Department Of Local Bodies has published Construction Work Of B . T Road From Kabristhan Corner To Main Road. Submission Date for this Tender is 03-02-2020. Road Work Tenders in losal Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work : Constt work of B .T Road from kabristhan corner to main road | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses \n | 12.685 | cum | |
2 | 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Granular courses | 73.16 | cum | |
3 | 3 | Carriage of Materials by mechanical transport including loading ,unloading and stacking ::Sand, bazri,ballast, kankar4 Km | 85.845 | cum | |
4 | 4 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 875 | cum | |
5 | 5 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 540 | cum | |
6 | 6 | Providing, laying, spreading and compacting of granular sub-base by providing close graded material (Table 350-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | 468.3 | cum | |
7 | 7 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 350-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 367.5 | cum | |
8 | 8 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 2450 | sqm | |
9 | 9 | Extra for additional bitumen emulsion used in above item for every 1 kg per 10 sqm | 2450 | sqm | |
10 | 10 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 2450 | sqm | |
11 | 11 | Extra for additional bitumen emulsion used in above item for every 1 kg per 10 sqm | 2450 | sqm | |
12 | 12 | Providing and laying 50-75 mm compacted thick design mix (approved by Engineer) Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates as per Table 500- 9, 500-10 with bitumen binder set (including cost of anti-stripping compound wherever required) for base/ binder course including loading of material with F.E. loader, heating and mixing of stone aggregate, filler and bitumen in computerised hot mix plant,transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control as per clause 504.3.5 to the required level and grade, compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa to achieve the desired density (approximately 2.3 tonne/cum) complete as per clause 507 of MoRT&H specification but excluding primer/tack coat, including all material, labour,machinery, lighting, guarding and maintenance of diversion.Grade-II with Bitumen VG-grade 30 @ 4.25 %, lime filler @ 2% (percent by weight of total mix) | 281.75 | tonne | |
13 | 13 | Providing and laying open graded premix carpet 20mm thick (compacted), on prepared surface in a single course as wearing course, composed of specified graded crushed stone aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/ 10sqm (including cost of anti-stripping compound wherever required), including loading of material with F.E. loader, hot mixing of stone aggregate and bitumen in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting smooth wheeled roller 8-10 tonne capacity and finishing to required level to achieve the desired density as per clause 511 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of tack coat/ seal coat.With Bitumen VG-grade 30 | 2450 | sqm | |
14 | 14 | Providing and laying premixed seal coat using hot mix plant andpaver finisher with aggregate of 6.7mm size defined as 100% passing through 11.20mm sieve and retain on 2.36mm sieve with 0.09 cum per 10 sqm premix with bitumen binder @ 4.5% and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting,guarding and maintenance of diversion.With Bitumen VG-grade 30 | 2450 | sqm | |
15 | 15 | Providing and laying marking of center line and stop line etc with hot thermoplastic compound 2.5 mm thick on road/ plain surface, including reflectorising glass beads @ 250 gms per sqm area with special applicator machine, as per IRC:35 including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control involved. The finished surface to be level, uniform and free from streaks and holes as per clause 803 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 130 | sqm | |
16 | 16 | Providing and fixing CAT’s eye made of aluminium alloy size 75x100x22mm having 21 biconvex lenses embedded in circular disk of AS plastic on each side on road surface complete including all material, labour, and diversion. | 800 | each |