Directorate Of Industries has published Supply Of Glass Bead Cluster. Submission Date for this Tender is 20-03-2020. SCADA Tenders in KARNADANDI TANDIYA VARANASI Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Item : Cluster VARANASI | |||||
---|---|---|---|---|---|
Sl. | Item Description | Item Code / Make | Packing (GM) | Unit Rate | |
1 | 1 | BATCH HOUSE BATCH HOUSE CAPACITY -SUITABLE FOR 2MT GLASS PRODUCTION, WITH FEEDING & STORAGE Loading systems (mechanical or pneumatic) customised for the specific raw material,for making reliable filling of the silos .,Materials are weighed by fully electronic scales. The scales are specifically dimensioned with regard to the individual components and optimal precision is maintained A homogeneous batch is essential to achieve good melting efficiency. High-performance mixer.Ultra-modern automated equipment (programmable logic controller), weighing and dosing computers as well as a SCADA system for visualising the processes control and monitor batch production. Fully automatic and completely independent of human intervention. SCADA stations control the dialogue between man (the operator) and the machine (the plant). These can be integrated both into the batch plant control room and centrally in the furnace control room with proper conveying methodology\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n\n\n | 1 | 1 | EACH |
2 | 2 | RAW MATERIAL \nSTORAGE CELL\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 2 | 1 | EACH |
3 | 3 | SILO MIXED BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 3 | 1 | EACH |
4 | 4 | MAGNETIC SEPARATOR \n500 KG/H\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 4 | 1 | EACH |
5 | 5 | CULLET PROCESSING \nPLANT\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 5 | 1 | EACH |
6 | 6 | INCLINE CONVEYER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 6 | 1 | EACH |
7 | 7 | VIBRATING SIEVE\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 7 | 1 | EACH |
8 | 8 | WEIGHTING BALANCE \nDIGITAL CAPACITY 2MT\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 8 | 1 | EACH |
9 | 9 | ELECTRONIC BALANCE \nCAPACITY 500 grm\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 9 | 1 | EACH |
10 | 10 | BUCKET ELEVATOR FOR \nCULLET & SAND\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 10 | 1 | EACH |
11 | 11 | BUCKET ELEVATOR FOR \nFEEDING BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 11 | 1 | EACH |
12 | 12 | CONVEYER FOR \nFEEDING BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 12 | 1 | EACH |
13 | 13 | CONVEYER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 13 | 1 | EACH |
14 | 14 | HOPPER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 14 | 1 | EACH |
15 | 16 | BATCH CHARGES\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n | 15 | 1 | EACH |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail