| 1 | 1 | DAY TO DAY MAINTENANCE WORK INCLUDING ASSISTANCE SERVICE TO CONTROL AND INSTRUMENT SECTION & ELECTRICAL SECTION WORK IN MILLING PLANT OF BOTH UNIT#1&2 | task1 | 24 | No |
|---|
| 2 | 2 | REMOVAL AND REFITTING OF JOURNAL ASSEMBLY (PER ASSY) | task2 | 90 | No. |
|---|
| 3 | 3 | SERVICING OF JOURNAL ASSY WITH JOURNAL HEAD AND TRUNION SHAFT ASSEMBLY INCLUDING GRINDING ROLLER (PER ASSY) | task3 | 96 | No. |
|---|
| 4 | 4 | REPLACEMENT OF UPPER JOURNAL OR LOWER JOURNAL BEARING (PER BEARING) | task4 | 30 | No. |
|---|
| 5 | 5 | REPAIR OF JOURNAL HEAD FOR OCCASSIONS OTHER THAN SERVICING OF JOURNAL ASSY WITH JOURNAL HEAD (PER ASSY) | task5 | 30 | No. |
|---|
| 6 | 6 | REPLACEMENT OF BULL RING SEGMENT (PER MILL) | task6 | 30 | No. |
|---|
| 7 | 7 | REPLACEMENT OF JOURNAL SPRING ASSEMBLY (PER ASSEMBLY) | task7 | 25 | No. |
|---|
| 8 | 8 | REPLACEMENT OF AIRPORT RING ASSEMBLY (PER MILL) | task8 | 12 | No. |
|---|
| 9 | 9 | LINER FABRICATION & FITTING IN MILL BODY(PER SQ. METER) | task9 | 120 | Sq.Meter |
|---|
| 10 | 10 | REPLACEMENT OF MILL SIDE LINER (PER LINER) | task10 | 60 | No. |
|---|
| 11 | 11 | REPLACEMENT/RESETTING OF INSULATION COVER PLATE (PER PLATE) | task11 | 60 | No. |
|---|
| 12 | 12 | REPLACEMENT/SERVICING OF SKIRT ASSEMBLY (PER MILL) | task12 | 50 | No |
|---|
| 13 | 13 | SERVICING, REPLACEMENT & SETTING OF TOTAL CLASSIFIER ASSEMBLY INCLUDING LINK, LINK ROD, SHAFTS, BLADES ETC. | task13 | 10 | No. |
|---|
| 14 | 14 | REPLACEMENT OF MILL DISCHARGE VALVE OR REPAIR / REPLACEMENT OF TRANSITION PIECE OF COAL PIPE (PER NUMBER) | task14 | 50 | No. |
|---|
| 15 | 15 | REPLACEMENT OF MPO (PER MPO) OR REPLACEMENT / REVERSAL OF ORIFICE JUST ABOVE MDV (PER ORIFICE) | task15 | 80 | No. |
|---|
| 16 | 16 | REPLACEMENT / REVERSAL OF ORIFICE (OTHER THAN JUST ABOVE MDV) (PER ORIFICE) | task16 | 36 | No. |
|---|
| 17 | 17 | REPAIR / REPLACEMENT OF MDV FLAP (PER NO) | task17 | 50 | No. |
|---|
| 18 | 18 | REPLACEMENT OF MILL OUTLET ELBOW (MOE) OR FUEL INLET ELBOW (FIE) SHORT AND LONG (PER ELBOW) | task18 | 20 | No. |
|---|
| 19 | 19 | REPLACEMENT OF PF ELBOW / BEND OTHER THAN MOE AND FIE WITH RELATED SUPPORT WORK (PER BEND) | task19 | 10 | No. |
|---|
| 20 | 20 | REPLACEMENT OF PF PIPE STRAIGHT PORTION ALONG WITH OTHER ASSOCIATED WORK (UPTO 5 METRE LENGTHS) | task20 | 10 | No. |
|---|
| 21 | 21 | REPLACEMENT OF RAW COAL CHUTE (PER MILL) | task21 | 16 | No. |
|---|
| 22 | 22 | SERVICING/REPLACEMENT OF BUNKER DISCHARGE COAL GATE (MOTORISED) OR FEEDER INLET GATE (MANUAL) | task22 | 15 | No. |
|---|
| 23 | 23 | SERVICING/REPLACEMENT OF RAW COAL FEEDER GATE (PNEUMATIC) | task23 | 10 | No. |
|---|
| 24 | 24 | REPLACEMENT OF BELT ALONG WITH SERVICING OF PULLEYS / IDLERS (PER FEEDER) | task24 | 80 | No. |
|---|
| 25 | 25 | SERVING/REPLACEMENT OF HOT AIR / COLD AIR GATE (PER GATE) INCLUDING SEAL | task25 | 40 | No. |
|---|
| 26 | 26 | SERVING/REPLACEMENT OF HOT AIR / COLD AIR REGULATING DAMPER (PER DAMPER) | task26 | 40 | No. |
|---|
| 27 | 27 | REPLACEMENT OF COUPLINGS BETWEEN MAIN MOTOR AND GEAR BOX (ANY OR BOTH OF BIBBY AND GEAR SIDE) (PER MILL) | task27 | 45 | No. |
|---|
| 28 | 28 | COAL MILL GEARBOX REPLACEMENT (PER MILL) | task28 | 8 | No. |
|---|
| 29 | 29 | FABRICATION OF JOURNAL HEAD LINER SUPPORT (PER SUPPORT) | task29 | 10 | No |
|---|
| 30 | 30 | REPLACEMENT OF BODY LINER SEGMENT OF AIR PORT RING ASSEMBLY (PER SET) BY FULL LENGTH WELDING | task30 | 30 | No |
|---|
| 31 | 31 | REPAIRING OF BOWL HUB OF LABYRINTH SEAL PORTION UPPER OR LOWER (PER MILL) | task31 | 15 | No. |
|---|
| 32 | 32 | REPLACEMENT OF INPUT SHAFT BEARING (DE/NDE) OF COAL MILL | task32 | 10 | No. |
|---|
| 33 | 33 | FIXING OF CERAMIC TILES IN CLASSIFIER CONE & OTHER AREAS (per m2) | task33 | 10 | Sq.Meter |
|---|
| 34 | 34 | DISPOSAL OF MILL REJECTS FROM SILO AND MILL SURROUNDING AREA PER TRIP (by tractor trolley) | task34 | 13800 | TRIP |
|---|
| 35 | 35 | REPLACEMENT OF VENTURY OR VENTURY COLLAR (per mill) | task35 | 12 | No. |
|---|
| 36 | 36 | REPLACEMENT OF INNER CONE (per mill) | task36 | 2 | No. |
|---|
| 37 | 37 | REPLACEMENT/REPAIR OF GEAR BOX OF HOIST FOR MILL MAINTENANCE. (One No.) | task37 | 5 | No. |
|---|
| 38 | 38 | REPLACEMENT/REPAIR OF DRUM OF HOIST FOR MILL MAINTENANCE. (One No.) | task38 | 5 | No. |
|---|
| 39 | 39 | DEPLOYMENT OF HYDRA | task39 | 500 | Hour |
|---|
| 40 | 40 | COMPLETE REFURBISHMENT OF LOWER CHUTE OF COAL FEEDER | task40 | 5 | No. |
|---|
| 41 | 41 | COMPLETE REFURBISHMENT OF MPO/MDV | task41 | 10 | No. |
|---|