| 1 | 1 | WORK SHED | | | |
|---|
| 2 | 1.01 | Solid cement block masonry for super structure using solid cement blocks of available size in cm 1:8 | | 16 | m3 |
|---|
| 3 | 1.02 | Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone | | 75 | m2 |
|---|
| 4 | 1.03 | Floor finishing with cement grout on existing cement cencrete flooring after plastering with cm 1:3 9mm thick one coat | | 81.45 | m2 |
|---|
| 5 | 1.04 | Plastering with cement mortar 1:5, 12mm thck floated hard and towelled smooth one coat | | 145 | m2 |
|---|
| 6 | 1.05 | Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings. | | 17.04 | m2 |
|---|
| 7 | 1.06 | Roofing galvanised iron corrugated sheets .8\nmm thick or nearest available size with\noverlaps of 150mm at ends and G.I.hooks or\ncrank bolt and nuts including plane washers\nand bitumen washers etc. complete | | 125 | m2 |
|---|
| 8 | 1.07 | Steel work in tubular | | 1250 | kg |
|---|
| 9 | 1.08 | Electrification | | 1 | no |
|---|
| 10 | 1.09 | Painting | | 1 | no |
|---|
| 11 | 2 | Office Maintenance | | | |
|---|
| 12 | 2.01 | Roof plastering with cement mortar 1:3 9mm thick floated hard and trowelled smooth one coat | | 89.3 | m2 |
|---|
| 13 | 2.02 | Roofing galvanised iron corrugated sheets .8\nmm thick or nearest available size with\noverlaps of 150mm at ends and G.I.hooks or\ncrank bolt and nuts including plane washers\nand bitumen washers etc. complete | | 112.36 | m2 |
|---|
| 14 | 2.03 | Steel work in built up sections trusses and\nframed work with M.S. angles, Plates Tees\netc. straightening cutting fabricating and\nhoisting including applying a coat of iron\nprimer | | 1120 | kg |
|---|
| 15 | 2.04 | Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone | | 49.4 | m2 |
|---|
| 16 | 2.05 | Providing three window with shutter | | 3 | nos |
|---|
| 17 | 2.06 | Doors and shutters | | 2 | nos |
|---|
| 18 | 3 | Existing workshed griil work, painting | | | |
|---|
| 19 | 3.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete | | 6.34 | m3 |
|---|
| 20 | 3.02 | Dry stone masonry for foundation and basement | | 9.9 | m3 |
|---|
| 21 | 3.03 | Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone | | 44.84 | m2 |
|---|
| 22 | 3.04 | Roofing galvanised iron corrugated sheets .8\nmm thick or nearest available size with\noverlaps of 150mm at ends and G.I.hooks or\ncrank bolt and nuts including plane washers\nand bitumen washers etc. complete | | 175 | m2 |
|---|
| 23 | 3.05 | Steel work in built up sections trusses and\nframed work with M.S. angles, Plates Tees\netc. straightening cutting fabricating and\nhoisting including applying a coat of iron\nprimer | | 3070 | kg |
|---|
| 24 | 3.06 | Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings. | | 16 | m2 |
|---|
| 25 | 3.07 | Fan light | | 1 | no |
|---|
| 26 | 3.08 | Door frame | | 1 | no |
|---|
| 27 | 3.09 | Pump 1.5 hp | | 1 | no |
|---|
| 28 | 4 | WORK SHED AND REST ROOM | | | |
|---|
| 29 | 4.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete | | 18.24 | m3 |
|---|
| 30 | 4.02 | Random rubble in cement mortar 1:8 for foundation and basement | | 27.38 | m3 |
|---|
| 31 | 4.03 | Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete | | 23.22 | m3 |
|---|
| 32 | 4.04 | RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete | | 1.89 | m3 |
|---|
| 33 | 4.05 | Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level | | 200 | kg |
|---|
| 34 | 4.06 | Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings. | | 9 | nos |
|---|
| 35 | 4.07 | Plastering with cement CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete | | 260.67 | m2 |
|---|
| 36 | 4.08 | Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete | | 9.79 | m3 |
|---|
| 37 | 4.09 | Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete | | 97.92 | m2 |
|---|
| 38 | 4.1 | Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete | | 260.67 | m2 |
|---|
| 39 | 5 | TRESS WORK | | | |
|---|
| 40 | 5.01 | Steel work built up tubular trusses etc including cutting, hoisting, fixing position and applying a priming coat of steel primer, including welding and bolted with special shaped washers etc complete hot finished seamless type tube | | 696 | kg |
|---|
| 41 | 5.02 | Roofing with GI hard colour power coated traffod sheets .35mm thick or nearest available thickness with overlap 150mm at ends and GI hook or cranck CI bolts and nuts including plain washers and bitumen washers etc complete | | 173.38 | m2 |
|---|
| 42 | 5.03 | Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete | | 18.44 | m |
|---|
| 43 | 5.04 | Electrification | | 1 | no |
|---|
| 44 | 6 | TOILET | | | |
|---|
| 45 | 6.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead and lift etc. completefor building work | | 19 | m3 |
|---|
| 46 | 6.02 | Random rubble in cement mortar 1:8 for foundation and basement including cost of all material, laboour charge etc. complete for foundation | | 28 | m3 |
|---|
| 47 | 6.03 | Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete | | 24 | m3 |
|---|
| 48 | 6.04 | RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete | | 2 | m3 |
|---|
| 49 | 6.05 | Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level | | 200 | kg |
|---|
| 50 | 6.06 | Supplying and fixing wood work for doors windows and ventilators including cost of all materials and labour charge etc complete (D - 3, w - 8) | | 11 | nos |
|---|
| 51 | 6.07 | Plastering with CM 1:4, 12 mm thick for inside and outside the wall including cost of all material, labour charge etc complete | | 261 | m2 |
|---|
| 52 | 6.08 | Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete | | 10 | m3 |
|---|
| 53 | 6.09 | Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete | | 98 | m2 |
|---|
| 54 | 6.1 | Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete | | 261 | m2 |
|---|
| 55 | 7 | TRUSS | | | |
|---|
| 56 | 7.01 | Steel work built up tubular trusses etc including cutting, hoisting, fixing position and applying a priming coat of steel primer, including welding and bolted with special shaped washers etc complete hot finished seamless type tube | | 696 | kg |
|---|
| 57 | 7.02 | Roofing with GI hard colour power coated traffod sheets .35mm thick or nearest available thickness with overlap 150mm at ends and GI hook or cranck CI bolts and nuts including plain washers and bitumen washers etc complete | | 174 | m2 |
|---|
| 58 | 7.03 | Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete | | 19 | m |
|---|
| 59 | 8 | TOILET | | | |
|---|
| 60 | 8.01 | Earth work excavation in ordinary soil and depositing on bank with initial lead and lift etc. complete for building work | | 2.37 | m3 |
|---|
| 61 | 8.02 | Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement | | 3.71 | m3 |
|---|
| 62 | 8.03 | Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete | | 3.268 | m3 |
|---|
| 63 | 8.04 | RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete | | 1.869 | m3 |
|---|
| 64 | 8.05 | Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level | | 200 | kg |
|---|
| 65 | 8.06 | Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete. (Aanjili with painting) | | 4 | no |
|---|
| 66 | 8.07 | Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete | | 32.52 | m2 |
|---|
| 67 | 8.08 | Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete | | 16.32 | m2 |
|---|
| 68 | 8.09 | Plastering in CM 1:3 9mm thick ceiling and sundhade including cost ofall aterial labour charge etc. complete | | 14.73 | m2 |
|---|
| 69 | 8.1 | Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete | | 0.1 | m3 |
|---|
| 70 | 8.11 | Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete | | 187.79 | m2 |
|---|
| 71 | 8.12 | Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete | | 47.25 | m2 |
|---|
| 72 | 9 | Godown Trussed Roof | | | |
|---|
| 73 | 9.01 | Steel work built up tubular (Round, squae or rectangular hollow tubes etc) trusses etc. Including cutting hoisting fixing position and applying a priming coat of steel primer including welding and bolted with special shapped washers etc complete hot dinished seamless type tubes | | 129.96 | kg |
|---|
| 74 | 9.02 | Roofing with GI hard colour powder coated traffold sheets 0.35 mm thick or nearest available thickness with over lap 150mm at ends and GI hook crank CI bolts and nuts including pain washersand bitumen washers etc complet | | 32.49 | m2 |
|---|
| 75 | 9.03 | Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete | | 5.7 | m |
|---|
| 76 | 9.04 | Electrification and water supply | | 1 | no |
|---|
| 77 | 10 | TOILET | | | |
|---|
| 78 | 10.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift etc. complete for building work | | 26.75 | m3 |
|---|
| 79 | 10.02 | Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement | | 40.18 | m3 |
|---|
| 80 | 10.03 | Laterite massonary in CM 1:6 for super structure including cost of all material labour charge etc complete | | 52.65 | m3 |
|---|
| 81 | 10.04 | RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete | | 4.5 | m3 |
|---|
| 82 | 10.05 | Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level | | 200 | kg |
|---|
| 83 | 10.06 | Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete.(D - 5, w - 6) | | 11 | nos |
|---|
| 84 | 10.07 | Providing and fixing MS Grills of required pattern in frames of ventilator etc with MS flats square or round bars etc.including priming coat with approved steel primer all complete. Fixed to steel ventilator by welding | | 96 | kg |
|---|
| 85 | 10.08 | Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete | | 550.04 | m2 |
|---|
| 86 | 10.09 | Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete | | 18.77 | m3 |
|---|
| 87 | 10.1 | Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete | | 188 | m2 |
|---|
| 88 | 10.11 | Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete | | 551 | m2 |
|---|
| 89 | 10.12 | Steel work built up tubular trusses etc including cutting hoisting position and applying a priming coat of steel primer, including welding and bolted with special shapes washers etc. complete hot finished seamless type tubes | | 1274 | kg |
|---|
| 90 | 10.13 | Roofing with GI hard colour power coated fraffod sheets .35 mm thick or nearest available thickness with over laps 150 mm at ends and GI hook or crank CI bolts and nuts including plain washers and bitumin washers etc complete. | | 319 | m2 |
|---|
| 91 | 10.14 | Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete | | 22 | m |
|---|
| 92 | 10.15 | Electrification | | 1 | no |
|---|
| 93 | 11 | REST ROOM AND TOILET | | | |
|---|
| 94 | 11.01 | Earth work excavation in ordinary soil with in an intial lead of 50 m and lift 1.5m including labour charge etc. complete | | 8 | m3 |
|---|
| 95 | 11.02 | Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement | | 12 | m3 |
|---|
| 96 | 11.03 | Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete | | 15 | m3 |
|---|
| 97 | 11.04 | RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete | | 5 | m3 |
|---|
| 98 | 11.05 | Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level | | 500 | kg |
|---|
| 99 | 11.06 | Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete. | | 13 | nos |
|---|
| 100 | 11.07 | Plastering in CM 1:4 12mm thick for inside and outside the wall including cost of all material labour charge etc. | | 159 | m2 |
|---|
| 101 | 11.08 | Plastering with CM 1:4 12mm thick over the roof slab including cost of all material, labour charge etc. complete | | 39 | m2 |
|---|
| 102 | 11.09 | Plastering in CM 1:3 9mm for ceiling and sunshade including cost of all material labour charge etc. complete | | 34 | m2 |
|---|
| 103 | 11.1 | Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete | | 1 | m3 |
|---|
| 104 | 11.11 | Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete | | 21 | m2 |
|---|
| 105 | 11.12 | Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete | | 192 | m2 |
|---|
| 106 | 11.13 | Electrification & water supply | | 1 | no |
|---|