Construction Of Purola To Chhara Motor Road Under Pmgsy Phase Xix Package No Ut13147
Tender Overview
Project Description
Construction Of Purola To Chhara Motor Road Under Pmgsy Phase Xix Package No Ut13147
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Feb-2020 | Corrigendum no.03/2020-21 letter no-3114 dated 17-02-2020 for date extension | Date | 27-Feb-2020 |
BOQ
| Name of Work: Construction of Purola to Chhara Motor Road Under PMGSY with Five Year Maintenance(PBMC) Length 2.050 KM | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work. | item 1 | 97.78 | Cum |
| 2 | 2 | Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge.. | item 2 | 90.2 | Cum |
| 3 | 3 | Random rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for cross drainage structures, retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge.. | item 3 | 98.02 | Cum |
| 4 | 4 | HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work. | item 4 | 15.2 | Cum |
| 5 | 5 | Plaster 1:4 in cement & sand mortor including supply of all materia, labour, T&P etc required for proper completeion of work | item 5 | 308.7 | Sqm |
| 6 | 6 | Providing edge stone on valley side of formation as per drawing and Technical specification Clause 1608.2.6 as per MORD spec. 1600 Sr. No. 8.9 | item 6 | 307.5 | Nos |
| 7 | 7 | Pointing 1:3 in cement & sand mortor including supply of all materia, labour, T&P etc required for proper completeion of work | item 7 | 36 | Sqm |
| 8 | 8 | P/L M10 grade P.C.C. in open foundation as per MoRD specification including all material labour T&P etc. as directed by Engineer in charge.technical Specification Clause- 800 of MORD. | item 8 | 1.94 | Cum |
| 9 | 9 | Excavation of cutting in soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embank ment site with a lift upto 1.50 m and lead upto 50 m as per Technical Specification Clouse 302.3 ( Making of Super Elevation ) ( H=(0.0+0.36)/2)=0.18 m. | item 9 | 593.6 | Cum |
| 10 | 10 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5\n\n\n\n | item 10 | 973.92 | Cum |
| 11 | 11 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) | item 11 | 329.3 | Cum |
| 12 | 12 | Construction of granular sub-base bywith local materials (Table 400.13) using naturally occuring gravel, spreading in uniform layers with motor grader on prepared surface ,mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Clause 401.4 as per Technical Specification Clause 408. | item 12 | 1091.82 | Cum |
| 13 | 13 | WBM Grading-2…..Manual Means\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screenings/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 of MORD Specification for Rural Roads 2014 | item 13 | 609.2 | Cum |
| 14 | 14 | WBM Grading 3\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | item 14 | 609.2 | Cum |
| 15 | 15 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. (Medium porosity) | item 15 | 7908.22 | Sqm |
| 16 | 16 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | item 16 | 7908.22 | Sqm |
| 17 | 17 | Providing laying and rolling of cold mixed open graded Premix carpet of 20 mm thickness composed of 13.2 mm and 11.2 mm Nominal size aggregates using penetration grade cationic bitumen emulsion (Medium setting MS grade complying with IS 8887) to required line, grade and level serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat of type B as per MORD Specification clause 506.2 | item 17 | 7908.22 | Sqm |
| 18 | 18 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 (Bitumen (VG-10)) | item 18 | 7908.22 | Sqm |
| 19 | 19 | White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 | item 19 | 157.2 | Sqm |
| 20 | 20 | Providing and laying 25 mm thick P.C.C. Coping Layer 1:2:4 cement concret. | item 20 | 27 | Sqm |
| 21 | 21 | Construction of Trapazoidal kutcha drain (0.60 m x 0.45 m) size as per drawing excluding gapes for C/D structures including excavation in all type of soil and rocks as met at site including supply of all materials, labour, T&P lead, lifts, disposal of excavated materials etc as per direction of Engineer-in-charge | item 21 | 830 | R/M |
| 22 | 22 | Providing and fixing of PMGSY Logo board at end point and every 2 Km, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 22 | 2 | Nos |
| 23 | 23 | Providing and fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 23 | 1 | Nos |
| 24 | 24 | Providing and fixing of Citizen information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 24 | 1 | Nos |
| 25 | 25 | Providing and fixing of Maintenance information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 25 | 1 | Nos |
| 26 | 26 | Maintainance Activities: | item 26 | ||
| 27 | 27 | Deploping Hydraulic Excavaters of 0.90 cum Bucket opening of road with required slip clearance in all type of soil, Rock and boulders including it oprator , fuel, all other charge and taxes required for proper complection of work. | item 27 | ||
| 28 | 28 | 1st Year (=2.050x6)=12.30Hrs. | item 28 | 12.3 | Hrs. |
| 29 | 29 | 2nd Year (=2.050x4)= 8.20 Hrs. | item 29 | 8.2 | Hrs. |
| 30 | 30 | 3rd Year (=2.050x3.5)= 6.46 Hrs. | item 30 | 6.46 | Hrs. |
| 31 | 31 | 4th Year (=2.050x3)= 6.15Hrs. | item 31 | 6.15 | Hrs. |
| 32 | 32 | 5th Year (=2.050x2)= 4.10 Hrs. | item 32 | 4.1 | Hrs. |
| 33 | 33 | Slip clearance in all type of soil, Rock and Boulders in major slip including cast of all material, machine, T&P and taxes etc required for proper complection of work as per MORd specifications, clause 1611. | item 33 | ||
| 34 | 34 | 1st Year = 40x2.050=82.00 | item 34 | 82 | Cum. |
| 35 | 35 | 2nd Year = 34x2.050= 69.70 | item 35 | 69.7 | Cum. |
| 36 | 36 | 3rd Year = 27x2.050= 55.35 | item 36 | 55.35 | Cum. |
| 37 | 37 | 4th Year = 20x2.050= 41.00 | item 37 | 41 | Cum. |
| 38 | 38 | 5th Year = 13.50x2.050= 27.68 | item 38 | 27.68 | Cum. |
| 39 | 39 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) | item 39 | ||
| 40 | 40 | 1st Year (=8.00x2.050)= 16.40 Cum. | item 40 | 16.4 | Cum. |
| 41 | 41 | 2nd Year(=6.00x2.050)= 12.30 Cum. | item 41 | 12.3 | Cum. |
| 42 | 42 | 3rd Year (=4.00x2.050)= 8.20 Cum. | item 42 | 8.2 | Cum. |
| 43 | 43 | 4th Year (=2.00x2.050)= 4.10 Cum. | item 43 | 4.1 | Cum. |
| 44 | 44 | 5th Year (=2.00x2.050)= 4.10 Cum. | item 44 | 4.1 | Cum. |
| 45 | 45 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 | item 45 | ||
| 46 | 46 | 1st Year (=2.050x4.0x3x1.5x1.25)= 46.13 Cum. | item 46 | 46.13 | Cum. |
| 47 | 47 | 2nd Year (=2.05x3.0x3x1.5x1.25)= 34.59 Cum. | item 47 | 34.59 | Cum. |
| 48 | 48 | 3rd Year (=2.05x2x3.0x1.5x1.25)= 23.06 Cum. | item 48 | 23.06 | Cum. |
| 49 | 49 | 4th Year (=2.05x2x3.0x1.5x1.25)= 23.06 Cum. | item 49 | 23.06 | Cum. |
| 50 | 50 | 5th Year (=2.05x2x3.0x1.5x1.25)= 23.06 Cum. | item 50 | 23.06 | Cum. |
| 51 | 52 | PBMC | item 51 | ||
| 52 | 53 | 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. \n2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907.\n3] Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 .\n4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.\n5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. \n6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910.\n7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.\n8] Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year).\n9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191. | item 52 | ||
| 53 | 54 | 1st Year | item 53 | 2.05 | Km. |
| 54 | 55 | 2nd Year | item 54 | 2.05 | Km. |
| 55 | 56 | 3rd Year | item 55 | 2.05 | Km. |
| 56 | 57 | 4th Year | item 56 | 2.05 | Km. |
| 57 | 58 | 5th Year | item 57 | 2.05 | Km. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender