| 1 | 1 | Dragging timber using hired elephant/tractor in difficult and rugged areas for an initial lead of 200m(20cu.m teak and 25.428cu.m other hardwood) | BI01010001010000000000000515BI0100001113 | 45.43 | M3 |
|---|
| 2 | 2 | Dragging timber using hired elephant/tractor in difficult and rugged areas for every additional 10m(1/3 of above quantity) | BI01010001010000000000000515BI0100001114 | 15.14 | M3 |
|---|
| 3 | 3 | Haulage of Ist A,B& C class teak poles by using manual labour | | 150 | E |
|---|
| 4 | 4 | Haulage of IInd A,B& Class teak poles by using manual labour | | 350 | E |
|---|
| 5 | 5 | Haulage IIIrd class teak poles using manual labour | | 700 | E |
|---|
| 6 | 6 | Haulage IVth class teak poles using manual labour | | 500 | E |
|---|
| 7 | 7 | Haulage Vth class teak poles by manual labour | | 70 | E |
|---|
| 8 | 8 | Clearing jungle growth without felling trees at the dumping depot for stacking depot within the plantation | | 1 | Ha |
|---|
| 9 | 9 | Ciearing fireline and fire tracing along the boundary of the dumping depot to a width of 5.2m | | 0.5 | Km |
|---|
| 10 | 10 | Loading timber and poles in lories for transporting to the dumping& Govt. timber depot (272.07M3 teak+19M3 hardwood) | | 291.07 | M3 |
|---|
| 11 | 11 | Transport of all firewood by headload up to 200M | | 7 | Mt |
|---|
| 12 | 12 | Loading all firewood in lorries | | 7 | Mt |
|---|
| 13 | 13 | Transporting timber (this include teak & Hardwood timber) to Veettoor Depot over a distance of 42Km including 1Km coupe road | | 45.43 | M3 |
|---|
| 14 | 14 | Transport of teak poles in lorries through coupe road to the dumping depot | | 245.64 | M3 |
|---|
| 15 | 15 | Transport of all firewood in lorries to stacking site inside the plantation through coupe road | | 7 | Mt |
|---|
| 16 | 16 | Unloading all timber and all poles at dumping depot & Veettoor timber depot | | 291.07 | M3 |
|---|
| 17 | 17 | Unloading all firewood and stacking at stacking site inside the plantation | | 7 | Mt |
|---|
| 18 | 18 | Stacking teak poles at dumping depot | | 245.64 | M3 |
|---|
| 19 | 19 | Drystone pitching 22.5cm thick laid in courses and required profile with hammer dressed stones having no side less than 15cm , with minimum depth of 20cm including preparing the bedding surface etc. all compete(payment for stone to be made separately) | | 30 | M3 |
|---|
| 20 | 20 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth up to 50m and lift up to 1.5m , as directed by Engineer in charge: all kinds of soil | | 50 | M3 |
|---|
| 21 | 21 | Contractor profit on items except DSR items | | 1 | LS |
|---|
| 22 | 22 | Stationary expenses and other unforeseen expenses and rounding | | 1 | LS |
|---|
| 23 | 23 | Provision for VDA | | 1 | LS |
|---|