Labour And Cartage Of Peg
Tender Overview
Project Description
Labour And Cartage Of Peg , Description And Basic Rates Of Transportation , Unloading Of Foodgrains From Cart / Trucks And Stacking Thereof In The Godown ( 35 . 00 Per Bag ) , Lifting And Carying Of Rice Bags From Temporary Stacking Yard And Stacking Thereof In The Godowns Upto 75 Ft Distance ( 35 . 00 Per Bag ) , Lifting And Carying Of Foodgrain Stock From Temporary Stacking Yard And Stacking In The Godowns For Distance More Than Upto 75 Ft , But Upto 150Ft ( 45 . 00 Per Bag ) , De-Stacking And Loading Of Food Grains Into Carts / Trucks ( 30 . 00 Bag ) , Changing Of Bags ( Re-Conditioning Of Bags ) Including Pallai Into Another , Opening Sewing And Weighment . ( 20 . 00 Bag ) , Removing Of Bags From Platform / Road And Stacking In The Godown:- A ) Without Weighment ( 10 . 00 Per Bag ) B ) Including Weighment On Beam Scale / Platform Scale . ( 15 . 00 Bag ) , Unloading Of Rice Of The Rice Miller And Temprrary Stacking Thereof In Temporary Stacking Yard For Inspection And 10% Test Weighment ( 50 . 00 Per Bag ) , Loading Of Rice Stocks From Temporary Stacking Yard And Loading Into Trucks / Carts In Case Of Rejection Of Rice Stocks . ( 25 . 00 Per Bag ) , A ) Sutli For Re-Bagging ( Flat Rate ) ( 15 . 00 Per Bag ) B ) Machine Stitching ( Flat Rate ) ( 75 . 00 Per Bag ) , Stacking Of Reconditioned Bags In The Same Godown ( 6 . 50 Per Bag ) , Loading Of Reconditioned Bags Into Carts / Trucks ( 6 . 50 Per Bag ) , Sewing After Pura Karal ( Brining To Standard Weight ) When Re-Bagging Is Not Involved Including Weighment ( 20 . 00 Per Bag ) , A ) Shifting Of Bags From One Stack To Another Stack In The Same Godown Where Carriage Is Not Involved . ( 16 . 50 Per Bag ) B ) Where Carriage Is Involved ( 23 . 00 Oer Bag ) , Shifting Of Bags From One Godown To Another Godown Including Cartage ( Upto 500 Metres No Premium Allowed ) ( 37 . 50 Per Bag ) , Removing Out Of Godowns , Weighing On Platform / Beam Scale And Restacking In Godown After P . V . Of Stocks . ( 16 . 00 Per Bag ) , Collection Of Loose / Spilled Grains Cart / Truck / Godown Cleaning And Filling In Bags Upto Prescribed Weight Including Weighment And Sewing ( 35 . 00 Per Bag ) , Unloading Of Gunny Bales From Carts / Trucks And Stacking In Godown Up To Minimum 3 Layer Height . 2 . . 50 Per Lable & 1 . 00 Per Lable , I ) Jute ( 3 . 40 Per Bag ) Ii ) Hdpe ( 1 . 40 Per Bag ) , Collection Of Loose Gunnies , Bundling Them I . E . 25 Gunnies In A Bundle , Tying / Sewing Of Bundles Including Cost Of Sutli And Stacking In Designated Area Or Loading Into Transport Vechicle ( 10 . 00 Per Bag ) , Loading Of Bundles Into Trucks / Carts Etc . ( 5 . 00 Per Bundle ) , Unloading Of Wooden Crates From Trucks / Carts And Placing In Countable Manner In Godown / Plinth . ( 1 . 00 Per Crate ) , Loading Of Wooden Crates Into Truck / Carts Etc . ( 1 . 00 Per Crate ) , Unloading Of Tarpaulins / Poly Covers From Transport Vechicle And Stacking In Godown Etc In Countable Manner ( 1 . 00 Per Unit ) , Loading Of Tarpaulins / Polythene Covers Into Trucls / Carts Etc . ( 1 . 00 Per Unit ) , Local Cartage Of Wooden Crates Tarpaulins / Polythene Covers . ( 20 Per Hundred Unit )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 05-Feb-2020 | Date Extend Corrigendum | Date | 17-Feb-2020 |
BOQ
| Name of Work: | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Description and Basic rates of Transportation | |||
| 2 | 1.01 | Unloading of foodgrains from Cart/trucks and stacking thereof in the godown (35.00 per bag) | 1 | Nos | |
| 3 | 1.02 | Lifting and carying of Rice bags from temporary stacking yard and stacking thereof in the godowns upto 75 ft distance (35.00 per bag) | 1 | Nos | |
| 4 | 1.03 | Lifting and carying of foodgrain stock from temporary stacking yard and stacking in the godowns for distance more than upto 75 ft , but upto 150ft (45.00 per bag) | 1 | Nos | |
| 5 | 1.04 | De-stacking and loading of food grains into carts/trucks (30.00 bag) | 1 | Nos | |
| 6 | 1.05 | Changing of bags (re-conditioning of bags) including pallai into another, opening sewing and weighment. (20.00 bag) | 1 | Nos | |
| 7 | 1.06 | Removing of bags from platform/road and stacking in the godown:- a) Without weighment (10.00 per bag) b) Including weighment on beam scale/platform scale. (15.00 bag) | 1 | Nos | |
| 8 | 1.07 | Unloading of Rice of the Rice Miller and Temprrary stacking thereof in temporary stacking yard for inspection and 10% test weighment (50.00 per bag) | 1 | Nos | |
| 9 | 1.08 | Loading of Rice stocks from temporary stacking yard and loading into trucks/carts in case of rejection of rice stocks. (25.00 per bag) | 1 | Nos | |
| 10 | 1.09 | a) Sutli for re-bagging(Flat rate) (15.00 per bag) b) Machine stitching (Flat rate) (75.00 per bag) | 1 | Nos | |
| 11 | 1.1 | Stacking of reconditioned bags in the same godown (6.50 per bag) | 1 | Nos | |
| 12 | 1.11 | Loading of reconditioned bags into carts/ trucks (6.50 per bag) | 1 | Nos | |
| 13 | 1.12 | Sewing after Pura Karal (brining to standard weight) when re-bagging is not involved including weighment (20.00 per bag) | 1 | Nos | |
| 14 | 1.13 | a) Shifting of bags from one stack to another stack in the same godown where carriage is not involved. (16.50 per bag) B) Where carriage is involved (23.00 oer bag) | 1 | Nos | |
| 15 | 1.14 | Shifting of bags from one godown to another godown including cartage (upto 500 metres no premium allowed) (37.50 per bag) | 1 | Nos | |
| 16 | 1.15 | Removing out of godowns, weighing on platform/beam scale and restacking in godown after P.V. of stocks. (16.00 per bag) | 1 | Nos | |
| 17 | 1.16 | Collection of loose/spilled grains cart/truck/godown cleaning and filling in bags upto prescribed weight including weighment and sewing (35.00 per bag) | 1 | Nos | |
| 18 | 1.17 | Unloading of gunny bales from carts/trucks and Stacking in godown up to minimum 3 layer height. 2..50 per lable & 1.00 per lable | 1 | Nos | |
| 19 | 1.18 | i) Jute (3.40 per bag) ii) HDPE (1.40 per bag) | 1 | Nos | |
| 20 | 1.19 | Collection of loose gunnies, bundling them i.e. 25 gunnies in a bundle, tying/sewing of bundles including cost of sutli and stacking in designated area or loading into transport vechicle (10.00 per bag) | 1 | Nos | |
| 21 | 1.2 | Loading of bundles into trucks/carts etc. (5.00 per bundle) | 1 | Nos | |
| 22 | 1.21 | Unloading of wooden crates from Trucks/carts and placing in countable manner in godown/plinth. (1.00 per crate) | 1 | Nos | |
| 23 | 1.22 | Loading of wooden crates into truck/carts etc. (1.00 per crate) | 1 | Nos | |
| 24 | 1.23 | Unloading of tarpaulins/ poly covers from Transport vechicle and stacking in godown etc in countable manner (1.00 per unit) | 1 | Nos | |
| 25 | 1.24 | Loading of tarpaulins/polythene covers into trucls/carts etc. (1.00 per unit) | 1 | Nos | |
| 26 | 1.25 | Local cartage of wooden crates Tarpaulins/ Polythene covers. (20 per hundred unit) | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender