| 1 | 1 | “Hiring of HEMM for excavating all kinds of strata /overburden/in situ, loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the Management /Engineer–in-Charge at Kusmunda Expansion OCP for total quantity of 78,14,985.00 Cum( Soft soil +Hard Strata),Total Quantity: 78,14,985.00 Cum ( Top Soil :- 365931.00 Cum + Hard Strata – 74,49,054.00 Cum), for a period of 7 months (210 days) @ 37213.00 Cum per day.\" | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | A. Soft soil (Not requiring Drilling) above Hard strata, Total Quantity - 3,65,931.00Cum. | | | |
|---|
| 3 | 1.02 | (A1) Lead Slab:- 2-3KM, Total Quantity :- 144879.00 Cum,Route No 1 Dump No1\n | BI01010001010000000000000515BI0100001114 | 144879 | Cum |
|---|
| 4 | 1.03 | (A2) Lead Slab:-3-4 KM, Total Quantity: - 221052.00 Cum, Route No 1 Dump No1\n | BI01010001010000000000000515BI0100001118 | 221052 | Cum |
|---|
| 5 | 2 | B. Hard Strata (Requiring Drilling in all kind of strata / OB) above LK Top Seam for a quantity of with Drilling, Total Quantity-74,49,054.00Cum | | | |
|---|
| 6 | 2.01 | (B1) Lead Slab:2-3KM, Total Quantity: 2,48,302.00 Cum Dump No-2 Route No2\n \n | BI01010001010000000000000515BI0100001126 | 248302 | Cum |
|---|
| 7 | 2.02 | (B2) Lead Slab: 3-4 KM,Total Quantity:-41,60,733.00 Cum Dump No2 , Route No 2\n | BI01010001010000000000000515BI0100001128 | 4.16073e+06 | Cum |
|---|
| 8 | 2.03 | (B3) Lead Slab: 4-5 KM, Total Quantity :- 30,40,019.00 CumDump No2 , Route No 2\n\n\n | BI01010001010000000000000515BI0100001125 | 3.04002e+06 | Cum |
|---|
| 9 | 3 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |
|---|