Road Transport and Highways Government Departments Closing in 0 days TDR #23485082

Construction Of Kot Gaon To Kalab M/R , ( Stage-I ) . ( Wapcos ) Construction Of Kot Gaon To Kalab M/R , ( Stage-I ) , Length 15 . 00 Km And Performance Based Maintenance For Two Years , Phase Xvi .

Issued by Government Departments · Mori, Uttarakhand
Tender Value
8.46 Crore
Estimated cost
Bid Submission
18 Feb 2020
0 days left
EMD
17.16 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Rate Contract
Location / State
Mori → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Kot Gaon To Kalab M / R , ( Stage-I ) . ( Wapcos ) Construction Of Kot Gaon To Kalab M / R , ( Stage-I ) , Length 15 . 00 Km And Performance Based Maintenance For Two Years , Phase Xvi .

BOQ

Name of Work: Construction of Kotgaon (Naitwar) to Kalap Motor Road Under PMGSY Phase-XVI (Stage-1) Length-15.00 Km. Work
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Earth work in hill road (hill side cutting):- Excavation in hilly in soil area for construction of road in all types of soils & rocks as met at site , true to lines as per plan, L section , camber, super elevation as required , also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes, with all lead, lift and safe disposal of surplus excavated material at suitable dumping placeindicated in Drawing by Mechanical means /manual means without other wise damaging the forest , forest land , utilities, private and public properties, including slip clearance till the complition of work as per special condition for hill road cutting and muck disdisposal in lum sum job mentioned in sbd clause 8 of section 4 (part-ii) special condition of contract and as directed by Engineer-in-charge as per MORD specification Clause 1601 ,1602 ,1603.item 11Ls
22Clearance of land slides ( slip clearance ) 1-10-1 clearance of land slides in soil and ordinary rock by a bull -dozer D 80 A-12 ,180 HP and Disposal of the same on the valley side complete as directed by the Engineer-in-charge .item 26750Cum
33PROTECTION WORK :item 3
44Earthwork in Excavation for structures as per Drawing and technical specification Clause 305.1 including setting out , Construction of Shoring and bracing , removal of stumps and other deleterious material and disposal up to a lead of 50 m ,dressing of sides anfd backfilling in trenches with excavated suitable material . For R/Wall & B/Wallitem 43343.68Cum
55Random rubble stone masonry laid dry in Breast Wall , Retaining Wall etc including supply of all material labour , T & P and Royalities etc complete as per Drawing and Technical specifications Clause 702,704,1202 & 1203 of MORD Specification For R/wall ,B/Wallitem 56376.33Cum
66Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 in cement mortar (1:5)item 6505.48Cum
77Hand Packed stone filling in back of walls including cost of all material, labour,Royalty , T&P etc. completion as per directed by Engineer-in-charge (as per PWD uttarakhand Specification ) (For R/Wall, B Wall )item 7818.58Cum
88Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire @32 kg/10 sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 % extra for laps and joints laid with stone boulders weighting not less than 25 Kg each per drawing and technical specification clause 1301item 8798.75Cum
99Cement Plum masonary with 40% plum & 60% 1:3:7 cement concrete including supply of all material,labour ,T&P etc required for proper completion of work asper drawing and technical specification clause 802,803,1202 & 1203 of MORD Specification PWD Uttarakhand Specifications)item 9567Cum
1010Providing Edge stones of size 450 x 350 x 100 mm on valley side of formation as per drawing and technical specification Clause 1608.2.6item 101792No
1111Providing and laying of Parapet with PCC M15 Nominal Mix as per standard drawing and Technical specifications Clauses 800and 1208.4 including supply of material , labour , T&P etc required for proper completion of the work and specified in detailed Drawing with white washing complete as per the direction of Engineer -in-charge.item 11
1212Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 in cement mortar (1:5)item 12469.04Cum
1313plastering with cement mortar 1:4 15mm thick on brick work in substructure ,as per technical specification Clauses 613.4 & 1204.item 13811.8sqm
1414Pointing with cement mortar 1:3 on brickwork as per drawing and technical specification clause 613.3 and 1204item 141082.4sqm
1515White washing white washing of parapet walls of CD work and tree trunks white washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc as per technical specification clause 1915item 153463.68Cum
1616DRAINAGE WORKitem 16
1717surface drain in soil construction of Trapzodial kutcha drain surface drains of average cross-sectional area 0.40 sqm in soil to specified lines grades levels and dimensions, Excavated material to be used in embankments with a lift up to 3m and lead of 50 m (average lead 25 m) as per technical Specification clause 307item 1714130R/m
1818CROSS DRAINGE WORKitem 18
1919SCUPPER & Catchpititem 19
2020Construction of 1 m span scupper of RR 1:6 abutment RCC slab as per attached drawing includin supply of all material, labour, T&P etc. required for proper completion of the work . (530.70 R/m)item 20
2121Excavation in foundationitem 214888.3Cu m
2222Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specification clause 802,803,1202,1203 P.C.C GRADE M10 Nomonal mix 1:3:6 (hand mixing)item 22423.45Cum
2323Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 in cement mortar (1:5)item 231520.96Cum
2424Providing and laying reinfoced cement concrete in superstructure as per drawing and technical specification clauses 800, 1205.4 and 1205.5 R.C.C (M25 grade) HEIGHT UP TO 5m.item 24213.75Cum
2525Supplying, fitting, and placing HYSD bar reinforcement in superstructure copmlete as per drawing and technical specifications Clacses 1002, 1010 and 1202item 25209.75Qtl
2626Providing and laying of plain /Reinforced cement concerte in substructure complete as per drawing and technical specification Clauses 802, 804, 805. 806, 807,1202,1204 (M-25)item 2623.52Cum
2727Providing weepholes in brick masonary/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing asd technical specification Clauses 614, 709, 1204.3.7item 271914Nos
2828Providing and Laying pitching (Kharanja Base) on slopes laid over prepared filter media as per drawing and Technical specification clause 1302 stone /Boulderitem 28832.76Cum
2929Construction of causeway with R.R. Dry Kharanja, plain cement concerete 1:3:6 , C.C.1:1.5:3 including supply and fixing of M.S.Steel reinforcement and required excavation etc. completed by CE level -P.W.D. Uttarakhand.item 29
3030Earthwork in Excavation for structures as per Drawing and technical specification Clause 305.1 including setting out , Construction of Shoring and bracing , removal of stumps and other deleterious material and disposal up to a lead of 50 m ,dressing of sides anfd backfilling in trenches with excavated suitable material .item 30278.63Cum
3131Providing and Laying pitching (Kharanja Base) on slopes laid over prepared filter media as per drawing and Technical specification clause 1302 stone /Boulderitem 3153.03Cum
3232Providing and laying of plain /Reinforced cement concerte in open foundation complete as per drawing and technical specification Clauses 802, 803, ,1202,1203 P.C.C GRADE (M-10) NOMINAL MIX1:3:6item 3268.22Cum
3333Providing and laying of plain /Reinforced cement concerte in substructure complete as per drawing and technical specification Clauses 802, 804, 805. 806, 807,1202,1204 (M-20)item 3329.09Cum
3434Supplying, fitting, and placing TMT bar reinforcement (Fe 415) in substructure copmlete as per drawing and technical specifications Clauses 1002, 1005 and 1010 & 1202. ( The reinforcement steel shall be as per clause no 2011.3.1 of MORD specifications (First Revision 2014) and IS 1786:2008 clause no .1.6)item 346.85Qtl
3535Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 in cement mortar (1:5)item 35214.48Cum
3636Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire @32 kg/10 sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 % extra for laps and joints laid with stone boulders weighting not less than 25 Kg each per drawing and technical specification clause 1301item 3678.75cum
3737Construction of RCC Culvertitem 37
3838Earthwork in Excavation for structures as per Drawing and technical specification Clause 305.1 including setting out , Construction of Shoring and bracing , removal of stumps and other deleterious material and disposal up to a lead of 50 m ,dressing of sides anfd backfilling in trenches with excavated suitable material .item 3834.74cum
3939Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 Coursed rubble masonry (1st sort) in 1:4 cement mortar .item 3962.04cum
4040Stone masonary in cement mortar for substructure complete as per technical specification clause 702, 704,1202, and 1204 Coursed rubble masonry (1st sort) in 1:5 cement mortar .item 4055.37cum
4141Providing and laying of plain /Reinforced cement concerte in open foundation complete as per drawing and technical specification Clauses 802, 803, ,1202,1203 P.C.C GRADE (M-10) NOMINAL MIX1:3:6item 4111.58cum
4242Supplying, fitting, and placing HYSD bar reinforcement in superstructure copmlete as per drawing and technical specifications Clacses 1002, 1010 and 1202item 4279.25Qtl
4343Providing and laying reinfoced cement concrete in superstructure as per drawing and technical specification clauses 600, 1205.4 and 1205.5 For Design Mix RCC (M20 grade) HEIGHT UP TO 5m.item 43101.95Cum
4444HAND PACKED stone filling in back of walls including COST of all material, labour, T&P,ROYALTY etc. COMPLETE AS PER Direction Engineer - in-charge (As per PWD Uttarakhand specifications)item 4419.56cum
4545Providing and Fixing in position pipe railing consisting of IS Rolled Steel Joist Posts Designation IS MB 100 (100 x 75) at 2.5 m interval and Three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specification Clause 1208.2item 4530mtr
4646ROAD FURNITUREitem 46
4747Providing and fixing of km stone as per standard drawing made of precast RCC 1:2:4 Fixed with CC 1:3:6 including excavation of pit, painting and printing laters on km. stone with two coat of approved synthetic enamel paint of approved Ordinary Kilometer stone (PRECAST)item 4712No.
4848Same as above item no. but for 200 m(hectometer) stoneitem 4860No.
4949Same as above item no. but for 5th Km. stoneitem 493No.
5050Providing and fixing of PMGSY logo board at Starting point, As per attached standard drawing duly painted and return as per MORD specification and direction by engineer-in-chargeitem 501No.
5151Providing and fixing of PMGSY logo board at end point and every 2Km. As per attached standard drawing duly painted and return as per MORD specification and direction by engineer-in-chargeitem 517No.
5252Providing and fixing of title information board with PMGSY logo at suitable place in the starting of the road as per attached standard drawing duty painted and writen as per MORD specification and direction by Engineer-in-chargeitem 521No.
5353Providing and fixing of citizen Information board with PMGSY logo at starting and prominent location (Where maximum no. of citizens can view the detail of the road) as per attached standard drawing duly painted and return as per MORD specification and direction by engineer-in-charge.item 531No.
5454Providing and fixing of Maintanance board with PMGSY LOGO AT STARTING AND PROMINENT LOCATION (WHERE MAXIMUM NO OF CITIZEN CAN VIEW THE DETAIL OF THE ROAD) AS PER ATTACHED DRAWING DULY PAINTED AND WRITEN AS PER MORD SPECIFICATION AND DIRTECTION BY ENGINEER-IN-CHARGE.item 541No.
5555Providing and fixing of TRafic sign boards cautionary ,mandatory & informatory as per attached standard drawing duly painted and writen as per MORD specification and direction by engineer-in-chargeitem 5515No.
5656Providing and fixing of semi reflective direction and place identification sign board upto 0.90sqm. As pere atteched drawing and direction by engineer-in-chargeitem 563No.
5757Providing and fixing of semi reflective direction and place identification sign board more than 0.9sqm. As pere atteched drawing and direction by engineer-in-chargeitem 574No.
5858OTHER WORKitem 58
5959Construction of Reference pillars WITH RR 1:6 STONE MASONARY AND PLASTERED WITH 1:4 MORTAR (TOTALLY UNDER GROUND ) OF LENGTH 200mm ,WIDTH 200mm AND HEIGHT 300 mm as per Fig. 1600.1 (b) and technical specification clause1602.1 of MORD specificationasitem 59600Nos
6060Construction of BACK pillars WITH RR 1:6 STONE MASONARY AND PLASTERED WITH 1:4 MORTAR OF LENGTH 300mm ,WIDTH 300mm AND HEIGHT 400 mm OF WHICH 100MM SHALL BE BELOW GROUND LEVEL as per Fig. 1600.1 (b) and technical specification clause1602.3 of MORD specificationasitem 60600Nos
6161Construction of job pillars as per figure 1600.1 (d) and technical specification clause 1602.4item 612Nos
6262MUCK DISPOSALitem 62
6363Disposal of Unsuitable earth and boulder obtained from Hill side cutting ,including supply of all materials,labour and T&P etc complete , required for proper completion of the work ,as per direction of Engineer-in-charge.item 6346077.7Cum
6464Earthwork in Excavation for structures as per Drawing and technical specification Clause 305.1 including setting out , Construction of Shoring and bracing , removal of stumps and other deleterious material and disposal up to a lead of 50 m ,dressing of sides anfd backfilling in trenches with excavated suitable material .item 64256.5Cum
6565Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire @32 kg/10 sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 % extra for laps and joints laid with stone boulders weighting not less than 25 Kg each per drawing and technical specification clause 1301item 653294Cum
6666EMERGENCY MAINTENANCEitem 66
6767Major slip clearance in all type of soil ,rock and boulders including cost of all material ,machine T&P etc required for proper complition of work as per MORD specification o work 1611.item 67
68681st Yearitem 681500Cum
69692nd Yearitem 691350Cum
7070Deploying Hydraulic Excavator of 0.90 Cum bucket for Clearance of major slip in all type of soil Rock and Boulders including ,its operator pol and all other charge required for proper complition of work .item 70
71711st Yearitem 7175hour
72722nd Yearitem 7267.5hour
7373providing & laying of boulders apron laid in wire crates with 4 mm dia GI wire confirming to IS:280 and IS:4826 in 100 mm x 100mm mesh (woven diagonally ) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per Drawing and Technical specification 1301item 73
74741st Yearitem 7460Cum
75752nd Yearitem 7554Cum
7676Coolie Walling including supply of all material labour T&P ,Royalty etc required for proper complition of work , as Directed By Engineer-in -charge and as per PWD specification 8.90 (For opening comuncation only)item 76
77771st Yearitem 7760Cum
78782nd Yearitem 7854Cum
7979Routine Maintenance Under PBMC\n(1) Trimming of grass and weeds from the shoulders/Berms and disposing of the same to suitable locations as per technical specification clause 1914. \n(2) Maintenance of road side drain including minor slip clearence reshaping, deepening and regrading as well as catch water drains as per technical specification clause 1907. \n (3) Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per technical specification clause 1903.\n(4) Maintenance of scuppers & culverts by way of clearing, cleaning, erosion repair, repair to crack, parapet walls and protection works as per technical specification clause 1908.\n(5) Maintenance of Causeway by way of minor surface repairs, replacing guide posts, repair of fixed gauges, removal of debris providing boulders and protection works and painting as per technical specification clause 1909.\n(6) Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910.\n(7) Maintenance of 200 metre, km stones, by way of refixing of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 meter, km stone and 5th km stone as per drawing and technical specification Clause 1912. \n(8)Two coat White washing on parapet walls of CD work, edge stones, tree truncks and prominent rocks, patches on hill sides including preparation of surface by cleaning scrapping etc. as per Technical specification Clause 191.item 79
80801st Yearitem 8015Km
81812nd Yearitem 8115Km

AI Tender Summary

OUR REF NO 23485082
AUTHORITY Government Departments
TENDER VALUE 8.46 Crore
LAST DATE 18-02-2020
Authority
Authority Name Pradhan Mantri Gram Sadak Yojana
Work Description Construction Of Kot Gaon To Kalab M / R , ( Stage-I ) . ( Wapcos ) Construction Of Kot Gaon To Kalab M / R , ( Stage-I ) , Length 15 . 00 Km And Performance Based Maintenance For Two Years , Phase Xvi .
Basic Detail
Tender No UT1386
Bidding Type Rate Contract
Location
City Mori
State Uttarakhand
Key Dates
Publish Date 04 Feb 2020
Submission Date 18 Feb 2020
Open Date 18 Feb 2020
Finance
Tender Value 8.46 Crore
Tender Fee 5000
EMD 17.16 Lakhs
Exemption Not Available
Document List
BOQ_154321.xls
SBDUT1386.pdf
Tendernotice_1.pdf
19164E22-E636-4022-AC8C-DE5D66BA3225.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 04, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 18, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 18, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_154321.xls

pdf

SBDUT1386.pdf

pdf

Tendernotice_1.pdf

html

19164E22-E636-4022-AC8C-DE5D66BA3225.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders