| 1 | 1 | FIBRE CLEANING TANK | | | |
|---|
| 2 | 1.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete | | 3.19 | cum |
|---|
| 3 | 1.02 | Random rubble in cement mortar 1:8 for foundation and basement | | 1.59 | cum |
|---|
| 4 | 1.03 | Brick work in cement mortar 1:6 with country burnt bricks of nominal size (22.9 cm x 11.2 cm x 7 cm) | | 5.08 | cum |
|---|
| 5 | 1.04 | Flooring with cement concrete 1:4:8, 75 mm thick using 40mm (nominal size) broken stone | | 6.6 | m2 |
|---|
| 6 | 1.05 | Plastering with cement mortar 1:4, 12mm thick one coat floated hard and towelled smooth | | 60.8 | m2 |
|---|
| 7 | 1.06 | Painting leack proofing ingradient | | 60 | m2 |
|---|
| 8 | 2 | CONSTRUCTION OF REST ROOM | | | |
|---|
| 9 | 2.01 | Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete | | 7.06 | cum |
|---|
| 10 | 2.02 | Dry stone masonry for foundation and basement | | 11.03 | cum |
|---|
| 11 | 2.03 | Hollow block masonry for super structure using hollow concrete blocks of available size 40x20x20 cms in cm 1:8 | | 12.64 | cum |
|---|
| 12 | 2.04 | Cement concrete 1:2:4 using 20mm metal for reinforced concrete work excluding reinforcement | | 3.05 | dm3 |
|---|
| 13 | 2.05 | Reinforcement of RCC works, bent.tied and placed in position | | 300 | kg |
|---|
| 14 | 2.06 | Plastering with cement mortar 1:5 12 mm thick floated hard and trowelled smooth one coat | | 111.21 | m2 |
|---|
| 15 | 2.07 | Flooring with cement concrete 1:5:10 75 mm thick using 40 mm (nominal size) brocken stone | | 12.5 | m2 |
|---|
| 16 | 2.08 | Floor finishing with first quality tiles of 22.5cmx22.5cm size laid in 12mm thick cement mortar 1:3 and pointed with suitable color oxide | | 12.5 | m2 |
|---|
| 17 | 2.09 | Pointing random rubble masonry with cement mortar 1:4 | | 7.47 | m2 |
|---|
| 18 | 2.1 | Cement washing two coats | | 130 | m2 |
|---|
| 19 | 3 | EXTENTION WORK of work shed | | | |
|---|
| 20 | 3.01 | Roofing with A.C corrugated sheets with G.I bolts & nuts and bitumin washers including necessary over laps of 150 mm at ends. Complete | | 493.16 | m2 |
|---|
| 21 | 3.02 | Steel work in MS angles Teex and channels (in isingle section) cutting hoisting and fixing in position including applying one coat of iron primer etc complete | | 2300 | kg |
|---|
| 22 | 3.03 | Floor finishing with first class paving tiles of 22.5x22.5 cm size | | 172.3 | m2 |
|---|
| 23 | 4 | Maintenance of work shed | | | |
|---|
| 24 | 4.01 | Partition wall with galvanised iron corrugated sheets .8mm thick or nearest available size with ovelaps of 150mm at ends and G.I Hooks or crank bolts and nuts including plane wahses and bitumin washwer etc complete | | 174 | m2 |
|---|
| 25 | 4.02 | Supplying and fixing MS net grill to walls for fully openable windows and ventilators with standard MS sections as per the design and drawings | | 66 | dm2 |
|---|
| 26 | 4.03 | Providing glazed windows and ventilators | | 1 | nos |
|---|
| 27 | 4.04 | Normel ceiling fan & exaust fan | | 1 | nos |
|---|
| 28 | 4.05 | Top exaust terminal fan | | 2 | nos |
|---|