Power Government Departments Closing in 0 days TDR #23029684

Various Work Under Deposit Scheme And Other Related Work In The Jurisdiction Of Edsd-Ii , Jattari Under Edd-V , Khair .

Issued by Government Departments · KHAIR, Uttar Pradesh
Tender Value
5 Lakhs
Estimated cost
Bid Submission
31 Dec 2019
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
KHAIR → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Various Work Under Deposit Scheme And Other Related Work In The Jurisdiction Of Edsd-Ii , Jattari Under Edd-V , Khair .-1 Cartage Of Following Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. 3 St Poles 11 Mtr. 4 Cartage Of Line Material Viz Weasal Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 5 Cartage Of Following Materails From Central Store / Other Place To Sites / Location. 6 11 Kv Cable Size 3X120 Mm / 3X70 Sqmm 7 Lt Cable Size 4X16 Mm 8 Carriage Of 11 Kv Metering Pillfe Cubical 9 11 Kv Metering Ct / Pt Pole Mounted Unit 10 Cartage Of Following Transformers:- 11 10 / 16 Kva Transformer 12 25 Kva Transformer 13 63 Kva Transformer 14 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 15 Pcc Poles 8.5 Mtr. 16 St Poles11 Mtr. 17 Erection Of Double Pole Including The Work Of Complete H.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 18 Pcc Poles 8.5 Mtr. 19 St Poles11 Mtr. 20 Tpmo Complete. 21 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work 22 Providing And Fixing Of Stay Insulator. 23 Laying , Sagging, Stringing, Binding And Jumpering Etc. Of Acsr Weasal Conductor Weasel Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 24 Lt Abc 3X120+1X95+1X16 / 3X95+1X70+1X16 / 3X50+1X35+1X16 Sq.Mm Bunch Conductor 25 Providing / Fixing Of Clamps. 26 Laying Of Cable :- 27 Lt Cable Size 4X16 Sq.Mm With Cost Of Lugs / Aluminium Clamp At Both Ends. 28 Laying Of 3X70 Sq. Mm. / 3X120 Mm 11 Kv Xlpe Cable By Conventional Brick Method 1050 M.M. Deep. 29 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 30 Acsr Weasal Conductor / Gi Wire 31 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 32 Grouting Of Following Poles As Per Respo Norms Including Cost Of Grouting Material ( Cement: Sand: Brick Ballast ) Size 1500X450x450 Mm ) . 33 Pcc Poles 8.5 Mtr. 34 St Poles11 Mtr. 35 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour 36 Fabrication Of T-Off Channel As Per Respo Norms. 37 Fabrication Of Top Channel As Per Respo Norms. 38 Fabrication Of Dropper Channel As Per Respo Norms. 39 Fabrication Of T / F Base Channel / Angle As Per Respo Norms. 40 Fabrication Of F Bracket As Per Respo Norms. 41 Fabrication Of V- Type Cross Arm As Per Respo Norms. 42 Fabrication Of Holding Clamp As Per Respo Norms. 43 Fabrication Of Guarding Angle As Per Respo Norms. 44 Replacement Of Following Damaged Accessories:- 45 11 Kv Disc Insulator 46 11 Kv Pin Insulator 47 11 Kv V-Type Cross Arm 48 Chopping Of Tree Branches Which Are Touching To 11 Kv / Lt Lines. 49 Installation Of Extra “T” Off As Per Respo Norms. 50 Installation Of Danger Board With Clamp As Per Respo Norms. 51 Making The Plinth Of St Pole 11 Mtr. 52 Installation And Mounting Of T / F On D / P 53 10 / 16 Kva Transformer 54 25 Kva Transformer 55 63 Kva Transformer 56 Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Carrier Etc. Required For Proper Completion 57 Providing And Fixing Of 3X70 Sq.Mm. / 3X120 Sq.Mm 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Outdoor / Indoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 58 Hoisting Of 11 Kv Cable Outdoor With The Help Of 150Mm G.I. / M.S. Pipe, On Existing Double Pole, Work Includes Jumpering Of P.G. Clamps / Lugs. 59 Safe Carriage Of Old Line Material Viz. Conductor, G.I. Earth Wire, Abc Conductor, Cross Arm, Angle, Channel, Insulators, Clamps & Other Line Material From Any Other Place Or From Site Of Work To Store Centre / J.E. Store Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 60 Safe Carriage Of Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 61 Metering :- 62 Installation And Mounting Of 11 Kv Metering Pilfer As Per Convetional Method. 63 Installation And Mounting Of 11 Kv Metering Outdoor Ct / Pt Unit As Per Convetional Method.

BOQ

Name of Work : Various work under deposit scheme and other related work in the jurisdiction of EDSD-II JATTARI under EDD-V, KHAIR
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).BI01010001010000000000000515BI0100001112
21.01PCC poles 8.5 Mtr.BI01010001010000000000000515BI010000111390Nos.
31.02ST poles 11 Mtr.BI01010001010000000000000515BI01000011148Nos.
42Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).BI01010001010000000000000515BI010000111590Qtl.
53Cartage of following materails from central store/other place to sites/location.BI01010001010000000000000515BI0100001116
63.0111 KV Cable size 3x120 mm/ 3x70 sqmmBI01010001010000000000000515BI010000111750Mtr.
73.02LT Cable size 4x16 mmBI01010001010000000000000515BI010000111830Mtr.
83.03Carriage of 11 KV metering pillfe cubicalBI01010001010000000000000515BI01000011191Nos.
93.0411 KV metering CT/PT pole mounted unitBI01010001010000000000000515BI01000011201Nos.
104Cartage of following Transformers:-BI01010001010000000000000515BI0100001122
114.0110/16 KVA TransformerBI01010001010000000000000515BI01000011212Nos.
124.0225 KVA TransformerBI01010001010000000000000515BI01000011214Nos.
134.0363 KVA TransformerBI01010001010000000000000515BI01000011211Nos.
145Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.BI01010001010000000000000515BI0100001122
155.01PCC poles 8.5 Mtr.BI01010001010000000000000515BI010000112378Nos.
165.02ST poles11 Mtr.BI01010001010000000000000515BI01000011246Nos.
176Erection of double pole including the work of complete H.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.BI01010001010000000000000515BI0100001125
186.01PCC poles 8.5 Mtr.BI01010001010000000000000515BI01000011264Nos.
196.02ST poles11 Mtr.BI01010001010000000000000515BI01000011271Nos.
206.03TPMO Complete.BI01010001010000000000000515BI01000011282Nos.
217.01Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of workBI01010001010000000000000515BI010000112920Nos.
227.02Providing and fixing of stay insulator.BI01010001010000000000000515BI010000113020Nos.
238Laying , sagging, stringing, binding and jumpering etc. of ACSR Weasal Conductor weasel line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.BI01010001010000000000000515BI01000011319600Mtr.
249LT ABC 3x120+1x95+1x16 /3x95+1x70+1x16/ 3x50+1x35+1x16 sq.mm BUNCH CONDUCTORBI01010001010000000000000515BI0100001133150Mtr.
2510Providing/Fixing of clamps.BI01010001010000000000000515BI010000113360Nos.
2611Laying of cable :-BI01010001010000000000000515BI0100001132
2711.01LT Cable size 4x16 Sq.mm with cost of lugs/Aluminium Clamp at both ends.BI01010001010000000000000515BI010000113330Mtr.
2811.02Laying of 3x70 sq. mm./ 3x120 mm 11 KV XLPE cable by conventional brick method 1050 m.m. Deep.BI01010001010000000000000515BI010000113450Mtr.
2912Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.BI01010001010000000000000515BI0100001132
3012.01ACSR Weasal Conductor/ GI WireBI01010001010000000000000515BI0100001133200Mtr.
3113Erection of section Tee pole including fixing of all fittings as per RESPO norms.BI01010001010000000000000515BI01000011334Nos.
3214Grouting of following poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm).BI01010001010000000000000515BI0100001135
3314.01PCC poles 8.5 Mtr.BI01010001010000000000000515BI010000113690Nos.
3414.02ST poles11 Mtr.BI01010001010000000000000515BI01000011378Nos.
3515Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labourBI01010001010000000000000515BI010000113880Nos.
3616Fabrication of T-off Channel as per RESPO Norms.BI01010001010000000000000515BI010000113920Nos.
3717Fabrication of Top Channel as per RESPO Norms.BI01010001010000000000000515BI01000011405Nos.
3818Fabrication of Dropper Channel as per RESPO Norms.BI01010001010000000000000515BI01000011415Nos.
3919Fabrication of T/F Base Channel/Angle as per RESPO Norms.BI01010001010000000000000515BI010000114210Nos.
4020Fabrication of F Bracket as per RESPO Norms.BI01010001010000000000000515BI010000114345Nos.
4121Fabrication of V- type cross arm as per RESPO Norms.BI01010001010000000000000515BI010000114445Nos.
4222Fabrication of Holding Clamp as per RESPO Norms.BI01010001010000000000000515BI010000114540Nos.
4323Fabrication of Guarding Angle as per RESPO Norms.BI01010001010000000000000515BI01000011464Nos.
4424Replacement of following damaged accessories:-BI01010001010000000000000515BI0100001135
4524.0111 KV Disc InsulatorBI01010001010000000000000515BI01000011446Nos.
4624.0211 KV Pin InsulatorBI01010001010000000000000515BI01000011456Nos.
4724.0311 KV V-type Cross ArmBI01010001010000000000000515BI01000011462Nos.
4825Chopping of Tree Branches which are touching to 11 KV/LT lines.BI01010001010000000000000515BI010000114740Nos.
4926Installation of extra “T” off as per RESPO Norms.BI01010001010000000000000515BI01000011487Nos.
5027Installation of Danger Board with clamp as per RESPO Norms.BI01010001010000000000000515BI010000114925Nos.
5128Making the plinth of ST pole 11 Mtr.BI01010001010000000000000515BI01000011508Job
5229Installation and mounting of T/F on D/PBI01010001010000000000000515BI0100001135
5329.0110/16 KVA TransformerBI01010001010000000000000515BI01000011212Nos.
5429.0225 KVA TransformerBI01010001010000000000000515BI01000011214Nos.
5529.0363 KVA TransformerBI01010001010000000000000515BI01000011211Nos.
5630Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completionBI01010001010000000000000515BI010000115280Mtr.
5731Providing and Fixing of 3x70 Sq.mm./3x120 Sq.mm 11 KV XLPE heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.BI01010001010000000000000515BI01000011532Nos.
5832Hoisting of 11 KV cable outdoor with the help of 150mm G.I./M.S. Pipe, on existing double pole, work includes jumpering of P.G. Clamps/Lugs.BI01010001010000000000000515BI01000011542Job
5933Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to store centre/ J.E. Store of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.BI01010001010000000000000515BI01000011541Job
6034Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.BI01010001010000000000000515BI01000011542Nos.
6135Metering :-BI01010001010000000000000515BI0100001155
6235.01Installation and mounting of 11 KV metering pilfer as per convetional method.BI01010001010000000000000515BI01000011561Job
6335.02Installation and mounting of 11 KV metering outdoor CT/PT Unit as per convetional method.BI01010001010000000000000515BI01000011571Job

AI Tender Summary

OUR REF NO 23029684
AUTHORITY Government Departments
TENDER VALUE 5 Lakhs
LAST DATE 31-12-2019
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Various Work Under Deposit Scheme And Other Related Work In The Jurisdiction Of Edsd-Ii , Jattari Under Edd-V , Khair .-1 Cartage Of Following Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. 3 St Poles 11 Mtr. 4 Cartage Of Line Material Viz Weasal Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 5 Cartage Of Following Materails From Central Store / Other Place To Sites / Location. 6 11 Kv Cable Size 3X120 Mm / 3X70 Sqmm 7 Lt Cable Size 4X16 Mm 8 Carriage Of 11 Kv Metering Pillfe Cubical 9 11 Kv Metering Ct / Pt Pole Mounted Unit 10 Cartage Of Following Transformers:- 11 10 / 16 Kva Transformer 12 25 Kva Transformer 13 63 Kva Transformer 14 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 15 Pcc Poles 8.5 Mtr. 16 St Poles11 Mtr. 17 Erection Of Double Pole Including The Work Of Complete H.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 18 Pcc Poles 8.5 Mtr. 19 St Poles11 Mtr. 20 Tpmo Complete. 21 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work 22 Providing And Fixing Of Stay Insulator. 23 Laying , Sagging, Stringing, Binding And Jumpering Etc. Of Acsr Weasal Conductor Weasel Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 24 Lt Abc 3X120+1X95+1X16 / 3X95+1X70+1X16 / 3X50+1X35+1X16 Sq.Mm Bunch Conductor 25 Providing / Fixing Of Clamps. 26 Laying Of Cable :- 27 Lt Cable Size 4X16 Sq.Mm With Cost Of Lugs / Aluminium Clamp At Both Ends. 28 Laying Of 3X70 Sq. Mm. / 3X120 Mm 11 Kv Xlpe Cable By Conventional Brick Method 1050 M.M. Deep. 29 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 30 Acsr Weasal Conductor / Gi Wire 31 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 32 Grouting Of Following Poles As Per Respo Norms Including Cost Of Grouting Material ( Cement: Sand: Brick Ballast ) Size 1500X450x450 Mm ) . 33 Pcc Poles 8.5 Mtr. 34 St Poles11 Mtr. 35 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour 36 Fabrication Of T-Off Channel As Per Respo Norms. 37 Fabrication Of Top Channel As Per Respo Norms. 38 Fabrication Of Dropper Channel As Per Respo Norms. 39 Fabrication Of T / F Base Channel / Angle As Per Respo Norms. 40 Fabrication Of F Bracket As Per Respo Norms. 41 Fabrication Of V- Type Cross Arm As Per Respo Norms. 42 Fabrication Of Holding Clamp As Per Respo Norms. 43 Fabrication Of Guarding Angle As Per Respo Norms. 44 Replacement Of Following Damaged Accessories:- 45 11 Kv Disc Insulator 46 11 Kv Pin Insulator 47 11 Kv V-Type Cross Arm 48 Chopping Of Tree Branches Which Are Touching To 11 Kv / Lt Lines. 49 Installation Of Extra “T” Off As Per Respo Norms. 50 Installation Of Danger Board With Clamp As Per Respo Norms. 51 Making The Plinth Of St Pole 11 Mtr. 52 Installation And Mounting Of T / F On D / P 53 10 / 16 Kva Transformer 54 25 Kva Transformer 55 63 Kva Transformer 56 Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Carrier Etc. Required For Proper Completion 57 Providing And Fixing Of 3X70 Sq.Mm. / 3X120 Sq.Mm 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Outdoor / Indoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 58 Hoisting Of 11 Kv Cable Outdoor With The Help Of 150Mm G.I. / M.S. Pipe, On Existing Double Pole, Work Includes Jumpering Of P.G. Clamps / Lugs. 59 Safe Carriage Of Old Line Material Viz. Conductor, G.I. Earth Wire, Abc Conductor, Cross Arm, Angle, Channel, Insulators, Clamps & Other Line Material From Any Other Place Or From Site Of Work To Store Centre / J.E. Store Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 60 Safe Carriage Of Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 61 Metering :- 62 Installation And Mounting Of 11 Kv Metering Pilfer As Per Convetional Method. 63 Installation And Mounting Of 11 Kv Metering Outdoor Ct / Pt Unit As Per Convetional Method.
Basic Detail
Tender No EDC2A-25/2019-20
Bidding Type Tender
Location
City KHAIR
State Uttar Pradesh
Key Dates
Publish Date 25 Dec 2019
Submission Date 31 Dec 2019
Open Date 03 Jan 2020
Finance
Tender Value 5 Lakhs
Tender Fee 1000
EMD 5000
Exemption Not Available
Document List
1DD94053-4A38-4B26-BAF3-63D7ED3022A2.html
Doc25.pdf
Tendernotice_1.pdf
BOQ_608091.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 25, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 31, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 03, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1DD94053-4A38-4B26-BAF3-63D7ED3022A2.html

pdf

Doc25.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_608091.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders