| 1 | 1 | Jungle clearance of scrub jungles and clearing the rubbish away from site. | item1 | 600 | m2 |
|---|
| 2 | 2 | Earth work excavation in hard gravelly soil with an initial lead of 10 m and lift of 2 m etc.for foundation. | item2 | 40 | m3 |
|---|
| 3 | 3 | Removing of existing oil spreaded soil away from the site and dumping at munipality designated location. | item3 | 105 | m3 |
|---|
| 4 | 4 | Supply and filling the basement with Msand for foundation and complete basement including watering consolidation etc. | item4 | 2 | m3 |
|---|
| 5 | 5 | PCC 1:4:8 using 40m HB stone for foundation including cost of al materials and labour etc., complete. | item5 | 6 | m3 |
|---|
| 6 | 6 | RCC 1:1.5:3 using 12- 20mm HB stone with form work for Footing including cost of all materials lead and lift etc., complete. | item6 | 5 | m3 |
|---|
| 7 | 7 | RCC 1:1.5:3 using 20mm HB stone with form work to RCC column portions Including cost of all materials lead and lift etc., complete. | item7 | 4 | m3 |
|---|
| 8 | 8 | RCC 1:1.5:3 using 20mm HB stone with form work for grade beam Including cost of cement all materials lead and lifts etc., complete. | item8 | 4 | m3 |
|---|
| 9 | 9 | Providing steel reinforcements for RCC works inducing cost of steel, binding wire and labour for cutting bendng tying and placing in position etc., complete. | item9 | 1545 | Kg |
|---|
| 10 | 10 | Refilling with gravel including cost of all materials and labour etc. complete. | item10 | 121 | m3 |
|---|
| 11 | 11 | Brick Work in Cement mortar 1:5 using Chamber Burnt Bricks of size 9\" x 4.5\" x 3\" including cost of all materials, labour, lead, lift, etc., complete. | item11 | 27 | m3 |
|---|
| 12 | 12 | Plastering the walls with CM 1:5, 12mm thick including cost of al materials, labour, lead, lift, etc., complete. | item12 | 261 | m2 |
|---|
| 13 | 13 | Distempering two coats with approved quality distember Including cost of all materials,lead,lift etc complete. | item13 | 338 | m2 |
|---|
| 14 | 14 | Supplying and fixing of Mild Steel Angles 45x45x5 mm including cost of all materials, labour charges etc., complete. | item14 | 163 | Kgs |
|---|
| 15 | 15 | Supplying and fixing of weld mesh 10 x 10 cm 10 gauge including cost of all materials, labour charges etc., complete. | item15 | 119 | m2 |
|---|
| 16 | 16 | Fabrication, supply and fixing of MS steel gate using required angles, flats and square bars including cost of all necessary fittings,painting with two coats of enamel paint, cost of all materials, labour, lead, lift etc., complete as instructed by the Engineer. | item16 | 200 | kg |
|---|