Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Iii ( Tandb ) , Iv ( B ) , Iv ( T ) , Vi , Vii , Viii And Local Seams Of Patch X2 Of Asp Colliery , Ej Area , Bccl. Submission Date for this Tender is 21-02-2020. Machine Tools Tenders in CMC DEPARTMENT,BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone in proper manner including spreading, dozing, lighting,water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete. \n (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead : (1-2) KM from face to OB dump.\n | Item 1 | 515000 | CuM |
2 | 1.1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone in proper manner including spreading, dozing, lighting,water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete. \n (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead : (2-3) KM from face to OB dump.\n | Item 2 | 1.617e+06 | CuM |
3 | 1.2 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone in proper manner including spreading, dozing, lighting,water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete. \n (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead : (3-4) KM from face to OB dump.\n | Item 3 | 4.337e+06 | CuM |
4 | 2 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in proper manner on the dumping yard including, spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc. all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc. all complete.\n\nCarriage lead: (0-1) KM from face to OB dump.\n | Item 4 | 413000 | CuM |
5 | 3 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers / dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones / extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nCarriage Lead: (1-2) KM from face to surface dump.\n | Item 5 | 934000 | MT |
6 | 4 | Drilling in Coal and OB by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete, as per instruction of Engineer-in-charge. | Item 14 | 555779 | Mtr |
7 | 5 | Total impact of GST for the purpose of CTC | Item 16 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail