Rural Development Government Departments Closing in 0 days TDR #23258529

Construction Of Slab Drain At Ch 3/900 On Nimbhi Pimpalkhuta Road Vr-36 Tq . Morshi ( 3 . 00 M Slab Drain )

Issued by Government Departments · MORSHI, Maharashtra
Tender Value
8.76 Lakhs
Estimated cost
Bid Submission
28 Jan 2020
0 days left
EMD
9000
Bank guarantee accepted
Document Fee
560
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
MORSHI → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Slab Drain At Ch 3/900 On Nimbhi Pimpalkhuta Road Vr-36 Tq . Morshi ( 3 . 00 M Slab Drain )

BOQ

Name of Work: O/W Construction of Slab Drain at Ch 3/900 on Nimbhi Pimpalkhuta Road VR-36 Tq.Morshi (3.00 m Slab Drain)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.\n(SSR 19-20 Item No.12.02) BR.3 Page No. 102\na) Upto 1.50m lift Normal RateBI01010001010000000000000515BI010000111338.77Cum
22Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.\n(SSR 19-20 Item No.12.06) BR.3 Page No. 102\nb) 1.50m to 3.00m lift, Add 10%BI01010001010000000000000515BI010000111418.29Cum
33Providing rubble filling of trap/ granite/ quartzite gneiss stones for foundations including hand packing filling gravel / sand in the voids etc. complete.\n(SSR 19-20 Item No.11.01) CD.1 Page.No. 159BI01010001010000000000000515BI010000111511.98Cum
44Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand)\n(SSR 19-20 Item No.12.25) BR.5 Page No. 105 and B.7, Page No. 38BI01010001010000000000000515BI010000111611.507Cum
55Providing and laying in situ / ready mix M-15 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of \"V\" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means of pump) and including bailling out water and curing finishing in CM 1:3 etc. complete. as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners \na) Height upto 5 M. (With Concrete Mixer)With Natural / VSI standard Artificial Sand \n( A) Depth to 10 m percent extra for rate\n( B ) Depth upto 15 m Add 40 percent extra for rate\n( C ) Depth upto 20 m Add 60 percent extra for rate\n( D ) Depth upto 20 m Add 100 percent extra for rate\ni) M-15\n(SSR 19-20 Item No.17.38) MORT&H (5th Rev.) 1700, 2204BI01010001010000000000000515BI010000111738.513Cum
66Providing and laying in situ / ready mix M-25 controlled cement concrete of trap/ granite/ quartzite/ gneiss metal for RCC work in solid/ deck slab etc. including ramming, vibrating, curing, formwork, centering and finishing in cement plaster excluding reinforcement etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer and fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )\ni) Height up to 5 m, normal rate. \nii) Height 5 to 7.50 m, add 5 percent extra over basic rate.\niii) Height 7.50 to 10 m, 7.50 percent extra.\niv) Over 10 m Height, add 10 percent extra for every 2.50m rise.\n(SSR 19-20 Item No.14.15) BR.38(b and c) Page No. 135 and B. 7, Page No.38BI01010001010000000000000515BI01000011188.937Cum
77Providing and laying PCC in M15 grade levelling course of 100 mm thick below pile cap with fully automatic micro processor PLC with SCADA enabled reversible drum type mixer/ concrete batch mix plant (pan mixer) etc. complete.BI01010001010000000000000515BI01000011191.47Cum
88Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete.\n(SSR 19-20 Item No.14.01) BR.35 Page No. 134BI01010001010000000000000515BI01000011200.715MT
99Back filling behind abutment, wing wall and return wall as per drawings and technical specifications etc. complete. (by granular material)\n(SSR 19-20 Item No.12.70) MORT and H 2200 &-710.1.4 of iRC 78BI01010001010000000000000515BI010000112129.812Cum
1010Providing and laying of filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition as per drawing and technical specifications etc. complete.\n(SSR 19-20 Item No.12.72) MORT and H 2200 &-710.1.4 of iRC 78BI01010001010000000000000515BI010000112211.52Cum
1111Providing tar paper bearing including laying in proper position etc. complete.\n(SSR 19-20 Item No.13.02) \nAs directed by Engineer in chargeBI01010001010000000000000515BI010000112321.75Sqm
1212Providing expansion joints with 25mm thick bituminous pad as per detailed drawings etc. complete.\n(SSR 19-20 Item No.14.33) BR.43 Page No. 138BI01010001010000000000000515BI01000011252.88Sqm
1313Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawings and Technical specifications etc. complete. (boulder laid without wire crates)BI01010001010000000000000515BI01000011267.196Sqm
1414Providing and laying 0.90 meter thick metal mat consisting of rubble, oversize metal and normal size metal in specified thickness as per detailed drawing including supplying all materials, hand packing of rubble, spreading metal in layers and hard murum including watering and compaction with power roller etc. complete.\n(SSR 19-20 Item No.14.88) As directed by Engineer in chargeBI01010001010000000000000515BI010000112720.4Sqm
1515Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete.\n(SSR 19-20 Item No.17.37) MORT&H (5th Rev.) 2705, 2706BI01010001010000000000000515BI010000112814.8Rmt
1616Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge \n(SSR 19-20 Item No.6.36) MORTH 801BI01010001010000000000000515BI01000011291No
1717Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)\na) 80 mm Metal, By breaking Boulders (Hand broken)\n(SSR 19-20 Item No.50.56) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113016.32Cum
1818Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)\nb) 40 mm Metal, By breaking Boulders (Hand broken) \n(SSR 19-20 Item No.50.57) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113132Cum
1919Supplying hard murum/ kankar at the road site, including conveying and stacking complete.\n(SSR 19-20 Item No.2.29a)BI01010001010000000000000515BI010000113286.122Cum
2020Supplying soft murum at the road site, including conveying and stacking complete.\n(SSR 19-20 Item No.2.29b)BI01010001010000000000000515BI01000011339.6Cum
2121Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .\n(SSR 19-20 Item No.50.58) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113448.32Cum
2222Spreading hard murum/ soft murrum/ gravel or kankar for side width complete\n(SSR 19-20 Item No.2.30)BI01010001010000000000000515BI010000113595.722Cum
2323Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.\nRate as Per S.E. Corrigendum 3604 Dt. 17-07-19 It No.12BI01010001010000000000000515BI0100001136399.6Sqm
2424Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.\n(SSR 19-20 Item No.50.59) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113781.6Sqm
2525Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.\n(SSR 19-20 Item No.50.61) As directed by Engineer-in-chargeBI01010001010000000000000515BI0100001138320Sqm
2626Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of bitumen 0f specified grade at the rate of 0.30 Kg Sqm.(on existing bitumen surface.)\n(SSR 19-20 Item No.3.38a) IRC-SP-20, 2002 Clause No. 8.7.3BI01010001010000000000000515BI0100001139320Sqm
2727Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM\nSurface) (VG-30 bulk bitumen rates are considered to arrive at rates)\n(SSR 19-20 Item No.4.12) MORTH 511BI01010001010000000000000515BI0100001140320Sqm
28289 MM SEAL COAT: Providing and laying of Type A 9mm premix seal coat with HMP of apropriate capacity crushed stone chiping 6.7 mm size and penetration bitumen of specified grade @ 1.2kg/Sq.m, preparing existing road surface by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete.(VG-30 bulk bitumen rates are considered to arrive at rates)\n(SSR 19-20 Item No.4.13) MORTH 513BI01010001010000000000000515BI0100001141320Sqm
2929Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.\n(SSR 19-20 Item No.2.11) MORTH 301BI01010001010000000000000515BI010000114263.72Cum
3030Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.\n(SSR 19-20 Item No.2.25) MORTH 404BI01010001010000000000000515BI010000114347.7Cum
3131Royalty ChargesBI01010001010000000000000515BI0100001144228.27Cum
3232Aggregate\nWater AbsorptionBI01010001010000000000000515BI01000011453No
3333Impact ValueBI01010001010000000000000515BI01000011463No
3434Gradation (Sieve Analysis)BI01010001010000000000000515BI01000011473No
3535Flakiness Index & Elongation IndexBI01010001010000000000000515BI01000011483No
3636Murum\nLiquid limit & plastic limitBI01010001010000000000000515BI01000011492No
3737Extraction Test (For OGC) and Binder Content\nCarpet and Seal CoatBI01010001010000000000000515BI01000011502No
3838Bitumen\nPenitrationBI01010001010000000000000515BI01000011511No
3939DuctilityBI01010001010000000000000515BI01000011521No
4040Softening PointBI01010001010000000000000515BI01000011531No
4141ViscosityBI01010001010000000000000515BI01000011541No

AI Tender Summary

OUR REF NO 23258529
AUTHORITY Government Departments
TENDER VALUE 8.76 Lakhs
LAST DATE 28-01-2020
Authority
Authority Name Rural Development Department
Work Description Construction Of Slab Drain At Ch 3/900 On Nimbhi Pimpalkhuta Road Vr-36 Tq . Morshi ( 3 . 00 M Slab Drain )
Basic Detail
Tender No NO/EE/ZP /AMT/E-TENDER/NIT13/ 2019_20
Bidding Type Tender
Location
City MORSHI
State Maharashtra
Key Dates
Publish Date 14 Jan 2020
Submission Date 28 Jan 2020
Open Date 29 Jan 2020
Finance
Tender Value 8.76 Lakhs
Tender Fee 560
EMD 9000
Exemption Not Available
Document List
B67DECAF-AAB2-481C-BA3D-0726748DBC4D.html
Tendernotice_1.pdf
SBD38.pdf
BOQ_934671.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 14, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 28, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 29, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

B67DECAF-AAB2-481C-BA3D-0726748DBC4D.html

pdf

Tendernotice_1.pdf

pdf

SBD38.pdf

xls

BOQ_934671.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders