Name of Work: MW (Cons) to Group of Hemakuta Jaina Temple at Hampi.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Sub Heading 1
2
1.01
Labour charges for reconstruction of the dismantled architecture members by using the hydraulic machineries, chainpully block derric pole where ever necessary depending the dimension of the stone architectural members carefully without causing any damage to it further re erecting the members to the original alignment with reference to the bench mark available at site with the help of the total station survey instrument after necessary cleaning the architectural members with sailable detergent and water etc., complete as per the direction of the Conservation Assistant
item1
160.15
Cum
3
1.02
Labour charges for fixing of new granite stone beam, capital and pillars including cost of dressing charges as per original and erection charges with the help of chainpully, derric pole, High skilled labourers etc., complete.
item2
31.8
Cum
4
1.03
Labour charges for fixing of new roof slabs as per original and erection charges with the help of chainpully, derric pole, High Skilled labour etc., complete.
item3
55.66
Sqm
5
1.04
Labour charges for fixing of fresh granite stones for veneering stone slabs and erection charges with the help of chainpully, derric pole, High Skilled labour and transportation of stone blocks from stocking yard to work spot through high skilled labour etc., complete.
item4
16.45
Cum
6
1.05
Labour charges for fixing of new granite flooring stone slabs for cloister mantapa and providing proper gravel bedding of 10cms thick including curing and fixing the same with the help of Heavy stone Lifters and etc., complete
item5
92.1
Sqm
7
1.06
Labour charges for providing for filling the core with brick masonry in lime surki mortar including curing the necessary scaffolding at various stages without causing any damage to the structure by providing necessary support to the erected structure etc., complete.(materials will be supplied departmental)
item6
49.28
Cum
8
1.07
Labour charges for scientific clearance for clearing the debris mixed with stone boulders, rubbles and earth for finding the orginal working level up to the pada level of the mantapa all along the line of mantapa on both side without causing any damage to the ancient mantrap's/structures/architectural members by manually using tipper/tractor for disposing the unwanted materials etc., complete
item7
450
Cum
9
1.08
Labour charges for laying the brick jelly concrete for weather proof course using good quality brick jelly preparation of the lime surki mortar in the ration 1:1:3 mix in layers of not more than 10cms including necessary ramming for uniform compaction and to obtain dense layer including keeping the surface wet for 10 days etc., complete.(materials will be supplied departmental)
item8
81.57
Cum
10
1.09
Labour charges of lime plaster 1:1:1 (one part of lime 1 part of sand and 1 part of surkhi) including mixing with the binding materials kadakai, jaggery and natrural gum cost of scaffolding plaster as per original in 2 layers 20mm thick rough plastering and 10mm thick fine plastering and curing the surface etc., complete. ( 30mm thickness)(materials will be supplied departmental)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.