Item Description:- Racking of ballast within track in advance of BCM block with 4.2 m (2.1 m from C/L of track as\reither side) drawing ballast from sides as existing at site on cess, adequately before deep screening by BCM any\rkind of obstruction on track as rail post, boulder, rail etc. to be removed for making room for BCM within 4.2m of\rtrack in advance of BCM block.
4
02
002
35000.00
Per Track\rMetre
27.33
956550.00
AT Par
956550.00
5
Item Description:- Screening of addl. Width of ballast (as both sides of track) which dose not come under the\rslopeofBCM/FRMtocoincidewiththedepthscreenedbyBCM/FRMwithproperslopeformationasper\rspecification of IRPWM including dressing on either available cess complete. Screening to be done by 20mm\rsieve to separate clean ballast form muck and drawing ballast to the track (up to lead of 100m) wherever\rdeficiencyexiststohaveuniformballastsectionanddepositingmucksufficientlyawayfromtrackasper\rinstruction of engineer in charge or his representative at site. Muck shall not be thrown on the slope of cutting or\rinside the drain. This includes throwing muck away from catch water drain cutting. This work of addl. width has to\rbe done simultaneously along with BCM/FRM and work should be upto date behind the location where BCM/FRM\ris working. This item also includes dressing/disposal of muck released by BCM/FRM machine after screening.
6
03
003
35000.00
Per Track\rMetre
16.31
570850.00
AT Par
570850.00
7
ItemDescription:- Assisting BCM in pre-block work, during block work for making room for placing blades &\rcutting chain, removing unforeseen obstructions within the screening zone, such as rail post, boulders etc. For\rcarrying out the smooth work of BCM and making ramp with packing sleeper at the end of the day's work of BCM.\rNo payment shall be made for non block day or day on which machine is under break down. The rate includes\rrepacing of sleeper as per sleeper density, squaring of sleeper, recoupment of missing fittings etc..
8
04
004
35000.00
Per Track\rMetre
5.15
180250.00
AT Par
180250.00
9
Item Description:- Extra for the work over item no. 3 above during night time.
10
05
005
120000.00
Per Track\rMetre
5.96
715200.00
AT Par
715200.00
11
ItemDescription:- Assisting CSM/Duomatic machine during day/night for pre-block work to ensure smooth\rtamping. The rate includes taking pre-block measurements, opening of ballast, squaring of sleeper, opening of\rjoggled fish-plates, recoupment of missing fittings (fittings to be provided by Railway), removing wooden blocks\rand any other obstruction in tamping zone etc. as per direction of engineer in-charge or his representative.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.