Asphalt Base Surface •?Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.\n•?Preparation and consolidation of sub grade after loosening of the ground upto a level of 300mm below the sub-grade level, watered, graded and compacted in layers to meet requirement for sub-grade construction completes in all respect.\n•?Providing and spreading of high-quality weedicide over the prepared surface to avoid the growth of the weeds on the top surface.\n•?Providing laying, spreading and compacting hand broken/crushed stone metal 63-45mm gauge and consolidation of W.B.M specification of 100 mm thick compacted layer including spreading of stone metal in uniform thickness and packing, rolling with road roller 8-10 tone in stages to proper grade and camber.\n•?Providing laying spreading and compacting hand broken/crushed stone metal 53-22.4mm gauge and consolidation of W.M.M specification of 75 mm thick compacted layer including spreading of stone metal in uniform thickness and packing, rolling with road roller 8-10 tone in stages to proper grade and camber.\n•?Providing and laying Tack Coat with bitumen emulsion using sprayer @ 5.0kg/10 sqm on prepared surface, heating bitumen in boiler and spraying the bitumen with spray set fitted on bitumen boiler cleaned with narial broom complete in all respect as per MORT&H specification to the entire satisfaction of engineer in charge.\n•?Providing and laying 50mm thick Bituminous Macadam after mixing aggregates and bitumen as per design mix in Mixer Plant using 3.3% (by weight of total mix) bitumen of total mix with aggregates and rolling with smooth wheeled, tandem rollers.\n•?Providing and laying Tack Coat with bitumen VG-10 using sprayer @ 3.0kg/10 sqm on prepared bituminous surface, heating bitumen in boiler and spraying the bitumen with spray set fitted on bitumen boiler.\n•?Providing and laying 30 mm thick Bituminous Concrete with mechanical paver after mixing aggregate and bitumen as per design mix in hot mix plant using maximum 5.5 % bitumen, using both coarse and fine aggregate and rolling with smooth wheeled, tandem rollers.\n•?Providing and laying 9\" thick edge wall 12\" high, flushed to the level of playing surface, plastered.\n•?Providing and laying saucer drain 6\" wide, 6\" deep at the shallow end and 9\" deep at the end of slope area. Plaster and painting complete.\n
item1
7200
Sq. Feet
3
1.02
Synthetic Acrylic System of ITF Standard (9 Layers) Surfaces should be 100% Acrylic and UV resistant.\nDetail of 9 Layers: \n1. One layer of Priming (For CC Surface)\n2. One Layer Resurfacer blended with approved silica sand \n3. One Layer Base 1 \n4. Four Layer Cushion \n5. One Layer Textured Course \n6. One Layer Finish course \n7. Line Marking -A heavy bodied acrylic latex white striping paint (Marking is to be done for Lawn tennis court)\n
One Side Drain : Providing and laying cement concrete 1:2:4 (1: cement: 2 core sand: 4 stone graded) for drain with sloping.
item4
1
Pr
6
1.05
Chain Link Fencing : 1. Fencing 10 Feet High \n2. 12 Gauge 2 Inches diameter of Mild Steel Pipe spaced 10 feet apart on all four Sides of the court with one gate \n3. Top and Bottom of the chain link have 2 inches Diameter pipes and the chain Links has 3mm thick GI wire spread 2 inches apart \n4. Two coats of enamel paint with one coat of red oxide primer \n
item5
3600
Sq. Feet
7
1.06
LED-Flood Lighting System (Havells/ Philips/Crompton)\n1. 16 LED FLOOD LIGHTS of 200 W \n2. One double door weather proof distribution board with MS sheet \n3. 4 poles with MCB’s \n4. Earthing Electrodes \n5. Full wiring from distribution board to poles and to the fixtures complete\n
item6
2
Set of lighting
8
1.07
Movable Tennis Pole and Net of High Quality\nTennis pole fix with outer slip, international standard height 107 cm, made of 80mm sq. MS pipe, in MS under rachid net adjustable, upper cap same metal, 18 inches slip, powder coated with best quality nylon net. \n•?Base made of 4” Inch heavy Channel Double weight\n•?Portable and movable with wheel\n•?Approx. Wait 470 Kg to 500Kg Per pair\n
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.