| 1 | 1 | PHASE-I : ARBORICULTURE (PERIOD OF COMPLETION : 06 MONTHS) | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | Excavation Over Areas, not exc 1.50 Metre in depth and getting out in Soft /Loose Soil, complete all as specified and as directed. | BI01010001010000000000000515BI0100001114 | 250 | CUBIC METRE |
|---|
| 3 | 1.02 | Excavating in Post Hole (or Similar Hole) of size 60 Cm x 60 Cm x 60 Cm), Each not exc. 0.50 Cum in Soft/Loose Soil, getting out including spread and levelled with Excavated Surplus Soils, complete all as specified and as directed. | BI01010001010000000000000515BI0100001115 | 747 | EACH |
|---|
| 4 | 1.03 | Returning, Filling in including Spreading, Levelling, Watering and Well Ramming in layers not exc. 25 Cm, in Soft/Loose Soil, complete all as specified and as directed. | BI01010001010000000000000515BI0100001116 | 60 | CUBIC METRE |
|---|
| 5 | 1.04 | Removing Excavated Materials (Soils) not exc. 50.00 Metre and depositing where directed at a level not exc. 1.50 Metre above the Starting Point, complete all as specified and as directed. | BI01010001010000000000000515BI0100001117 | 350.85 | CUBIC METRE |
|---|
| 6 | 1.05 | M&L Excavated Earth (after Removal of Rubbish) mixed with Manure in the ratio of 3:1 by Volume (3 Part of Stacked Volume of Earth after Reduction by 20% and 1 Part of Stacked Volume of Manure after Reduction by 20%) as indicated on Graden. All Finished Areas shall Slope to Drain where no Grades are shown the Areas as necessary to obtain ture even grassing surface grassing with Dhub/ Doob Grass including watering and maintenance of the lawn for 30 DAYS or more till the grass forms a thick lawn free from weeds and fit for moving including supplying sweet earth if needed in Rows 5.0 Cm apart 5.0 Cm apart in either direction, complete all as specified and as directed.\nNOTE :- \n(a) Cost of Dude/ Doob Grass is included in the Quoted Unit Rate in this Item.\n(b) Manure and Pesticide required shall be Measured and Paid separately under Item No. 1.06 & 1.07 as ordered. | BI01010001010000000000000515BI0100001118 | 150 | CUBIC METRE |
|---|
| 7 | 1.06 | Supply & Stacking Good quality Earth/ Fertile Soil at Site(s) brought from Outside of MD Land including paying Royalty and Carriage for all Leads and Lifts, complete all as specified and as directed.\nNOTE : For the purpose of Payment the Stack Measurments shall by Reduced by 20% for Voids. | BI01010001010000000000000515BI0100001119 | 100.85 | CUBIC METRE |
|---|
| 8 | 1.07 | Supply & Stacking Dung/ Manure and Sludges at Site(s) brought from Outside of MD Land including paying Royalty and Carriage Work at Site(s) and preparing for Trees, complete all as specified and as directed.\nNOTE : For the purpose of Payment the Stack Measurments shall by Reduced by 20% for Voids. | BI01010001010000000000000515BI0100001120 | 156.8 | CUBIC METRE |
|---|
| 9 | 1.08 | M&L ATT Chemicals viz Chlorophyriphos (Chlorophyriphos or Lindane Emulsifiable Concentrate, conforming to IS:632) and Treating of Post Holes for Plantation of Trees, complete all as specified and as directed. | BI01010001010000000000000515BI0100001121 | 10 | LITRE |
|---|
| 10 | 1.09 | Supply only AMALTAS TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001122 | 10 | EACH |
|---|
| 11 | 1.1 | Supply only ASHOKA TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001123 | 310 | EACH |
|---|
| 12 | 1.11 | Supply only BOTTLE BRUSH TREE (PALM SHADY, SHRUBS) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001124 | 20 | EACH |
|---|
| 13 | 1.12 | Supply only BOUGAINVILLA TREE (ORNAMENTAL TREE, BUGANBEL) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/ planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001125 | 80 | EACH |
|---|
| 14 | 1.13 | Supply only CESTRUM NOCTURNUM (RAT KI RANI ORNAMENTAL TREE) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/ planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001126 | 15 | EACH |
|---|
| 15 | 1.14 | Supply only CREPE MYRTLE TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001127 | 20 | EACH |
|---|
| 16 | 1.15 | Supply only JACK FRUIT (KATAHAL SHADY TREE) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001128 | 10 | EACH |
|---|
| 17 | 1.16 | Supply only JACRANDA MIMOSIFOLIA TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001129 | 10 | EACH |
|---|
| 18 | 1.17 | Supply only JERUSALEM THORN TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001130 | 10 | EACH |
|---|
| 19 | 1.18 | Supply only MANGO TREE/ BEL PATRA/ PIPAL (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001131 | 12 | EACH |
|---|
| 20 | 1.19 | Supply only OLEANDER TREE (SHADY, FLOWER DARK PINK) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001132 | 20 | EACH |
|---|
| 21 | 1.2 | Supply only PIN WHEEL FLOWER (GREEN CHANDANI) (ORNAMENTAL TREE) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/ planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001133 | 200 | EACH |
|---|
| 22 | 1.21 | Supply only SOPHORA JAPONICA (PAGODA SHADY TREE) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001134 | 10 | EACH |
|---|
| 23 | 1.22 | Supply only YELLOW TRUMPET TREE (SHADY) in Healthy Condition (as approved by GE), 2 Feet to 3 Feet in Height, encasing/planted in Poly Bag 10\" to 12\" dia, complete all as specified and as directed. | BI01010001010000000000000515BI0100001135 | 20 | EACH |
|---|
| 24 | 1.23 | M&L Preparing of Pit suitable for BOUGAINVILLA (ORNAMENTAL TREE) in Ordinary Soil with Anti-termite Treatment Solution @ 50ml in 25 Litre of Water for Each Pit) after Re-filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure or Sludge in the Ratio 3:1 by Volume (3 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001136 | 80 | EACH |
|---|
| 25 | 1.24 | M&L Preparing of Pit suitable for DADONAE/ PIN WHEEL (GREEN CHANDANI ORNAMENTAL TREE) in Ordinary Soil with Anti-termite Treatment Solution @ 50ml in 25 Litre of Water for Each Pit) after Re-filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure or Sludge in the Ratio 3:1 by Volume (3 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001137 | 200 | EACH |
|---|
| 26 | 1.25 | M&L Preparing of Pit suitable for AMALTAS TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001138 | 10 | EACH |
|---|
| 27 | 1.26 | M&L Preparing of Pit suitable for ASHOKA TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001139 | 310 | EACH |
|---|
| 28 | 1.27 | M&L Preparing of Pit suitable for BOTTLE BRUSH TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001140 | 20 | EACH |
|---|
| 29 | 1.28 | M&L Preparing of Pit suitable for CREPE MYRTLE TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001141 | 20 | EACH |
|---|
| 30 | 1.29 | M&L Preparing of Pit suitable for JACK FRUIT (KATAHAL SHADY TREE) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001142 | 10 | EACH |
|---|
| 31 | 1.3 | M&L Preparing of Pit suitable for JACRANDA MIMOSIFOLIA TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001143 | 10 | EACH |
|---|
| 32 | 1.31 | M&L Preparing of Pit suitable for MANGO TREE/ BEL PATRA/ PIPAL (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001144 | 12 | EACH |
|---|
| 33 | 1.32 | M&L Preparing of Pit suitable for OLEANDER TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001145 | 20 | EACH |
|---|
| 34 | 1.33 | M&L Preparing of Pit suitable for SOPHORA JAPONICA (PAGODA SHADY TREE) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001146 | 10 | EACH |
|---|
| 35 | 1.34 | M&L Preparing of Pit suitable for YELLOW TRUMPET TREE (SHADY) in Ordinary Soil with Anti-termite Treatment Solution of Soil after Returning, Filling the Mixture of Excavated Earth, Fertilite Soils/ Good Earth and mixed with Manure in the Ratio 2:1 by Volume (2 Parts of Earth (after Reduction by 20% of Stacked Volume) and 1 Part of Manure (after Reduction by 10% of Stacked Volume), Flooding with water, dressing and removing surplus soil to distance not exc. 50.00 Metre including spreading, levelling including stacking supporting with stick of Plant/ Shrubs (if any) with all leads and lifts, complete all as specified and as directed.\nNOTE : Cost of Manure Pesticide or Extra Good Earth if required at Site(s) shall be Measured and Paid for separately under appropriate Items. | BI01010001010000000000000515BI0100001147 | 20 | EACH |
|---|
| 36 | 1.35 | S&F Galvanised Steel Tubing 20mm bore (dia), medium grade, conforming to IS-1239 with all Fittings, laying in Trenches, complete all as specified and as directed. | BI01010001010000000000000515BI0100001148 | 25 | RUNNING METRE |
|---|
| 37 | 1.36 | S&F Galvanised Steel Tubing 20mm bore (dia), medium grade, conforming to IS-1239 with all Fittings, fixed to Walls, Ceiling or laid in Floors, complete all as specified and as directed. | BI01010001010000000000000515BI0100001149 | 25 | RUNNING METRE |
|---|
| 38 | 1.37 | S&F Galvanised Steel Tubing 25mm bore (dia), medium grade, conforming to IS-1239 with all Fittings, laying in Trenches, complete all as specified and as directed. | BI01010001010000000000000515BI0100001150 | 12 | RUNNING METRE |
|---|
| 39 | 1.38 | S&F Galvanised Steel Tubing 25mm bore (dia), medium grade, conforming to IS-1239 with all Fittings, fixed to Walls, Ceiling or laid in Floors, complete all as specified and as directed. | BI01010001010000000000000515BI0100001151 | 12 | RUNNING METRE |
|---|
| 40 | 1.39 | S&F Bib Tap 20mm bore (dia) Cast Copper alloy, Chromium Plated, with Crutch or Butter-fly Handle, screwed down, screwed for Iron Pipe or for Brass Ferrule, complete all as specified and as directed. | BI01010001010000000000000515BI0100001152 | 10 | EACH |
|---|
| 41 | 1.4 | S&F Gun Metal Globe/Gate Valve 25mm bore (dia) with Iron Wheel Head, ISI marked, screwed both Ends for Iron Pipe, complete all as specified and as directed. | BI01010001010000000000000515BI0100001153 | 25 | EACH |
|---|
| 42 | 1.41 | S&F Valve (as approved), Straight, Plain, Brass Ferrule or Connecting Screws, screwed both Ends, complete all as specified and as directed. | BI01010001010000000000000515BI0100001154 | 6 | EACH |
|---|
| 43 | 1.42 | Supply only Flexible PVC Pipe 25mm bore (dia) for Horticulture Purpose, complete all as specified and as directed. | BI01010001010000000000000515BI0100001155 | 200 | RUNNING METRE |
|---|
| 44 | 2 | PHASE-II : MAINTENANCE (PERIOD OF COMPLETION: 24 MONTHS FROM THE DATE OF PHYSICAL COMPLETION OF PHASE-I) | BI01010001010000000000000515BI0100001156 | | |
|---|
| 45 | 2.01 | M&L Complete Maintenance of Plants/ Hedges/ Grass by weeding hosing watering saucer making ONCE in Every Month for Plants/ Hedges, Insect Pest Management (as and when required), pruning dried branches ONCE in a Week, depositing the Materials at Places as directed, Planting of New Plants in Places of Dead Plants of Same Species and Height, tuning without any Extra Cost to the Department, complete for all Entire Works and Enrichment with Manure @ 0.003 Cum Per Pit, complete all as specified and as directed.\nNOTE : Manure, Pesticide, etc. as required for Maintenance of Plants under this Item shall be arranged by the Contractor at his Own Cost & Arrangements and Cost of the Same shall deemed to bE included in the Quoted Unit Rate. | BI01010001010000000000000515BI0100001157 | 24 | PER MONTH |
|---|