 | No |
|---|
| 31 | 31 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | | 70 | No |
|---|
| 32 | 32 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | | 8 | No |
|---|
| 33 | 33 | Providing Strut using LT PSC pole incl. digging & back filling pit. | | 10 | No |
|---|
| 34 | 34 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | | 10 | No |
|---|
| 35 | 35 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | | 8 | No |
|---|
| 36 | 36 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. | | 4 | No |
|---|
| 37 | 37 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. | | 11 | No |
|---|
| 38 | 38 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | | 2 | No |
|---|