| 1 | 1 | Providing and Laying screening material for GSB do ……do …as per E/I12(i)BCD | BI01010001010000000000000515BI0100001112 | 161.253 | M³ |
|---|
| 2 | 2 | Providing rolling and compaction with smooth wheeled roller do…………do…..as per E/I 3.17 DSR | BI01010001010000000000000515BI0100001113 | 161.253 | M³ |
|---|
| 3 | 3 | Providing PCC M-200 in foundation and plinth do…………do…..as per E/I 5.3.2.1 | BI01010001010000000000000515BI0100001114 | 146.66 | M³ |
|---|
| 4 | 4 | Filling in Foundation trench and plinth in both side of Road do…………do…..as per E/I5.1.7 | BI01010001010000000000000515BI0100001115 | 117.369 | M³ |
|---|
| 5 | 5 | E/W in excavation in foundation and plinth as per drawing and technical specification, including setting ourt, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (5.1.1) G/W 33.984 Bridge 38.71 Ordinary Soil | BI01010001010000000000000515BI0100001116 | 16.29 | M³ |
|---|
| 6 | 6 | Providing Sand filling and Plinth do…………do…..as per E/I5.1.10 | BI01010001010000000000000515BI0100001117 | 2.43 | M³ |
|---|
| 7 | 7 | Providing PCC M-100 with nominal mix (1:3:6) in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration | BI01010001010000000000000515BI0100001118 | 3.24 | M³ |
|---|
| 8 | 8 | Providing rough dressed course masonary in C.M (1:4) in foundation -do-do- all complete as per spec.& dirction of E/I Abutment W.W Ret.W | BI01010001010000000000000515BI0100001119 | 8.92 | M³ |
|---|
| 9 | 9 | Providing rough dressed course masonary in C.M (1:4) in Substructure -do-do- all complete as per spec.& dirction of E/I Abutment W.W Ret.W | BI01010001010000000000000515BI0100001120 | 4.05 | M³ |
|---|
| 10 | 10 | Providing PCC M-150 with nominal mix (1:2:4) in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration | BI01010001010000000000000515BI0100001121 | 0.83 | M³ |
|---|
| 11 | 11 | Providing earth work in filling in Foundation -do-all comlete job as per specification of E/I | BI01010001010000000000000515BI0100001122 | 10.86 | M³ |
|---|
| 12 | 12 | Providing and Laying MP3 RCC Hume Pipe do…………….do as per E/I | BI01010001010000000000000515BI0100001123 | 7 | mtr |
|---|
| 13 | 13 | Providing Truck Pointing (1:3)in cement on stone masonry (1:3)as per drwaing and technical specification G/W | BI01010001010000000000000515BI0100001124 | 13.6 | M2 |
|---|
| 14 | 14 | Providing granular surface such as moorum -do-do- all complete as per specification & direction of E/L | BI01010001010000000000000515BI0100001125 | 219.37 | M3 |
|---|
| 15 | 15 | Providing disgnation 75B bricks flate soling in foundation and plinth ,……….do do as per E/I | BI01010001010000000000000515BI0100001126 | 16.2 | m3 |
|---|
| 16 | 16 | Carrige of matrial\n\na. Sand 5km | BI01010001010000000000000515BI0100001127 | 72.798 | M³ |
|---|
| 17 | 16.01 | b. Cement20km | BI01010001010000000000000515BI0100001128 | 65.918 | MT |
|---|
| 18 | 16.02 | c. Chips30km | BI01010001010000000000000515BI0100001129 | 126.606 | M³ |
|---|
| 19 | 16.03 | d.Boulder 30 km | BI01010001010000000000000515BI0100001130 | 12.97 | M³ |
|---|
| 20 | 16.04 | e. Metal 30km | BI01010001010000000000000515BI0100001131 | 2.99 | M³ |
|---|
| 21 | 16.05 | f. bricks30km | BI01010001010000000000000515BI0100001132 | 527 | no |
|---|
| 22 | 16.06 | g.Mouram 5km | BI01010001010000000000000515BI0100001133 | 219.37 | m3 |
|---|
| 23 | 16.07 | h.GSB30km | BI01010001010000000000000515BI0100001134 | 161.253 | m3 |
|---|
| 24 | 17 | Add 12% GST | BI01010001010000000000000515BI0100001135 | 1.38822e+06 | Rs. |
|---|
| 25 | 18 | Add 1% Labou rcess | BI01010001010000000000000515BI0100001136 | 1.55481e+06 | Rs. |
|---|