Jammu And Kashmir Small Scale Industries Development Corporation Limited has published Construction Of Water Storage Tank Rcc Sump At Industrial Estate Bamk Srinagar. Submission Date for this Tender is 10-02-2020. Tanks and Cylinders Tenders in BAMK Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Construction of Water Storage tank (RCC sump) at Industrial Estate BAMK Srinagar. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Earthwork in excavation by mech. Means in foundation trenches, drains, pipes and cable etc. (not exceeding 1.5 mtr in width or 10 Sqm on plan) including dressing of sides and ramming of bottom, lift upto 1.5 mtr including getting out excavated soil and disposal of surplus excavated soil. | 397 | Cum | |
2 | 1.02 | Supplying/ fixing dry stone soling tightly (hand packed) under foundation and under floors including all leads, lifts and all carriages upto site of work complete. | 31.86 | Cum | |
3 | 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level in 1:4:8 ( 1 cement :4 coarse sand :8 graded stone aggregate 40mm N/S including loading , unloading and carriage complete (nallah) under raft and flooring. | 9.17 | Cum | |
4 | 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering in foundation and plinth in 1:2:4 ( 1 cement :2 coarse sand : 4 graded stone aggregate 20mm N/S including all carriage upto site of work complete | 25.1 | Cum | |
5 | 1.05 | Providing and laying in position specified grade of reinforcement cement concrete excluding cost of centering , shuttering, finishing and reinforcement all work upto floor v level 1:1.5:3 1 (Cement : 1.5 coarse sand : 3 graded stone aggregate 20mm N/S) using crushed including all carriage upto site of work complete. | 88 | Cum | |
6 | 1.06 | Reinforcement for RCC work incl straightening, cutting, bending, placing in position and binding all complete. Thermo Mechanically treated bars including all carriages complete. | 105.6 | Qtl | |
7 | 1.07 | Applying 15mm thick plaster on walls in 1:3 mix. | 206.7 | Sqm | |
8 | 1.08 | Cement concrete flooring 1:2:4 1 (Cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including all carriages upto site of work complete. | 55.74 | Sqm | |
9 | 1.09 | Centering and shuttering including strutting, propping and removal of form for walls, columns, slab, beams etc. | 410.86 | Sqm | |
10 | 1.1 | Disposal of excavated earth from site of work to dumping site outside the industria Estate including loading and all carriages complete job. | 1 | Job | |
11 | 1.11 | Providing and fixing of water proofing sheet (bituminous sheet) of standard manufacture. | 650 | Sft | |
12 | 1.12 | Supplying and laying GI pipe of following dia of standard make.\na)4” dia \n | 200 | Rm | |
13 | 1.13 | b)1 ½ “ dia | 300 | Rm |