}

Tender For Dock Blocks Preparation, Docking, Undocking And Maintenance Of Docking Infrastructure- In Vessels, NAVAL DOCKYARD VISAKHAPATNAM-Andhra Pradesh

Indian Navy-IN has published Tender For Dock Blocks Preparation, Docking, Undocking And Maintenance Of Docking Infrastructure- In Vessels. Submission Date for this Tender is 13-02-2020. Marine Work Tenders in NAVAL DOCKYARD VISAKHAPATNAM Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

23351859
Tender For Dock Blocks Preparation, Docking, Undocking And Maintenance Of Docking Infrastructure- In Vessels
Open Tender
Indian
Andhra Pradesh
NAVAL DOCKYARD VISAKHAPATNAM
13-02-2020

Tender Details

Tender For Dock Blocks Preparation, Docking, Undocking And Maintenance Of Docking Infrastructure- In Vessels -Marking Of Lay Out Of Dock Blocks On Dock Floor / Slipway As Per Docking Plan , Dock Blocks . Placement Of Steel / Concrete Keel / Shape Dock Blocks On Dock Floor / Slipway As Per Docking Plan , Dock Blocks . Laser Leveling Of Dock Blocks , Dock Blocks . Lifting / Loworing / Repositioning Of Steel / Concrete Dock Block And Other Equipment Required For Other Activities , Dock Blocks . Preparation Of Wooden Keel Blocks , Dock Blocks . Preparation Of Wooden Shape Blocks , Dock Blocks . Intermittent Welding And Cutting Of Multiple Dock Blocks In Case Of Multiple Dock Blocks Put Together , Dock Blocks . Centerline Erection / Removal Docking / Undocking Operation , Docking And Undocking . Handling Of Hauling Ropes During Ship Movement With Ship Dimension<100 M , Docking And Undocking . Handling Of Control Ropes Followed By Jigger Tackles And Trifor Rope During Ship Movement With Ship Dimension<100 M , Docking And Undocking . Handling Of Hauling Ropes During Ship Movement With Ship Dimension 100 -200 M , Docking And Undocking . Handling Of Control Ropes Followed By Jigger Tackles And Trifor Rope During Ship Movement With Ship Dimension 100-200 M , Gangway . Placement And Removal Of Access Platform ( ShipS Brow / Gangway / Trestle ) From Jetty To Ship During Docking / Un-Docking Operation , Docking And Undocking . Operation Of Boat For Passing Of Ropes During Docking / Un-Docking Evolutions , Wooden / Rubber Fenders . Manning Of Wooden / Rubber Fenders During Docking / Undocking Operations , Shore Blocks . Placement Of Shoring / Shore Block After Docking And Removal Of The Same Before Undocking , Dock Blocks . Dock Block Dismantling Post Docking Of Vessel For Mandatory Underwater Repairs , Dock Blocks . Removal Of Steel / Concrete Keel / Shape Dock Blocks On Dock Floor / Slipway As Per Docking Plan Post Un-Docking , Dock Blocks . Shifting Of Dock Blocks From Dock Floor To Storage Area And Vice-Versa , Dock Blocks . Visual And Usg Survey ( Considering Minimum 05 Points Per Square Metre ) , Dock Blocks . Steel Renewal ( Mild Steel ) ( Including Degutting And Regutting Of Wooden / Rubber Components ) Post Visual And Usg Survey ( Considering Minimum 05 Points Per Square Metre , Dock Blocks . Build Up Of Pits / Crack On The Structure ( Metal Deposit In The Pit / Crack Post Surface Preparation Followed By Grinding To Requisite Surface Finish ) , Dock Blocks . Grit Blasting To Sa 2 . 5 Std Using Chilled Cast Iron Grit ( Sa 2 . 5 To Swedish Standard Sis Ss05 59-1967 / Iso8501-1:2007 With Chilled Cast Iron Grit Of Size G-17 To G-39 , Dock Blocks . Primer Application ( Per Coat ) Area Blasted Is To Be Primed With Requisite Primer As Per Scheme . Lp Air Supply By Contractor , Dock Blocks . Application Of Anti Corrosive Paint / Air Less Spray As Per Scheme . Lp Air And Paint Measurement Instrument To Be Provided By The Firm . ( For First Coat ) , Dock Blocks . Dye Penetrant Test Of Weld Post Steel Renewal

Key Value

Document Fees
Refer document
EMD
INR 1100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: <DOCK BLOCLKS PREPARATION, DOCKING, UNDOCKING AND MAINTENANCE OF DOCKING INFRASTRUCTURE- IN VESSELS>
Sl. No. Item Description Item Code / Make Quantity Units
1 1.01 Dock blocks. Marking of lay out of dock blocks on dock floor/slipway as per docking plan Item no 1 2758 Nos.
2 1.02 Dock blocks. Placement of steel/concrete keel/shape dock blocks on dock floor/slipway as per docking plan Item no 2 2846 Nos
3 1.03 Dock blocks. Laser leveling of dock blocks Item no 3 2758 Nos
4 1.04 Dock blocks. Lifting/loworing/repositioning of steel/concrete dock block and other equipment required for other activities Item no 4 2846 Nos
5 1.05 Dock blocks. Preparation of wooden keel blocks Item no 5 709 Cu.mtr
6 1.06 Dock blocks. Preparation of wooden shape blocks Item no 6 827 Cu.mtr
7 1.07 Dock blocks. Intermittent welding and cutting of multiple dock blocks in case of multiple dock blocks put together Item no 7 797 Nos
8 1.08 Dock blocks. Centerline erection/removal docking/undocking operation Item no 8 318 Nos
9 1.09 Docking and undocking. Handling of hauling ropes during ship movement with ship dimension<100 m Item no 9 46 Per rope
10 1.1 Docking and undocking. Handling of control ropes followed by jigger tackles and trifor rope during ship movement with ship dimension<100 m Item no 10 184 Per rope
11 1.11 Docking and undocking. Handling of hauling ropes during ship movement with ship dimension 100 -200 m Item no 11 68 Per rope
12 1.12 Docking and undocking. Handling of control ropes followed by jigger tackles and trifor rope during ship movement with ship dimension 100-200 m Item no 12 348 Per rope
13 1.13 Gangway. Placement and removal of access platform( ship"s brow/gangway/trestle) from jetty to ship during docking/un-docking operation Item no 13 58 Nos
14 1.14 Docking and undocking. Operation of boat for passing of ropes during docking/un-docking evolutions Item no 14 102 Nos
15 1.15 Wooden/ Rubber fenders. Manning of wooden/rubber fenders during docking/undocking operations Item no 15 1 Nos
16 1.16 Shore blocks. Placement of shoring/shore block after docking and removal of the same before undocking Item no 16 164 Nos
17 1.17 Dock blocks. Dock block dismantling post docking of vessel for mandatory underwater repairs Item no 17 231 Nos
18 1.18 Dock blocks. Removal of steel/concrete keel/shape dock blocks on dock floor/slipway as per docking plan post un-docking Item no 18 2846 Nos
19 1.19 Dock blocks. Shifting of dock blocks from dock floor to storage area and vice-versa Item no 19 2846 Nos
20 1.2 Dock blocks. Visual and USG survey (Considering minimum 05 points per square metre) Item no 20 5365 Sq mtr
21 1.21 Dock blocks. Steel renewal (mild steel) (including degutting and regutting of wooden/ rubber components) post visual and USG survey (considering minimum 05 points per square metre Item no 21 15000 Per Kg
22 1.22 Dock blocks. Build up of pits/ crack on the structure (Metal deposit in the pit/ crack post surface preparation followed by grinding to requisite surface finish) Item no 22 5365 Per cm
23 1.23 Dock blocks. Grit blasting to SA 2.5 std using chilled cast iron grit (Sa 2.5 to swedish standard SIS SS05 59-1967/ISO8501-1:2007 with chilled cast iron grit of size G-17 to G-39 Item no 23 5365 Per Sq mtr
24 1.24 Dock blocks. Primer application (per coat) area blasted is to be primed with requisite primer as per scheme. LP air supply by contractor Item no 24 5365 Per sq mtr
25 1.25 Dock blocks. Application of anti corrosive paint/ air less spray as per scheme. LP air and paint measurement instrument to be provided by the firm. (For first coat) Item no 25 10730 Per sq mtr
26 1.26 Dock blocks. Dye penetrant test of weld post steel renewal Item no 26 3500 Per cm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail