| 1 | 1 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | | 9 | M3 |
|---|
| 2 | 2 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete as directed by the department engineer at site. | | 3.6 | M3 |
|---|
| 3 | 3 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Medium rock dense medium rock not requiring blasting including cost of all materials lead lift etc complete as directed by the department engineer at site. | | 3.6 | M3 |
|---|
| 4 | 4 | Removing Hard rock by wedging, chiseling and trimming to proper shap where blasting is prohibited, including the cost of all materials lead lift etc complete as directed by the department engineer at site. | | 1.8 | M3 |
|---|
| 5 | 5 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | | 43.3 | M3 |
|---|
| 6 | 6 | Providing and laying P.C.C 1:2:4 using 20mm HBG stone for Road with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 2.25 | M3 |
|---|
| 7 | 7 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Raft with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 2.25 | M3 |
|---|
| 8 | 8 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Road with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 41.83 | M3 |
|---|
| 9 | 9 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Column below GL with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 0.16 | M3 |
|---|
| 10 | 10 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Coloumn above GL with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 0.48 | M3 |
|---|
| 11 | 11 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Grade beam with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 0.24 | M3 |
|---|
| 12 | 12 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Plinth beam with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 0.24 | M3 |
|---|
| 13 | 13 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Lintel cum Sunshade with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 0.24 | M3 |
|---|
| 14 | 14 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for 125 mm thick RCC roof slab with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | | 3 | M2 |
|---|
| 15 | 15 | Brick work in C M 1:5 using good quality secound class chamber burnt bricks for basement including cost of all materials labour, lead & lift etc., complete.as directed by the department at site. | | 4.07 | M3 |
|---|
| 16 | 16 | Brick work in C M 1:5 using good quality secound class chamber burnt bricks for superstructure including cost of all materials labour, lead & lift etc., complete as directed by the department at site. | | 3.15 | M3 |
|---|
| 17 | 17 | Brick work in C M 1:3 using good quality secound class chamber burnt bricks for superstructure including cost of all materials labour, lead & lift etc., complete.as directed by the department at site. | | 6.95 | M3 |
|---|
| 18 | 18 | Refilling with excavated earth other than sand including cost of labour, lead and lift etc., complete as directed by the department engineer at site. | | 3.38 | M3 |
|---|
| 19 | 19 | Supplying and filling with the foundation and basement with river sand including cost of all materials, transport, leads, lift, labour etc., complete as directed by the department engineer at site. | | 0.34 | M3 |
|---|
| 20 | 20 | Filling with well gravel including cost of all materials, transport, leads, lift, labour etc., complete as directed by the department engineer at site. | | 99.92 | M3 |
|---|
| 21 | 21 | Supplying and filling 20 mm BG metal for inside of dispension trench and around the loose jointed stone ware pipes as per drawing and specificaiton including cost of all materials, labour, lead and lift etc., for septic tank complete. as directed by the department at site. | | 2.7 | M3 |
|---|
| 22 | 22 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | | 2.78 | MT |
|---|
| 23 | 23 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | | 3 | M2 |
|---|
| 24 | 24 | Plastering in CM 1:5 12 mm thick for inside and outside walls including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | | 51.61 | M2 |
|---|
| 25 | 25 | Laying non slippering tiles 0.15x0.15m (Naveen, Johnson, bell make) in CM 1:3 in pointed with same colour cement including cost of all materials, labour, lead and lifts etc., complete as directed by the department at site. | | 8 | M2 |
|---|
| 26 | 26 | Dadooing and laying of non slippering tiles 0.3 x 0.15 (Naveen, Johnson, bell make) in CM 1:3 in bath and FOL and pointed with same colour cement including cost of all materials, labour,lead,lift etc., complete. as directed by the department at site. | | 14.16 | M2 |
|---|
| 27 | 27 | Providing weathering course consisting of one course of pressed tiles of size 20cm x 20cm x2cm using CM 1:3 and pointed with CM1:3 mixed with cude oil 10% by weight of cement over a bed concrete of broken brick jelly 20mm size in pure slacked lime over 80mm thick with slope 1 in 60 for roof as required well beaten with wooden beaten etc., complete as directed by the department at site. | | 3 | M2 |
|---|
| 28 | 28 | White washing two coats using white cement paint inside walls two coats including cost of all materials, labour, leads and lift etc., complete. | | 3 | M2 |
|---|
| 29 | 29 | Painting the walls with emulsion paint two coat over one coat primer including coat of all materials, scoffolding, labour with all lead, lift etc., complete as per specification and as directed and approved by the dept engineer at site | | 34.61 | M2 |
|---|
| 30 | 30 | Supplying and fixing of 110mm dia PVC rain water down fall pipe of approved quality with the bottom clamps shoes, bend coupling etc., including cost of all materials,labour,lead,lift, for fixing in position etc., and jointing of properly and making holes in masonry on concrete and restoring the attended surface to original condition complete as directed by the department at site. | | 9 | RM |
|---|
| 31 | 31 | Providing Oriya type W.C approved make of 640mm x 450mm size with trap connection 'Y' bend etc., complete and connecting the same to the main sewer or taking to a length of 2.45m from outs face of the wall if the main sewer is not within 2.45 m and provided with PVC 100mm dia ventialating shaft 4.20m height including cost of all materials,leads,lift,etc., complete as directed by the department at site. | | 1 | No |
|---|
| 32 | 32 | Supplying and fixing approved make white glazed wash basin of size 500x400mm fixed on cost iron brackets screws with plugs and screws with 1No. 15mm dia CP screws down 75mm nose pillar tap approved make chain plug and waste coupling 32mmCP adopter including 12.5mm CP drop valve with various cleaning under proof joints including filling to gap between edges and wall with white cement and supplying and fixing 610x407x5.5mm thick plain edged mirror of approved make and hard board backing with detachable edged screws and wall plugs and supplying and fixing towel rod 20x600mm along withpair of brackets of approved size complete in all respects. | | 1 | No |
|---|
| 33 | 33 | Construction of inspection chamber at followeing size 0.60X0.60mtr to an average depth of 0.80m with providing cast iron heavy duty manhole cover, with bracket suitable size including cost of all materials labour CI manhole cover as per drawing and specification (Brick work in CM 1:3, Plastering with CM 1:3, with 5% admixture of water proof compound 12mm thick for inner side and on the out side with CVM 1:3,12mm thick plastering to be carriedout to 250mm below ground level complete in all respects. | | 2 | Nos |
|---|
| 34 | 34 | Supplying and fixing of PVC door of required size single leaf with PVC frame and shsuttering of approved quality and colour including cost of all fittings, handle, tower bolt, aldrop, hold fast etc., complete as directed by the department at site. | | 2.4 | M2 |
|---|
| 35 | 35 | Supplying and fabricating and fixing in position of anodized Aluminium natural colour ventilator louvers type with frame of 63.5x38.10mm 0.85Kg/m glass fixing anodilzed alu. Groove clip with screws and fixing 4mm thick frosted glass louvers, model including cost of all materials lead, lift labour for fabricating and fixing in position including drilling holes in RCC / brick work etc., wherever necessary with power driller to the required extend and made to the original condition after fixing etc., complete | | 2.4 | M2 |
|---|
| 36 | 36 | Supply and fixing of single box type 4'40 W flourescent fitting complete with copper choke and condenser with TW round blocks on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting (SD - 88) | | 4 | Nos |
|---|
| 37 | 37 | Supplying and fixing best quality 16Watts CFL bulb with best plastic pattern holder, EI shade including cost of all materials, labour lead, lift etc., complete - ( SD - 80) | | 1 | No |
|---|
| 38 | 38 | Supply and fixing of water tight bulk head fitting with guard suitable for CFL bulb including cost of all materials, labour lead, lift etc., complete - ( SD - 83) | | 1 | No |
|---|
| 39 | 39 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 110mm dia | | 15 | RM |
|---|
| 40 | 40 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 40mm dia | | 150 | RM |
|---|
| 41 | 41 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 32mm dia | | 150 | RM |
|---|
| 42 | 42 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 25mm dia | | 100 | RM |
|---|
| 43 | 43 | Supplying & fixing gunmetal wheel value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 40mm dia | | 2 | Nos. |
|---|
| 44 | 44 | Supplying & fixing gunmetal wheel value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 32mm dia | | 2 | Nos. |
|---|
| 45 | 45 | Supplying and fixing of 12.5mm dia brass charomium plated screw down bib cocks of approved quality including cost of materials,labour charges for fixing lead,lift etc., complete as directed by the department engineer at site. | | 3 | Nos. |
|---|
| 46 | 46 | Labour charges for dismandaling, clearing away and carefully stacking materials useful for re-use for any thickness of wall of brick work for existing battery room including cost of materials, labour charges, transport lead, lift, etc., complete as directed by the department engineer at site. | | 11.04 | M3 |
|---|
| 47 | 47 | Labour charges for dismandaling, clearing away and carefully stacking materials useful for re-use Reinforcement Cement Concrete for existing battery room including cost of materials, labour charges, transport lead, lift, etc., complete as directed by the department engineer at site. | | 1.13 | M3 |
|---|
| 48 | 48 | Engaging JCB excavator for uprooting trees levelling approach road filling low lying areas on hourly basis including cost of all materials labour, lead & lift etc., complete. | | 4 | Hrs |
|---|
| 49 | 49 | GST for bidders within TamilNadu | | | |
|---|
| 50 | 49.01 | SGST | item81 | 1 | percentage |
|---|
| 51 | 49.02 | CGST | item82 | 1 | percentage |
|---|
| 52 | 50 | GST for bidders outside TamilNadu (IGST) | item83 | 1 | percentage |
|---|