Providing And Construction Of Cement Concrete Road At Taleshwar Colony , Begumpura In Ward No . 12 Near House Of Irale And Shelke . , Excavation For Roadway In Earth , Soil Of All Sorts , Sand , Gravel Or Soft Murum Including Dressing Section To The Required Grade , Camber And Side Slopes And Conveying The Excavated Materials With All Lifts Upto A Lead Of 50M . And Spreading For Embankment Or Stacking As Directed . ( Ssr 2017-18 It . No . 2 . 11 ) , Conveying Materials Obtained From Road Cutting Including All Lifts , Laying In Layers Of 20Cm To 30Cm . Breaking Clods , Dressing To The Required Lines , Curves , Grades And Section , Watering And Compacting To Not Less Than 97% Of Standard Proctor Density For A Lead Of Over 50M . To 300M . Inclusive From The Site Of Excavation To The Site Of Deposition As Directed . ( Ssr 2017-18 It . No . 2 . 25 ) Lead 3 . 00 Km , Construction Of Granular Sub-Base By Providing Close Graded Material , Spreading In Uniform Layers With Motor Grader / Paver On Prepared Surface , Mixing By Mix In Place Method With Rotavator At Omc , And Compacting With Vibratory Roller To Achieve The Desired Density , Complete As Per Clause 401 -- By Mix In Place Method And Grading - Ii Material ( Ssr 2017-18 It . No . 3 . 05 ) , Providing And Laying In Situ Cement Concrete In M-10 / 1 : 3 : 6 Of Trap / Granite / Quartzite / Gneiss Metal For Foundation And Bedding Including Dewatering , Form Work , Compacting , Roughening Them If Special Finish Is To Be Provided , Finishing If Required And Curing Complete , With Fully Automatic Micro Processor Based Plc With Scada Enabled Reversible Drum Type Mixer / Concrete Batch Mix Plant ( Pan Mixer ) Etc . Complete . With Natural Sand / V . S . I . Quality Artificial Sand . ( Ssr 2017-18 It . No . 24 . 01 ) , Providing And Laying In-Situ M30 Grade Unreinforced Plain Cement Concrete Pavement Over A Prepared Sub Base With 43 Grade Cement , Coarse And Fine Aggregate Conforming To Is 383 , Using Fine And Coarse Aggregates Combined Gradation As Per Table 600-3 Of Morth Specification 2013 , Mixed In A Batching And Mixing Plant / Non Tilting Mixer And Weigh Batcher As Per Approved Mix Design , Admixtures , Transporting To Site , Spreading , Laying Compacting And Finished In A Continuous Operation , Finishing To Lines And Grades As Directed By Engineer In-Charge And Curing By Curing Compound / By Providing Cement Vata In Cement Mortar 1:8 @0 . 6M X 0 . 6M Centre To Centre , Admeasuring 80 Mm At Bottom And 40 Mm At Top With Depth Of 75Mm And Maintaining The Same Throughout Curing Period By Any Other Method Approved By Engineer-In-Charge . ( Intial Lead Of 5 . 00 Km For Raw Materials Up To Plant Site ) Spec . No . M . O . R . T . And H 2013 Cl . 602 P . N . 263 Morth 602 5 . 03 Morth 602 ( Ssr No . 5 . 04 ) , Excavation For Roadway In Soft Rock , Including Dressing Section To The Required Grade , Camber And Side Slopes And Conveying The Excavated Materials With All Leads Upto A Lead Of 50M . And Spreading For Embankments Or Stacking Etc Complete As Directed By Engineer In Charge ( Ssr 2017-18 It . No . 2 . 14 ) , Raising The Existing Manhole Chamber With 23 Cm Thick Brick Work In Cm 1 : 5 Prop . In 30 Cm Concentrick Cone Includig 12 Mm Thik Cement Plaster In Cm 1 : 4 Prop On Both Side Complete . ( As Per Rate Analysis ) No . , Fixing Of Sfrc Frame And Cover To Manhole Chamber / Rectasngular S . F . R . C . Cover And Frame In C . C . M-15 ( Concrete 1 : 2 : 4 Prop . ) Etc . Complete . ( As Per Rate Analysis ) 22- Circular Hd 540 / 630 With Frame . , Providing And Fixing Factory Made Hydraulically Pressed Mechanically Vibrated And Compacted Precast Inter Locking Cement Concrete Paving Blocks 100Mm Thick In M-40 Grade Of Approved Size And Shape For City Streets And Roads With High Volume / Heavy Traffice As Specified And As Per Is 15658:2006 Including Cost Of All Materials , Manufacturing , Curing , Transportation Of Blocks To Work Site Including Loading , Unloading And Stacking As Directed , Laying Paving Blocks In Position Over Prepared Bed Of Natural Sand / Crushed Sand Of 50 Mm Thickness Including Necessary Excavation In All Stratas , Spreading Blindge Of Fine Sand Over The Prepared Bed , Compacting Blocks By Plate Vibrator Etc . Complete . ( Ssr 2017-18 It . No . 5 . 21 ) , Supplying Hard Murum At The Road Side Including Conveying And Stacking Etc . Complete As Directed By Engineer In Charge Spec . No . Rd . 23 / Page No . 203 Dsr I No . 679 Page No . 146 Ssr No . 2 . 29 , Spreading Gravel Sand / Soft Murum / Hard Murum Etc . Complete As Directed By Engineer In Chargespec . No . Rd . 28 / Page No . 205 . Pwd / Dsr / 2013-2014 Page No . 654 Item No . 176 . , Taking For Compressive Strength Of Cement Concrete Cube ( Set Of 3Cubes ) Etc Complete Ssr Page No . 387 Sr . No . 25 / 2017-18 . , Testing For Takig Concrete Core Samples In Concrete Pavement ( Excluding Dead Journey Charges ) Etc Complete Ssr Page No . 387 Sr . 20 2017-18 . , Scarifying The Existing Granular Road Surface To A Depth Of 50 Mm And Disposal Of Scarified Material Within All Lifts And Leads Upto 1000 Metres . Ssr No . 3 . 09 , Royalti Charges For Metal , Sand Murum Etc Complete .