Indian Oil Corporation Limited-IOCL has published Supply Of High Voltage Power Factor Improvement Capacitor And Apfc Panel Supply Of High Voltage Power Factor Improvement Capacitor And Apfc Panel For Fuel Quality Upgradation Project At Iocl Paradip Refinery. Submission Date for this Tender is 28-01-2020. Power Factor Panel Tenders in Paradip Odisha. Bidders can get complete Tender details and download the document.
Name of Work: SUPPLY OF HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL FOR FUEL QUALITY UPGRADATION PROJECT AT PARADIP REFINERY | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply of HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL in accordance with materital requisition. | |||
2 | 1.01 | Design, Engineering, Manufacturing, Testing (FAT), Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning of HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL FOR FUEL QUALITY UPGRADATION PROJECT AT PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item1 | 4 | Set |
3 | 2 | Charges for Site Supervision of Erection Testing & Commissioning of HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL | |||
4 | 2.01 | Per diem charges for upto 8 hours work on normal working days. | item2 | 1 | Man Day |
5 | 2.02 | Overtime rate / hour beyond normal 8 hours work on normal working days. | item3 | 1 | Per Hour |
6 | 2.03 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). | item4 | 1 | Per Hour |
7 | 3 | Charges for Training at IOCL Paradip Refinery for HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL | |||
8 | 3.01 | Charges for Training at site for HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL | item5 | 1 | Lumpsum |
9 | 4 | Charges for 2 years Operation and Maintenance Spares for HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL\nRecommended spares for two years trouble-free operation. \nNote: Vendor shall furnish separately a complete list of recommended spares with their unit rate indicated along side. | |||
10 | 4.01 | Charges for 2 years Operation and Maintenance Spares for HIGH VOLTAGE POWER FACTOR IMPROVEMENT CAPACITOR AND APFC PANEL . Recommended spares for two years trouble-free operation. | item6 | 1 | Lot |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail