Urgent Rectification Work Of Koorachipadi - Naduvattom Road Chainage Km 1/000 To 3/400 .
Tender Value
8.92 Lakhs
Estimated cost
Bid Submission
07 Feb 2020
0 days left
EMD
22315
Bank guarantee accepted
Document Fee
1970
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Shoranur → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Urgent Rectification Work Of Koorachipadi - Naduvattom Road Chainage Km 1/000 To 3/400 .
BOQ
| Work Name:Urgent rectification work of Koorachipadi - Naduvattom road chainage Km 1/000 to 3/400. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Civil Work | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001114 | 6.12 | cum |
| 3 | 1.02 | 55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | BI01010001010000000000000515BI0100001115 | 64.512 | cum |
| 4 | 1.03 | 3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | BI01010001010000000000000515BI0100001116 | 525 | sqm |
| 5 | 1.04 | 4.1.A.1 : Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 <br>\n Grading-I - Plant Mix MethodConstruction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method | BI01010001010000000000000515BI0100001117 | 78.75 | cum |
| 6 | 1.05 | 55.7.a : Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | BI01010001010000000000000515BI0100001118 | 52.5 | cum |
| 7 | 1.06 | 55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | BI01010001010000000000000515BI0100001119 | 12.012 | cum |
| 8 | 1.07 | 55.5.a : Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm. | BI01010001010000000000000515BI0100001120 | 6.12 | cum |
| 9 | 1.08 | 5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | BI01010001010000000000000515BI0100001121 | 1695 | sqm |
| 10 | 1.09 | od23915/2019_2020 : Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) 13.2 mm to .9 mm (Type B) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade and level to serve as wearing course on a previously prepared\r base, including mixing in a suitable Plant of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing manually to required level and grade. | BI01010001010000000000000515BI0100001122 | 1695 | sqm |
| 11 | 1.1 | 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | BI01010001010000000000000515BI0100001123 | 240 | cum |
| 12 | 1.11 | od23918/2019_2020 : Engaging man mazdoor | BI01010001010000000000000515BI0100001124 | 7 | each |
AI Tender Summary
Tender Timeline
Jan 31, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 07, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 10, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender