Sales : +91-777 804 8217
| Name of Work: Evaluation of structural soundness of existing buildings/ Structures of Power and Utility Department of NRL | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Unit of measurement(UOM) | |
| 1 | 1 | Chlorinator Room of Cooling tower | NIL1 | ||
| 2 | 1.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings. | NIL2 | 25 | NOS |
| 3 | 1.02 | Physical observations on all RCC members | NIL3 | 50 | NOS |
| 4 | 1.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCarrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test | NIL4 | 23 | NOS |
| 5 | 1.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL5 | 25 | NOS |
| 6 | 1.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n | NIL6 | 25 | NOS |
| 7 | 1.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Carbonation test\n\n | NIL7 | 12 | NOS |
| 8 | 1.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor - Ultrasonic Pulse Velocity test\n | NIL8 | 16 | NOS |
| 9 | 1.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor - Rebound Hammer test\n | NIL9 | 17 | NOS |
| 10 | 1.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor -Cover Meter Test\n\n | NIL10 | 17 | NOS |
| 11 | 1.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor -Carbonation\n | NIL11 | 12 | NOS |
| 12 | 1.11 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL12 | 224 | M2 |
| 13 | 1.12 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL13 | 1 | LS |
| 14 | 1.13 | Furnishing structural audit report and structural adequacy certificate\n | NIL14 | 1 | LS |
| 15 | 2 | Cold water Basin of cooling tower | NIL15 | ||
| 16 | 2.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings. | NIL16 | 80 | NOS |
| 17 | 2.02 | Physical observations on all RCC members at all levels | NIL17 | 350 | NOS |
| 18 | 2.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCold water basin level plus tie beam level -Ultrasonic Pulse Velocity test\n | NIL18 | 80 | NOS |
| 19 | 2.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCold water basin level plus tie beam level -Rebound Hammer test\n\n | NIL19 | 90 | NOS |
| 20 | 2.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCold water basin level plus tie beam level - Cover Meter Test\n\n\n | NIL20 | 90 | NOS |
| 21 | 2.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCold water basin level plus tie beam level - Half Cell Potential test\n\n\n | NIL21 | 10 | NOS |
| 22 | 2.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nCold water basin level plus tie beam level - Carbonation test\n\n | NIL22 | 30 | NOS |
| 23 | 2.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFan deck level plus tie beam level - Ultrasonic Pulse Velocity test\n\n | NIL23 | 80 | NOS |
| 24 | 2.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFan deck level plus tie beam level - Rebound Hammer test\n\n\n | NIL24 | 90 | NOS |
| 25 | 2.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFan deck level plus tie beam level - Cover Meter Test\n\n | NIL25 | 90 | NOS |
| 26 | 2.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFan deck level plus tie beam level - Half Cell Potential test\n\n | NIL26 | 10 | NOS |
| 27 | 2.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFan deck level plus tie beam level - Carbonation test\n | NIL27 | 30 | NOS |
| 28 | 2.13 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL28 | 1332 | M2 |
| 29 | 2.14 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL29 | 1 | LS |
| 30 | 2.15 | Furnishing structural audit report and structural adequacy certificate\n | NIL30 | 1 | LS |
| 31 | 3 | DM Plant (SAK & SHL) | NIL31 | ||
| 32 | 3.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL32 | 3 | NOS |
| 33 | 3.02 | Physical observations on all RCC members at all levels\n | NIL33 | 12 | NOS |
| 34 | 3.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSAK -Ultrasonic Pulse Velocity test\n | NIL34 | 4 | NOS |
| 35 | 3.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSAK -Rebound Hammer test\n\n | NIL35 | 4 | NOS |
| 36 | 3.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSAK - Cover Meter Test\n\n\n | NIL36 | 4 | NOS |
| 37 | 3.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSAK - Half Cell Potential test\n\n\n | NIL37 | 5 | NOS |
| 38 | 3.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSAK - Carbonation test\n\n | NIL38 | 4 | NOS |
| 39 | 3.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSHL- Ultrasonic Pulse Velocity test\n\n | NIL39 | 8 | NOS |
| 40 | 3.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSHL- Rebound Hammer test\n\n\n | NIL40 | 8 | NOS |
| 41 | 3.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSHL - Cover Meter Test\n\n | NIL41 | 8 | NOS |
| 42 | 3.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSHL- Half Cell Potential test\n\n | NIL42 | 8 | NOS |
| 43 | 3.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSHL- Carbonation test\n | NIL43 | 8 | NOS |
| 44 | 3.13 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL44 | 1 | LS |
| 45 | 3.14 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL45 | 1 | LS |
| 46 | 3.15 | Furnishing structural audit report and structural adequacy certificate\n | NIL46 | 1 | LS |
| 47 | 4 | Fire Water Pump House | NIL47 | ||
| 48 | 4.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL48 | 50 | NOS |
| 49 | 4.02 | Physical observations on all RCC members at all levels\n | NIL49 | 100 | NOS |
| 50 | 4.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test\n\n | NIL50 | 80 | NOS |
| 51 | 4.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL51 | 130 | NOS |
| 52 | 4.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n | NIL52 | 80 | NOS |
| 53 | 4.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Carbonation test\n\n | NIL53 | 25 | NOS |
| 54 | 4.07 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL54 | 754 | M2 |
| 55 | 4.08 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL55 | 1 | LS |
| 56 | 4.09 | Furnishing structural audit report and structural adequacy certificate\n | NIL56 | 1 | LS |
| 57 | 5 | Light wt. roof building- Nitrogen Plant | NIL57 | ||
| 58 | 5.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL58 | 10 | NOS |
| 59 | 5.02 | Physical observations on all RCC members at all levels\n | NIL59 | 20 | NOS |
| 60 | 5.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor columns- Ultra Sonic thickness gauging\n | NIL60 | 8 | NOS |
| 61 | 5.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor columns - weld/joint checking\n\n | NIL61 | 16 | NOS |
| 62 | 5.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor columns - DPT\n | NIL62 | 8 | NOS |
| 63 | 5.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nTruss - Ultra Sonic thickness gauging\n\n | NIL63 | 20 | NOS |
| 64 | 5.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nTruss - weld/joint checking\n\n | NIL64 | 15 | NOS |
| 65 | 5.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nTruss -DPT\n\n\n\n | NIL65 | 10 | NOS |
| 66 | 5.09 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL66 | 1 | LS |
| 67 | 5.1 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL67 | 1 | LS |
| 68 | 5.11 | Furnishing structural audit report and structural adequacy certificate\n | NIL68 | 1 | LS |
| 69 | 6 | MCC building & Control room - Nitrogen Plant | NIL69 | ||
| 70 | 6.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL70 | 25 | NOS |
| 71 | 6.02 | Physical observations on all RCC members at all levels\n | NIL71 | 35 | NOS |
| 72 | 6.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor Tie beam level - Ultrasonic Pulse Velocity test\n\n | NIL72 | 14 | NOS |
| 73 | 6.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor Tie beam level - Rebound Hammer test\n | NIL73 | 14 | NOS |
| 74 | 6.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor Tie beam level - Cover Meter Test\n | NIL74 | 14 | NOS |
| 75 | 6.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor Tie beam level - Carbonation test\n\n | NIL75 | 7 | NOS |
| 76 | 6.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - Ultrasonic Pulse Velocity test\n | NIL76 | 3 | NOS |
| 77 | 6.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - Rebound Hammer test\n | NIL77 | 5 | NOS |
| 78 | 6.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level -Cover Meter Test\n\n | NIL78 | 5 | NOS |
| 79 | 6.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level -Carbonation\n | NIL79 | 3 | NOS |
| 80 | 6.11 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL80 | 1 | LS |
| 81 | 6.12 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL81 | 1 | LS |
| 82 | 6.13 | Furnishing structural audit report and structural adequacy certificate\n | NIL82 | 1 | LS |
| 83 | 7 | Clarifloculator- Raw water treatment Plant | NIL83 | ||
| 84 | 7.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL84 | 30 | NOS |
| 85 | 7.02 | Physical observations on all RCC members at all levels\n | NIL85 | 650 | NOS |
| 86 | 7.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRC walls -Ultrasonic Pulse Velocity test\n | NIL86 | 25 | NOS |
| 87 | 7.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRC walls -Rebound Hammer test\n\n | NIL87 | 40 | NOS |
| 88 | 7.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRC walls - Cover Meter Test\n\n\n | NIL88 | 50 | NOS |
| 89 | 7.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRC walls - Half Cell Potential test\n\n\n | NIL89 | 10 | NOS |
| 90 | 7.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRC walls - Carbonation test\n\n | NIL90 | 20 | NOS |
| 91 | 7.08 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL91 | 1000 | M2 |
| 92 | 7.09 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL92 | 1 | LS |
| 93 | 7.1 | Furnishing structural audit report and structural adequacy certificate\n | NIL93 | 1 | LS |
| 94 | 8 | Air Blower, Effluent Sump, Overhead rese | NIL94 | ||
| 95 | 8.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL95 | 30 | NOS |
| 96 | 8.02 | Physical observations on all RCC members at all levels\n | NIL96 | 150 | NOS |
| 97 | 8.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nBasement- Ultrasonic Pulse Velocity test\n | NIL97 | 45 | NOS |
| 98 | 8.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nBasement-Rebound Hammer test\n\n | NIL98 | 45 | NOS |
| 99 | 8.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nBasement - Cover Meter Test\n\n\n | NIL99 | 30 | NOS |
| 100 | 8.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nBasement - Carbonation test\n\n | NIL100 | 10 | NOS |
| 101 | 8.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nFirst tie level - 103.05 lvl-Ultrasonic Pulse Velocity test\n | NIL101 | 45 | NOS |
| 102 | 8.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nFirst tie level - 103.05 lvl-Rebound Hammer test\n | NIL102 | 45 | NOS |
| 103 | 8.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nFirst tie level - 103.05 lvl-Cover Meter Test\n\n | NIL103 | 45 | NOS |
| 104 | 8.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nFirst tie level - 103.05 lvl-Carbonation\n\n\n | NIL104 | 10 | NOS |
| 105 | 8.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Ultrasonic Pulse Velocity test\n\n\n | NIL105 | 45 | NOS |
| 106 | 8.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Rebound Hammer test\n\n | NIL106 | 48 | NOS |
| 107 | 8.13 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Cover Meter Test\n\n\n | NIL107 | 47 | NOS |
| 108 | 8.14 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround floor - Carbonation\n\n\n | NIL108 | 12 | NOS |
| 109 | 8.15 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSecond tie level - 106.70 lvl-Ultrasonic Pulse Velocity test\n\n | NIL109 | 45 | NOS |
| 110 | 8.16 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSecond tie level - 106.70 lvl-Rebound Hammer test\n\n\n | NIL110 | 45 | NOS |
| 111 | 8.17 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSecond tie level - 106.70 lvl-Cover Meter Test\n\n\n | NIL111 | 45 | NOS |
| 112 | 8.18 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nSecond tie level - 106.70 lvl-Carbonation\n\n | NIL112 | 10 | NOS |
| 113 | 8.19 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - 110.05 lvl- Ultrasonic Pulse Velocity test\n | NIL113 | 51 | NOS |
| 114 | 8.2 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - 110.05 lvl- Rebound Hammer test\n | NIL114 | 51 | NOS |
| 115 | 8.21 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - 110.05 lvl- Cover Meter Test\n | NIL115 | 47 | NOS |
| 116 | 8.22 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - 110.05 lvl- Carbonation\n | NIL116 | 32 | NOS |
| 117 | 8.23 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - 113.37 lvl- Ultrasonic Pulse Velocity test\n | NIL117 | 31 | NOS |
| 118 | 8.24 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - 113.37 lvl- Rebound Hammer test\n | NIL118 | 31 | NOS |
| 119 | 8.25 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - 113.37 lvl- Cover Meter Test\n | NIL119 | 27 | NOS |
| 120 | 8.26 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level - 113.37 lvl- Carbonation\n | NIL120 | 27 | NOS |
| 121 | 8.27 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL121 | 1000 | M2 |
| 122 | 8.28 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL122 | 1 | LS |
| 123 | 8.29 | Furnishing structural audit report and structural adequacy certificate\n | NIL123 | 1 | LS |
| 124 | 9 | Chemical house - Raw water treatment plant | NIL124 | ||
| 125 | 9.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL125 | 50 | NOS |
| 126 | 9.02 | Physical observations on all RCC members at all levels\n | NIL126 | 175 | NOS |
| 127 | 9.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test | NIL127 | 40 | NOS |
| 128 | 9.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL128 | 45 | NOS |
| 129 | 9.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n\n | NIL129 | 45 | NOS |
| 130 | 9.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Half Cell Potential\n\n | NIL130 | 10 | NOS |
| 131 | 9.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Chemical analysis of concrete samples\n\n | NIL131 | 3 | NOS |
| 132 | 9.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Carbonation test\n\n\n | NIL132 | 15 | NOS |
| 133 | 9.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Ultrasonic Pulse Velocity test\n\n | NIL133 | 35 | NOS |
| 134 | 9.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Rebound Hammer test\n\n\n | NIL134 | 41 | NOS |
| 135 | 9.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Cover Meter Test\n\n | NIL135 | 41 | NOS |
| 136 | 9.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Half Cell Potential test\n\n\n | NIL136 | 10 | NOS |
| 137 | 9.13 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Chemical analysis of concrete samples\n\n\n\n | NIL137 | 2 | NOS |
| 138 | 9.14 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Carbonation test\n | NIL138 | 13 | NOS |
| 139 | 9.15 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nTerrace level-Ultrasonic Pulse Velocity test\n | NIL139 | 8 | NOS |
| 140 | 9.16 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nTerrace level-Rebound Hammer test\n | NIL140 | 8 | NOS |
| 141 | 9.17 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nTerrace level-Cover Meter Test\n\n | NIL141 | 8 | NOS |
| 142 | 9.18 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nTerrace level-Carbonation\n\n\n | NIL142 | 5 | NOS |
| 143 | 9.19 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL143 | 467 | M2 |
| 144 | 9.2 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL144 | 1 | LS |
| 145 | 9.21 | Furnishing structural audit report and structural adequacy certificate\n | NIL145 | 1 | LS |
| 146 | 10 | Filter House - Raw water treatment plant | NIL146 | ||
| 147 | 10.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL147 | 25 | NOS |
| 148 | 10.02 | Physical observations on all RCC members at all levels\n | NIL148 | 80 | NOS |
| 149 | 10.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test | NIL149 | 38 | NOS |
| 150 | 10.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL150 | 43 | NOS |
| 151 | 10.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n\n | NIL151 | 38 | NOS |
| 152 | 10.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Carbonation test\n\n\n | NIL152 | 12 | NOS |
| 153 | 10.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Ultrasonic Pulse Velocity test\n\n | NIL153 | 35 | NOS |
| 154 | 10.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Rebound Hammer test\n\n\n | NIL154 | 45 | NOS |
| 155 | 10.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Cover Meter Test\n\n | NIL155 | 45 | NOS |
| 156 | 10.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nFirst floor level - Carbonation test\n | NIL156 | 9 | NOS |
| 157 | 10.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level-Ultrasonic Pulse Velocity test\n | NIL157 | 25 | NOS |
| 158 | 10.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level-Rebound Hammer test\n | NIL158 | 45 | NOS |
| 159 | 10.13 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof level-Cover Meter Test\n\n | NIL159 | 40 | NOS |
| 160 | 10.14 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof level-Carbonation\n\n\n | NIL160 | 7 | NOS |
| 161 | 10.15 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL161 | 550 | M2 |
| 162 | 10.16 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL162 | 1 | LS |
| 163 | 10.17 | Furnishing structural audit report and structural adequacy certificate\n | NIL163 | 1 | LS |
| 164 | 11 | Filtered Water Reservoir and Pump House | NIL164 | ||
| 165 | 11.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL165 | 150 | NOS |
| 166 | 11.02 | Physical observations on all RCC members at all levels\n | NIL166 | 200 | NOS |
| 167 | 11.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test | NIL167 | 140 | NOS |
| 168 | 11.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL168 | 140 | NOS |
| 169 | 11.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n\n | NIL169 | 40 | NOS |
| 170 | 11.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Carbonation test\n\n\n | NIL170 | 20 | NOS |
| 171 | 11.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level-Ultrasonic Pulse Velocity test\n | NIL171 | 50 | NOS |
| 172 | 11.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nRoof level-Rebound Hammer test\n | NIL172 | 75 | NOS |
| 173 | 11.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof level-Cover Meter Test\n\n | NIL173 | 45 | NOS |
| 174 | 11.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof level-Carbonation\n\n\n | NIL174 | 10 | NOS |
| 175 | 11.11 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof truss-Ultra Sonic thickness gauging\n\n | NIL175 | 30 | NOS |
| 176 | 11.12 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof truss-weld/joint checking\n | NIL176 | 75 | NOS |
| 177 | 11.13 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\nRoof truss-DPT | NIL177 | 20 | NOS |
| 178 | 11.14 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL178 | 2225 | M2 |
| 179 | 11.15 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL179 | 1 | LS |
| 180 | 11.16 | Furnishing structural audit report and structural adequacy certificate\n | NIL180 | 1 | LS |
| 181 | 12 | CPP Control Room Building | NIL181 | ||
| 182 | 12.01 | Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.\n | NIL182 | 25 | NOS |
| 183 | 12.02 | Physical observations on all RCC members at all levels\n | NIL183 | 200 | NOS |
| 184 | 12.03 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Ultrasonic Pulse Velocity test | NIL184 | 35 | NOS |
| 185 | 12.04 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Rebound Hammer test\n | NIL185 | 35 | NOS |
| 186 | 12.05 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\nGround Floor- Cover Meter Test\n\n | NIL186 | 35 | NOS |
| 187 | 12.06 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n1st floor level-Ultrasonic Pulse Velocity test\n | NIL187 | 35 | NOS |
| 188 | 12.07 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n1st floor level-Rebound Hammer test\n | NIL188 | 35 | NOS |
| 189 | 12.08 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\n1st floor level-Cover Meter Test\n\n | NIL189 | 35 | NOS |
| 190 | 12.09 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\n1st floor level-Half Cell Potential test\n\n\n | NIL190 | 35 | NOS |
| 191 | 12.1 | Carrying out NDT/Insitu tests on all rc members at ground and first floor level selected on criticality basis.\n\n1st floor level-Carbonation\n\n\n | NIL191 | 10 | NOS |
| 192 | 12.11 | Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs\n | NIL192 | 2500 | M2 |
| 193 | 12.12 | Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required\n | NIL193 | 1 | LS |
| 194 | 12.13 | Furnishing structural audit report and structural adequacy certificate | NIL194 | 1 | LS |
| 195 | 13 | Phase- II SITE SUPERVISION | NIL195 | ||
| 196 | 13.01 | Site supervision during execution | NIL196 | 20 | MDY |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy