| 1 | 1 | Supply delivery laying and testing of 11KV 3 cores x 185 sq mm XLPE Cable complete as per the site requirements. | BI01010001010000000000000515BI0100001113 | 280 | Mtr |
|---|
| 2 | 2 | Supply delivery fixing and testing of heat shrinkable jointing Kit for 3C x 185 sq mm XLPE Cable(Outdoor type) | BI01010001010000000000000515BI0100001114 | 6 | No |
|---|
| 3 | 3 | Supply delivery fixing and testing of heat shrinkable jointing Kit for 3C x 185 sq mm XLPE Cable(Outdoor type) | BI01010001010000000000000515BI0100001115 | 2 | No |
|---|
| 4 | 4 | Laying of 3 cores x 185 sq mm XLPE Cable in the Cable Trench with removable Cover complete | BI01010001010000000000000515BI0100001116 | 120 | Rmt |
|---|
| 5 | 5 | Supply delivery laying and testing of 10 cores x 2.5 sq mm copper control un-armoured Cable | BI01010001010000000000000515BI0100001117 | 10 | Mtr |
|---|
| 6 | 6 | Supply delivery fixing and testing of 16 mm M.S Bolt & Nuts with washer as per the site requirements | BI01010001010000000000000515BI0100001118 | 10 | Kg |
|---|
| 7 | 7 | Supply, delivery fixing and testing of aluminium cable sockets of different sizes as per the site requirements. | BI01010001010000000000000515BI0100001119 | 20 | No |
|---|
| 8 | 8 | Supply delivery fixing and testing of 40 mm diaG.I Pipe earthing device of 03 mtr long complete as per the site requirements. | BI01010001010000000000000515BI0100001120 | 4 | No |
|---|
| 9 | 9 | Supply delivery fixing and testing of earthing materials complete as per the site requirements. | BI01010001010000000000000515BI0100001121 | 4 | No |
|---|
| 10 | 10 | Supply delivery & fixing of 150 mm dia G.I Pipe complete as per the site requirements. | BI01010001010000000000000515BI0100001122 | 30 | Mtr |
|---|
| 11 | 11 | Supply delivery fixing and testing of 25 x 5 mm G.I flat complete as per the site requirements. | BI01010001010000000000000515BI0100001123 | 60 | Kg |
|---|
| 12 | 12 | Supply delivery fixing and testing of Lightning Arrestor 11 KV 12 KV, 10 ka complete as per the site requirements. | BI01010001010000000000000515BI0100001124 | 3 | No |
|---|
| 13 | 13 | Cost of Cubicle room of size 12’0” x 12’ 0” x 10’ 0” | BI01010001010000000000000515BI0100001125 | 1 | LS |
|---|
| 14 | 14 | Sundries as per the site requirements. | BI01010001010000000000000515BI0100001126 | 1 | LS |
|---|
| 15 | 15 | Supply delivery installation and testing of 09 mtr long, 300 kg PSC Pole complete as per the site requirements. | BI01010001010000000000000515BI0100001127 | 2 | No |
|---|
| 16 | 16 | Supply delivery fixing & testing of 100 x 50 x 6 mm M.S Chanel each 2.8 mtr long (9.2kg per mtr x 02 no as Pressure Channel completes as per the site requirements. | BI01010001010000000000000515BI0100001128 | 60 | Kg |
|---|
| 17 | 17 | Supply delivery fixing & testing of 75 x 40 x 6 mm M.S Chanel each 2.8 mtr long(9.2 kg per mtr x 02 no for mounting of A.B switch & H.G fuse complete as per the site requirements. | BI01010001010000000000000515BI0100001129 | 40 | Kg |
|---|
| 18 | 18 | Supply delivery fixing & testing of 50 x 50 x 6 mm M.S Angle for mounting of L.T Distribution box of size2.8 mtr long x 02 nos completes as per the site requirements. | BI01010001010000000000000515BI0100001130 | 30 | Kg |
|---|
| 19 | 19 | Supply delivery fixing and testing of 18 mm G.I H.T Stay set complete as per the site requirements | BI01010001010000000000000515BI0100001131 | 2 | No |
|---|
| 20 | 20 | Supply delivery fixing and testing of 7/10 (SWG) G.I Stay Wire complete as per the site requirements | BI01010001010000000000000515BI0100001132 | 20 | Kg |
|---|
| 21 | 21 | Supply delivery fixing and testing of 11 KV Stay Insulator complete as per the site requirements | BI01010001010000000000000515BI0100001133 | 2 | No |
|---|
| 22 | 22 | Supply delivery fixing and testing of H.T Stay Clamp complete as per the site requirements | BI01010001010000000000000515BI0100001134 | 2 | Pair |
|---|
| 23 | 23 | Supply delivery fixing and testing of Coil type earthing device of 03 mtr long complete. | BI01010001010000000000000515BI0100001135 | 2 | No |
|---|
| 24 | 24 | Supply delivery and fixing of Ant climbing device made out of G.I barbed wire complete as per the site requirements. | BI01010001010000000000000515BI0100001136 | 4 | Kg |
|---|
| 25 | 25 | Supply delivery and fixing of G.I Bolt & Nut with washer complete as per the site requirements. | BI01010001010000000000000515BI0100001137 | 15 | Kg |
|---|
| 26 | 26 | Concreting of Pole | BI01010001010000000000000515BI0100001138 | 2 | No |
|---|
| 27 | 27 | Materials cost for Concreting of stay set.\n(1.65mtr x 3mtr x 3mtr=0.1485 CUM- PCC- 1:2:4) | BI01010001010000000000000515BI0100001139 | 2 | No |
|---|
| 28 | 28 | Sundries as per the site requirements. | BI01010001010000000000000515BI0100001140 | 1 | L.S |
|---|
| 29 | 29 | Dismantling of existing 11 KV 3 cores x 50 sq mm XLPE Cable. | BI01010001010000000000000515BI0100001141 | 40 | Mtr |
|---|
| 30 | 30 | N.B: The bidders are required to Quote their rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. | BI01010001010000000000000515BI0100001142 | | |
|---|