Wbiw/Ee/Udd/E-Nit-03/2019-20/ Sl-1 Construction Of New Wooden Bridge In-Place Of Damaged Tubular Truss Bridge Near Babanpur Lock-Gate At Ch . 1740 . 00 M Over Babanpur Khal Under Block - Barrackpur - I , P . S . - Titagarh In The District Of North 2, BABANPUR KHAL UNDER BLOCK - BARRACKPUR - I, P. S-West Bengal

Irrigation and Waterways Department has published Wbiw/Ee/Udd/E-Nit-03/2019-20/ Sl-1 Construction Of New Wooden Bridge In-Place Of Damaged Tubular Truss Bridge Near Babanpur Lock-Gate At Ch . 1740 . 00 M Over Babanpur Khal Under Block - Barrackpur - I , P . S . - Titagarh In The District Of North 2. Submission Date for this Tender is 27-01-2020. Foot Over Bridge Tenders in BABANPUR KHAL UNDER BLOCK - BARRACKPUR - I, P. S West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

23239113
Wbiw/Ee/Udd/E-Nit-03/2019-20/ Sl-1 Construction Of New Wooden Bridge In-Place Of Damaged Tubular Truss Bridge Near Babanpur Lock-Gate At Ch . 1740 . 00 M Over Babanpur Khal Under Block - Barrackpur - I , P . S . - Titagarh In The District Of North 2
Open Tender
Indian
West Bengal
BABANPUR KHAL UNDER BLOCK - BARRACKPUR - I, P. S
27-01-2020

Tender Details

Wbiw/Ee/Udd/E-Nit-03/2019-20/ Sl-1 Construction Of New Wooden Bridge In-Place Of Damaged Tubular Truss Bridge Near Babanpur Lock-Gate At Ch . 1740 . 00 M Over Babanpur Khal Under Block - Barrackpur - I , P . S . - Titagarh In The District Of North 24 Parganas Under Urban Drainage Division

Key Value

Document Fees
Refer document
EMD
INR 14774.0 /-
Tender Value
INR 7.38 Lakhs /-

BOQ Items

Name of Work: " CONSTRUCTION OF NEW WOODEN BRIDGE IN-PLACE OF DAMAGED TUBULAR TRUSS BRIDGE NEAR BABANPUR LOCK-GATE AT CH. 1740.00 M OVER BABANPUR KHAL UNDER BLOCK - BARRACKPUR - I, P. S. - TITAGARH IN THE DISTRICT OF NORTH 24 PARGANAS UNDER URBAN DRAINAGE DIVISION".
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specifications Clause 202 for Rural Roads of MORD.\n(a) Including dismembering 2.424 MT
2 2 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications\nClause 202 for Rural Roads of MORD.\n(I) By Manual Means\nc) Reinforced Cement Concrete 2.61 Cum
3 3 Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
4 3.01 (iii) 15 cm av. Diameter 70 Mtr.
5 3.02 (v) 20 cm av. Diameter 156 Mtr.
6 4 Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
7 4.01 (iii) 15 cm av. Diameter 49 Mtr.
8 4.02 (v) 20 cm av. Diameter 94.5 Mtr.
9 5 Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (b) Width of thinner end above 15 cm.\n(i) Jhaw / Eucalyptus. 224 Mtr.
10 6 Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)
11 6.01 (a) Sal wood 2.52 Cum
12 6.02 (b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-charge) 4.209 Cum
13 7 Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer-in-charge. 310 Kg
14 8 Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge b) Two Coats 391.426 Sqm
15 9 Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). 300 Mtr
16 10 Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) 20 Mtr
17 11 Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary. 200 Mtr
18 12 Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). 357 Each
19 13 Labour charges for filling empty cement gunny bag / polythene bag(capacity 50 kg) with all kinds of earth (wet or dry), sand or\nagreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).\nNB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. 357 Each
20 14 Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts. 357 Each
21 15 Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,\nNB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.\nE) Beyond 4.00 km and upto 5.00 km 71.96 Cum
22 16 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. 32.61 Sqm
23 17 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :\nWith other than hi-gloss of approved quality-\n(iv) Two coats (with any shade except white) 32.61 Sqm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail