Overhauling Of Various Deck Machinery On Ins Sujata, HSL Visakhapatnam-Andhra Pradesh

Hindustan Shipyard Limited has published Overhauling Of Various Deck Machinery On Ins Sujata. Submission Date for this Tender is 08-02-2020. Wrenches and Drivers Tenders in HSL Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

23408440
Corrigendum : Overhauling Of Various Deck Machinery On Ins Sujata
Open Tender
Indian
Andhra Pradesh
HSL Visakhapatnam
08-02-2020

Tender Details

Overhauling Of Various Deck Machinery On Ins Sujata , Sow For Complete Overhauling Of Windlass , Make : Young Shin Heavy Machinery Ltd , Ysc 7509 E: ( Job No: 24 To 24 . 11 ) The Following Complete Overhauling / Repair Works Are To Be Carried Out On Anchor Windlass And Its Gearbox With Their Auxiliary Systems And Equipments . And Alignment To Be Carried Out With Motors , Equipment To The Satisfaction Of Ship Staff / Hsl . The Works Involves Removal , Refitment Of Total Equipment , Gear Box Overhauling Along With Renewal Of Bearings ( Skf With Oem Or Authorized Dealer With Test Certificate ) , Bushes , Sleeves , Oil Seals , Pulleys , Chains , Couplings , Pinion Gear Wheels , Gypsy , Winch Drums , Gaurds , Hull Neck Bearings/Bushes , Oil Gauge Glasses , Oil Breathers If Required All End Covers To Be Replaced , Drums Dismantling , Renewal Of All Drum Bushes And Zipsy Bushes , If Found Any Wear To Be Built Up And Machining To Be Carried Out On The Equipment ( Like Drums , Gear Boxs . ) , Brake Bands & Liners To Be Renewed . Note: Gearbox Oil Draining , Grease Nipples Renewal , Greasing Of Gear Box , Oil Breathers & Oil Level Indicators Renewal Covered In Contracors Scope . Post Completion Of All Repairs , System To Be Proved To The Satisfaction Of Ship Staff / Naval Trial Agency / Hsl . Defects / Observations Brought Out During Trials By Naval Trial Agency To Be Liquidated And Trials/Inspection To Be Reoffered . , Remove The Entire Windlass And Take To The Shop Floor , Open Up Each Part , Clean , And Offer For Survey To Project Team . After Completion Of All Repair Works , The Same Is To Be Fitted Back To Its Position . , Renew The Main Gear Cover As Per Sample . ( Mat: Ms 3Mm Sheet ) . Fabrication With Materials And Drilling Of Holes Is Contractors Scope . Renew The Motor And Mechanical Gear Connecting Chain Sprocket/Coupling Cover . Chain And Sprocket Coupling To Be Arranged By Contractor . , Undertake Survey Of The Main Shaft ( 01 No ) And Carry Out Metal Build At Affected Locations . Metal Buildup And Machining To Tolerance Sizes Is Contractors Scope . Undertake Metal Build Up On Both The Warping Drums ( 02 Nos ) And Ensure Frictional Properties Are Not Affected For The Same . Metal Build Up And Machining Is Contractors Scope , Renew 01 Oil Level Indicator Tube On Winch Assembly . Indicator Arrangement And Associated Fittings To Be Provided By Contractor . Renew The Oil Drainage Stop Cock/Tap . Stop Cock Is To Be Arranged By Contractors . , Renew 02 In No Feredo Lining/Bandbrake Lining ( 3Wide , 8Mm Thick ) . Approx Length : 2Mtr Each ) Feredo Lining , Contractors Scope , Renew Fered-O-Lining/ Band Brake Lining . 3Wide , 1/2Thick , 6Mtr Long For Both Side . Best Quality Brake Bands Are To Provided By Contractor . After O/H Works , Equipment To Be Carriedout With Load Trials As Per Naval Standards And Proove Operational On All Respects To Naval Trial Agency . , Contractor Has To Quote Lumpsum Cost For Mandatory Spares Mentioned At S . No 2 Of Annexure - A In Mandatory Spares List , For The Entire Sow , Against Third Party/Oem Invoice For All Spares Supplied For The Scope . The Taxes Will Be Paid As Per Actuals . Mandatory List Of Spares Is Attached . Contractor Has Also To Quote All Line Items Mentioned In Mandatory Spares List ( S . No . 2 ) Seperately . The Price Quoted In Boq Wrt Under This Serial Should Match To The Total Price Furnished By The Bidder As Per The Detailed Price Breakup In Annexure A . In Case Of Any Discrepancy , The Amount Which Is Beneficiary To Hsl Would Be Considered At The Time Of Placement Of Order . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 8 ) Against Third Party/Oem Invoice . , Sow For Complete Overhauling Ofsingle Arm Boat Davit ( Dl No . 2044 - 2044 . 9 ) Oem-Unitek Engg . Pvt . Ltd . , Model- Bd-703 & Bd- 704: ( Job No: 22 . 01 To 22 . 13 ) The Following Complete Overhauling / Repair Works Are To Be Carried Out On Single Arm Boat Davit And Its Winch Gearboxes With Their Auxiliary Systems And Equipments . And Alignement To Be Carried Out With Motors , Equipment To The Satisfaction Of Ship Staff / Hsl . The Works Involves Removal , Refitment Of Total Equipment , Gear Box Overhauling Along With Renewal Of Bearings ( Skf With Oem Or Authorized Dealer With Test Certificate ) , Bushes , Sleeves , Oil Seals , Pulleys , Chains , Couplings , Pinion Gear Wheels , Gypsy , Winch Drums , Gaurds , Hull Neck Bearings/Bushes , Oil Gauge Glasses , Oil Breathers If Required All End Covers To Be Replaced , Drums Dismantling , Renewal Of All Drum Bushes And Zipsy Bushes , If Found Any Wear To Be Built Up And Machining To Be Carried Out On The Equipment ( Like Drums , Gear Boxs . ) , Break Bands & Liners To Be Renewed . Note: Gearbox Oil Draining , Grease Nipples Renewal , Greasing Of Gear Box , Oil Breathers & Oil Level Indicators Renewal Covered In Contracors Scope . Post Completion Of Repairs , System To Be Proved To The Satisfaction Of Ship Staff / Naval Trial Agency / Hsl . Defects / Observations Brought Out During Trials By Naval Trial Agency To Be Liquidated And Trials/Inspection To Be Reoffered . , Remove The Winch By Opening Fasteners From Its Foundation . Dismantle Spur Gear . Renew The Manual Operating Worm Gear . Dismatle The Ratchet Brake Arrangemnt . After Completion Of All Repair Works , The Same Are To Be Fitted Back In Its Positions . Renew Foundation Fasteners ( Mat: Ss , 16Mm Dia , 80Mm Long ) . Manual Operating Mechanism Of Both The Davit Not Working . Defect To Be Rectified By Making The System Operational And Proving Thereafter . Renew Oil Level Indicator Tube Of Davit Winch . Oil Level Indicator Arrangement With Fittings To Be Provided By Contractor . , Open Slewing Assembly Bearing Housing And Inspect Bearing For Play . Renew Defective Parts . Inspect The Worm Wheel Assembly For Any Wear And Presence Of Metallic Particles . Survey Wire Rope , Spare Gear And Other Associated Lifting Gears . Renew . Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Forgein Matter . Check Bearings For Collapse And Shaft For Rust And Corrosion . Renew . Check All Rotating Parts , Levers Etc For Free Movement . After O/H Works , Equipment To Be Carriedout With Load Trials As Per Naval Standards And Proove Operational On All Respects To Naval Trial Agency . , Examine Entire Brake Assembly Including Brake Lining , Brake Shoe , Brake Disk And Associated Fittings . Check Brake Lining On Winch And Change Liner Damaged . , After Completion Of Load Test , Examine The Complete Davit Structure And Associated Lifting Gears For Flaws , Distortion , Defectation Etc . Flaws Must Be Examined By Ndt Techniques . Carry Out Repairs And Retest . Record Results Of Test And Examination . , Contractor Has To Quote Lumpsum Cost For Mandatory Spares Mentioned At S . No 4 Of Annexure - A In Mandatory Spares List , For The Entire Sow , Against Third Party/Oem Invoice For All Spares Supplied For The Scope . The Taxes Will Be Paid As Per Actuals . Mandatory List Of Spares Is Attached . Contractor Has Also To Quote All Line Items Mentioned In Mandatory Spares List ( S . No . 4 ) Seperately . The Price Quoted In Boq Wrt Under This Serial Should Match To The Total Price Furnished By The Bidder As Per The Detailed Price Breakup In Annexure A . In Case Of Any Discrepancy , The Amount Which Is Beneficiary To Hsl Would Be Considered At The Time Of Placement Of Order . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Spe

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Feb-2020 Due date extension Date 06-02-2020
2 06-Feb-2020 Due date extension2 Date 08-02-2020

Key Value

Document Fees
INR 590 /-
EMD
INR 10000.0 /-
Tender Value
Refer document

BOQ Items

Name / Description: Overhauling of Various Deck Machinery on INS SUJATA
Sl. No. Item Description Job Nos Qty Units
1 1 SoW for COMPLETE OVERHAULING OF WINDLASS, MAKE : YOUNG SHIN HEAVY MACHINERY LTD,YSC 7509 E: ( Job No: 24 to 24.11)\nThe following Complete Overhauling / repair works are to be carried out on Anchor Windlass and its Gearbox with their auxiliary systems and equipments. And alignment to be carried out with motors, equipment to the satisfaction of ship staff / HSL. The works involves removal, refitment of total equipment, gear box overhauling along with renewal of bearings(SKF with OEM or Authorized dealer with test certificate), bushes, sleeves, oil seals, pulleys, chains, couplings, pinion gear wheels, gypsy, winch drums, gaurds, hull neck bearings/bushes, oil gauge glasses, oil breathers if required all end covers to be replaced, Drums dismantling, renewal of all drum bushes and zipsy bushes, if found any wear to be built up and machining to be carried out on the equipment (like drums, gear boxs.), Brake bands & liners to be renewed. Note: Gearbox oil draining, grease nipples renewal, greasing of gear box, oil breathers & oil level indicators renewal covered in contracors scope. Post completion of all repairs, System to be proved to the satisfaction of Ship staff / Naval trial agency / HSL. Defects / observations brought out during trials by Naval trial agency to be liquidated and trials/inspection to be reoffered.
2 2 REMOVE THE ENTIRE WINDLASS AND TAKE TO THE SHOP FLOOR, OPEN UP EACH PART, CLEAN, AND OFFER FOR SURVEY TO PROJECT TEAM. AFTER COMPLETION OF ALL REPAIR WORKS, THE SAME IS TO BE FITTED BACK TO ITS POSITION. 1 LS
3 3 RENEW THE MAIN GEAR COVER AS PER SAMPLE. (MAT: MS 3MM SHEET). FABRICATION WITH MATERIALS AND DRILLING OF HOLES IS CONTRACTORS SCOPE. RENEW THE MOTOR AND MECHANICAL GEAR CONNECTING CHAIN SPROCKET/COUPLING COVER. CHAIN AND SPROCKET COUPLING TO BE ARRANGED BY CONTRACTOR. 1 LS
4 4 UNDERTAKE SURVEY OF THE MAIN SHAFT (01 No) AND CARRY OUT METAL BUILD AT AFFECTED LOCATIONS. METAL BUILDUP AND MACHINING TO TOLERANCE SIZES IS CONTRACTORS SCOPE. UNDERTAKE METAL BUILD UP ON BOTH THE WARPING DRUMS (02 Nos) AND ENSURE FRICTIONAL PROPERTIES ARE NOT AFFECTED FOR THE SAME. METAL BUILD UP AND MACHINING IS CONTRACTORS SCOPE 1 LS
5 5 RENEW 01 OIL LEVEL INDICATOR TUBE ON WINCH ASSEMBLY. INDICATOR ARRANGEMENT AND ASSOCIATED FITTINGS TO BE PROVIDED BY CONTRACTOR. RENEW THE OIL DRAINAGE STOP COCK/TAP. STOP COCK IS TO BE ARRANGED BY CONTRACTORS. 1 LS
6 6 RENEW 02 IN NO FEREDO LINING/BANDBRAKE LINING (3"WIDE, 8MM THICK). APPROX LENGTH : 2MTR EACH) FEREDO LINING, CONTRACTOR'S SCOPE 4 MTRS
7 7 RENEW FERED-O-LINING/ BAND BRAKE LINING. 3"WIDE, 1/2"THICK, 6MTR LONG FOR BOTH SIDE. BEST QUALITY BRAKE BANDS ARE TO PROVIDED BY CONTRACTOR. AFTER O/H WORKS, EQUIPMENT TO BE CARRIEDOUT WITH LOAD TRIALS AS PER NAVAL STANDARDS AND PROOVE OPERATIONAL ON ALL RESPECTS TO NAVAL TRIAL AGENCY. 2 NOS
8 8 Contractor has to quote lumpsum cost for mandatory spares mentioned at S.No 2 of Annexure - A in Mandatory Spares List, for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. Mandatory List of Spares is attached. Contractor has also to quote all line items mentioned in Mandatory Spares List (S.No.2) seperately. The price quoted in BOQ wrt under this serial should match to the total price furnished by the bidder as per the detailed price breakup in Annexure A. In case of any discrepancy, the amount which is beneficiary to HSL would be considered at the time of placement of order. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (8) against third party/OEM invoice. \n 1 LS
9 9 SoW for COMPLETE OVERHAULING OFSINGLE ARM BOAT DAVIT (DL NO.2044 - 2044.9)OEM-UNITEK ENGG. PVT. LTD., MODEL- BD-703 & BD- 704: (Job No: 22.01 to 22.13)\nThe following Complete Overhauling / repair works are to be carried out on Single Arm Boat Davit and its Winch Gearboxes with their auxiliary systems and equipments. And alignement to be carried out with motors, equipment to the satisfaction of Ship staff / HSL. The works involves removal, refitment of total equipment, gear box overhauling along with renewal of bearings(SKF with OEM or Authorized dealer with test certificate), bushes, sleeves, oil seals, pulleys, chains, couplings, pinion gear wheels, gypsy, winch drums, gaurds, hull neck bearings/bushes, oil gauge glasses, oil breathers if required all end covers to be replaced, Drums dismantling, renewal of all drum bushes and zipsy bushes, if found any wear to be built up and machining to be carried out on the equipment (like drums, gear boxs.), Break bands & liners to be renewed. Note: Gearbox oil draining, grease nipples renewal, greasing of gear box, oil breathers & oil level indicators renewal covered in contracors scope. Post completion of repairs, System to be proved to the satisfaction of ship staff / Naval trial agency / HSL. Defects / observations brought out during trials by Naval trial agency to be liquidated and trials/inspection to be reoffered.
10 10 REMOVE THE WINCH BY OPENING FASTENERS FROM ITS FOUNDATION. DISMANTLE SPUR GEAR. RENEW THE MANUAL OPERATING WORM GEAR. DISMATLE THE RATCHET BRAKE ARRANGEMNT. AFTER COMPLETION OF ALL REPAIR WORKS, THE SAME ARE TO BE FITTED BACK IN ITS POSITIONS. RENEW FOUNDATION FASTENERS (MAT: SS, 16MM DIA, 80MM LONG). MANUAL OPERATING MECHANISM OF BOTH THE DAVIT NOT WORKING. DEFECT TO BE RECTIFIED BY MAKING THE SYSTEM OPERATIONAL AND PROVING THEREAFTER. RENEW OIL LEVEL INDICATOR TUBE OF DAVIT WINCH. Oil level indicator arrangement with fittings to be provided by contractor. 2 SETS
11 11 OPEN SLEWING ASSEMBLY BEARING HOUSING AND INSPECT BEARING FOR PLAY. RENEW DEFECTIVE PARTS. INSPECT THE WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES. SURVEY WIRE ROPE, SPARE GEAR AND OTHER ASSOCIATED LIFTING GEARS. RENEW. CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FORGEIN MATTER. CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION. RENEW. CHECK ALL ROTATING PARTS, LEVERS ETC FOR FREE MOVEMENT. AFTER O/H WORKS, EQUIPMENT TO BE CARRIEDOUT WITH LOAD TRIALS AS PER NAVAL STANDARDS AND PROOVE OPERATIONAL ON ALL RESPECTS TO NAVAL TRIAL AGENCY. 4 SETS
12 12 EXAMINE ENTIRE BRAKE ASSEMBLY INCLUDING BRAKE LINING, BRAKE SHOE, BRAKE DISK AND ASSOCIATED FITTINGS. Check brake lining on winch and change liner damaged. 4 SETS
13 13 AFTER COMPLETION OF LOAD TEST, EXAMINE THE COMPLETE DAVIT STRUCTURE AND ASSOCIATED LIFTING GEARS FOR FLAWS, DISTORTION, DEFECTATION ETC. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES. CARRY OUT REPAIRS AND RETEST. RECORD RESULTS OF TEST AND EXAMINATION. 4 NOS
14 14 Contractor has to quote lumpsum cost for mandatory spares mentioned at S.No 4 of Annexure - A in Mandatory Spares List, for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. Mandatory List of Spares is attached. Contractor has also to quote all line items mentioned in Mandatory Spares List (S.No.4) seperately. The price quoted in BOQ wrt under this serial should match to the total price furnished by the bidder as per the detailed price breakup in Annexure A. In case of any discrepancy, the amount which is beneficiary to HSL would be considered at the time of placement of order. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (14) against third party/OEM invoice. \n\n 1 LS
15 15 SoW for COMPLETE OVERHAULING OF ELECTRICAL CAPSTAN / WINDLASS, MAKE : YOUNG SHIN HEAVY MACHINERY LTD,YSC 7509 E: (Job No: 23 to 23.10)\nThe following Complete Overhauling / repair works are to be carried out on Anchor Windlass and its Gearbox with their auxiliary systems and equipments. And alignment to be carried out with motors, equipment to the satisfaction of ship staff / HSL. The works involves removal, refitment of total equipment, gear box overhauling along with renewal of bearings(SKF with OEM or Authorized dealer with test certificate), bushes, sleeves, oil seals, pulleys, chains, couplings, pinion gear wheels, gypsy, winch drums, gaurds, hull neck bearings/bushes, oil gauge glasses, oil breathers if required all end covers to be replaced, Drums dismantling, renewal of all drum bushes and zipsy bushes, if found any wear to be built up and machining to be carried out on the equipment (like drums, gear boxs.), Brake bands & liners to be renewed. Note: Gearbox oil draining, grease nipples renewal, greasing of gear box, oil breathers & oil level indicators renewal covered in contracors scope. Post completion of all repairs, System to be proved to the satisfaction of Ship staff / Naval trial agency / HSL. Defects / observations brought out during trials by Naval trial agency to be liquidated and trials/inspection to be reoffered.
16 16 TRIALS TO BE TAKEN AND OBSERVE FOR ANY ABNORMAL NOISE. LIST DOWN THE DEFECTS. REMOVE THE ENTIRE CAPSTON UNIT FROM SHIP AND SHIFT TO SHOP FLOOR. POST OVERHAULING TO BE BROUGHT TO SHIP AND FITMENT TO BE CARRIEDOUT WITH PROPER ALIGNMENT. 1 NO
17 17 REMOVE GEAR CASES AND EXAMINE SECONDARY AND PRIMARY WORM AND WORM WHEEL DRIVE. STRIP AND EXAMINE ALL THRUST AND ROLLER BEARINGS. EXAMINE SLIPPING CLUTCH AND MAGNETIC BRAKES. EXAMINE FLEXIBLE COUPLINGS BETWEEN MOTOR AND CLUTCHES. ADJUST THE SLIPPING CLUTCH AS NECESSARY. ANY DEFECTS ARE TO BE RECTIFIED. ADJUST ELECTROMAGNETIC BRAKE JAW AS PER MANUAL. ADJUST CLUTCH AND AIR GAP OF ELECTRO MAGNETIC BRAKE (AIR GAP SHOULD BE 0.5 MM TO 1 MM). RENEW FRICTION DISC IF LINES ARE WORN OUT. EXAMINE FERRODO BRAKE LINING AND RENEW IF WORN OUT. 1 NO
18 18 SPECIAL ATTENTION TOWARDS THE FOLLOWING DEFECTS IS REQUIRED AND THE SAME ARE TO BE RECTIFIED TO THE SATISACTION OF NAVY TRIALS TEAM / HSL / SS. (I) SLIPPAGE OF BRAKE (II) NOICE IN DRIVE (III) LEAKAGE OF OIL FROM GEARBOX (IV)OVER HEATING OF GEAR BOX/BEARING (V) GEARBOX VIBRATION (VI) INSPECT THE GEAR BOX BACKLASH FOR ANY EVIDENCE OF EXCESSIVE WEAR OF DEFECT. RECTIFY. AFTER O/H WORKS, EQUIPMENT TO BE CARRIEDOUT WITH LOAD TRIALS AS PER NAVAL STANDARDS AND PROOVE OPERATIONAL ON ALL RESPECTS TO NAVAL TRIAL AGENCY. 1 LS
19 19 Contractor has to quote lumpsum cost for mandatory spares mentioned at S.No 3 of Annexure - A in Mandatory Spares List, for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. Mandatory List of Spares is attached. Contractor has also to quote all line items mentioned in Mandatory Spares List (S.No.3) seperately. The price quoted in BOQ wrt under this serial should match to the total price furnished by the bidder as per the detailed price breakup in Annexure A. In case of any discrepancy, the amount which is beneficiary to HSL would be considered at the time of placement of order. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (19) against third party/OEM invoice. \n\n 1 LS
20 20 SoW for ACCOMMODATION LADDER GEAR BOX COMPLETE ROUTINES, OEM-KOREA TACOMA MARINE IND LTD.: (Job No: 56 to 56.04)\nThe following Complete Overhauling / repair works are to be carried out on Accomdation Ladder and its Gearboxes with their auxiliary systems and equipments. And alignement to be carried out with motors, equipment to the satisfaction of Ship staff / HSL. The works involves removal, refitment of total equipment, gear box overhauling along with renewal of bearings(SKF with OEM or Authorized dealer with test certificate), bushes, sleeves, oil seals, pulleys, chains, couplings, pinion gear wheels, gypsy, winch drums, gaurds, hull neck bearings/bushes, oil gauge glasses, oil breathers if required all end covers to be replaced, Drums dismantling, renewal of all drum bushes and zipsy bushes, if found any wear to be built up and machining to be carried out on the equipment (like drums, gear boxs.), Break bands & liners to be renewed. Note: Gearbox oil draining, grease nipples renewal, greasing of gear box, oil breathers & oil level indicators renewal covered in contracors scope. Post completion of repairs, System to be proved to the satisfaction of ship staff / Naval trial agency / HSL. Defects / observations brought out during trials by Naval trial agency to be liquidated and trials/inspection to be reoffered.
21 21 REMOVE THE ACCOMMODATION LADDER AND TAKE IT TO JETTY/SHOP FLOOR. UNDERTAKE CHIPPING/CLEANIG/ MECHANICAL TOOLING TO UNDERTAKE SURVEY OF STRUCTURE. OVERHAULING OF ACCOMMODATION LADDER (P&S) TO BE UNDERTAKEN. JOB INVOLVES COMPLETE OVERHAULING OF ALL EQUIPMENTS RELATED WITH ACCOMODATION LADDER (P&S) INCLUDING GEAR BOX, MOTOR, SHAFT AND WINCH. REPLACE DEFECTIVE PARTS. CHANGE GEAR OIL. INSPECT ALL GEAR, SWR AND PULLEYS FOR WEAR AND DEFECT. RENEW ALL BEARINGS (SKF WITH OEM OR AUTHORIZED DEALER WITH TEST CERTIFICATE) AND DEFECTIVE PARTS. ALL SPARES AND ITEMS BE PROCURED BY CONTRACTOR ONLY. 2 SETS
22 22 INSPECT ALL WIRE ROPES, STEPS AND GENERAL STRUCTURE AND ALL GEARING OF THE ACCOMODATION LADDER. RENEW WIRE ROPES AND RECTIFY DEFECTS. CHECK AND RENEWAL OF STEEL WIRE ROPE FOR LOWERING AND HOISTING OF ACCOMMODATION LADDER. SCRAP/ CLEAN RUSTED AREAS TO BARE METAL AND PRESERVE (ENSURE LUB OIL POINT AND MOVABLE PART ARE NOT TO BE PAINTED). FITMENT OF INSTRUCTION TALLIES, OPERATING PROCEDURE PLATES, LOAD TEST TALLIES (MATERIAL:STAINLESS STEEL). 2 SETS
23 23 CARRY OUT LOAD TESTING OF ACCOMODATION LADDERS. AFTER O/H WORKS, EQUIPMENT TO BE CARRIEDOUT WITH LOAD TRIALS AS PER NAVAL STANDARDS AND PROOVE OPERATIONAL ON ALL RESPECTS TO NAVAL TRIAL AGENCY. 2 NOS
24 24 Contractor has to quote lumpsum cost for mandatory spares mentioned at S.No 1 of Annexure - A in Mandatory Spares List, for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. Mandatory List of Spares is attached. Contractor has also to quote all line items mentioned in Mandatory Spares List (S.No.1) seperately. The price quoted in BOQ wrt under this serial should match to the total price furnished by the bidder as per the detailed price breakup in Annexure A. In case of any discrepancy, the amount which is beneficiary to HSL would be considered at the time of placement of order. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (24) against third party/OEM invoice. \n\n 1 LS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail