Various Work Under Deposit Scheme And Other Related Work In The Jurisdiction Of Edsd-Ii , Jattari Under Edd-V , Khair .
Tender Overview
Project Description
Various Work Under Deposit Scheme And Other Related Work In The Jurisdiction Of Edsd-Ii , Jattari Under Edd-V , Khair .-1 Cartage Of Following Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. 3 St Poles 11 Mtr. 4 Cartage Of Line Material Viz Weasal Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 5 Cartage Of Following Materails From Central Store / Other Place To Sites / Location. 6 11 Kv Cable Size 3X120 Mm / 3X70 Sqmm 7 Lt Cable Size 4X16 Mm 8 Carriage Of 11 Kv Metering Pillfe Cubical 9 11 Kv Metering Ct / Pt Pole Mounted Unit 10 Cartage Of Following Transformers:- 11 10 / 16 Kva Transformer 12 25 Kva Transformer 13 63 Kva Transformer 14 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 15 Pcc Poles 8.5 Mtr. 16 St Poles11 Mtr. 17 Erection Of Double Pole Including The Work Of Complete H.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 18 Pcc Poles 8.5 Mtr. 19 St Poles11 Mtr. 20 Tpmo Complete. 21 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work 22 Providing And Fixing Of Stay Insulator. 23 Laying , Sagging, Stringing, Binding And Jumpering Etc. Of Acsr Weasal Conductor Weasel Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 24 Lt Abc 3X120+1X95+1X16 / 3X95+1X70+1X16 / 3X50+1X35+1X16 Sq.Mm Bunch Conductor 25 Providing / Fixing Of Clamps. 26 Laying Of Cable :- 27 Lt Cable Size 4X16 Sq.Mm With Cost Of Lugs / Aluminium Clamp At Both Ends. 28 Laying Of 3X70 Sq. Mm. / 3X120 Mm 11 Kv Xlpe Cable By Conventional Brick Method 1050 M.M. Deep. 29 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 30 Acsr Weasal Conductor / Gi Wire 31 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 32 Grouting Of Following Poles As Per Respo Norms Including Cost Of Grouting Material ( Cement: Sand: Brick Ballast ) Size 1500X450x450 Mm ) . 33 Pcc Poles 8.5 Mtr. 34 St Poles11 Mtr. 35 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour 36 Fabrication Of T-Off Channel As Per Respo Norms. 37 Fabrication Of Top Channel As Per Respo Norms. 38 Fabrication Of Dropper Channel As Per Respo Norms. 39 Fabrication Of T / F Base Channel / Angle As Per Respo Norms. 40 Fabrication Of F Bracket As Per Respo Norms. 41 Fabrication Of V- Type Cross Arm As Per Respo Norms. 42 Fabrication Of Holding Clamp As Per Respo Norms. 43 Fabrication Of Guarding Angle As Per Respo Norms. 44 Replacement Of Following Damaged Accessories:- 45 11 Kv Disc Insulator 46 11 Kv Pin Insulator 47 11 Kv V-Type Cross Arm 48 Chopping Of Tree Branches Which Are Touching To 11 Kv / Lt Lines. 49 Installation Of Extra “T” Off As Per Respo Norms. 50 Installation Of Danger Board With Clamp As Per Respo Norms. 51 Making The Plinth Of St Pole 11 Mtr. 52 Installation And Mounting Of T / F On D / P 53 10 / 16 Kva Transformer 54 25 Kva Transformer 55 63 Kva Transformer 56 Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Carrier Etc. Required For Proper Completion 57 Providing And Fixing Of 3X70 Sq.Mm. / 3X120 Sq.Mm 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Outdoor / Indoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 58 Hoisting Of 11 Kv Cable Outdoor With The Help Of 150Mm G.I. / M.S. Pipe, On Existing Double Pole, Work Includes Jumpering Of P.G. Clamps / Lugs. 59 Safe Carriage Of Old Line Material Viz. Conductor, G.I. Earth Wire, Abc Conductor, Cross Arm, Angle, Channel, Insulators, Clamps & Other Line Material From Any Other Place Or From Site Of Work To Store Centre / J.E. Store Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 60 Safe Carriage Of Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 61 Metering :- 62 Installation And Mounting Of 11 Kv Metering Pilfer As Per Convetional Method. 63 Installation And Mounting Of 11 Kv Metering Outdoor Ct / Pt Unit As Per Convetional Method.
BOQ
| Name of Work : Various work under deposit scheme and other related work in the jurisdiction of EDSD-II JATTARI under EDD-V, KHAIR | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001113 | 90 | Nos. |
| 3 | 1.02 | ST poles 11 Mtr. | BI01010001010000000000000515BI0100001114 | 8 | Nos. |
| 4 | 2 | Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001115 | 90 | Qtl. |
| 5 | 3 | Cartage of following materails from central store/other place to sites/location. | BI01010001010000000000000515BI0100001116 | ||
| 6 | 3.01 | 11 KV Cable size 3x120 mm/ 3x70 sqmm | BI01010001010000000000000515BI0100001117 | 50 | Mtr. |
| 7 | 3.02 | LT Cable size 4x16 mm | BI01010001010000000000000515BI0100001118 | 30 | Mtr. |
| 8 | 3.03 | Carriage of 11 KV metering pillfe cubical | BI01010001010000000000000515BI0100001119 | 1 | Nos. |
| 9 | 3.04 | 11 KV metering CT/PT pole mounted unit | BI01010001010000000000000515BI0100001120 | 1 | Nos. |
| 10 | 4 | Cartage of following Transformers:- | BI01010001010000000000000515BI0100001122 | ||
| 11 | 4.01 | 10/16 KVA Transformer | BI01010001010000000000000515BI0100001121 | 2 | Nos. |
| 12 | 4.02 | 25 KVA Transformer | BI01010001010000000000000515BI0100001121 | 4 | Nos. |
| 13 | 4.03 | 63 KVA Transformer | BI01010001010000000000000515BI0100001121 | 1 | Nos. |
| 14 | 5 | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001122 | ||
| 15 | 5.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001123 | 78 | Nos. |
| 16 | 5.02 | ST poles11 Mtr. | BI01010001010000000000000515BI0100001124 | 6 | Nos. |
| 17 | 6 | Erection of double pole including the work of complete H.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001125 | ||
| 18 | 6.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001126 | 4 | Nos. |
| 19 | 6.02 | ST poles11 Mtr. | BI01010001010000000000000515BI0100001127 | 1 | Nos. |
| 20 | 6.03 | TPMO Complete. | BI01010001010000000000000515BI0100001128 | 2 | Nos. |
| 21 | 7.01 | Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work | BI01010001010000000000000515BI0100001129 | 20 | Nos. |
| 22 | 7.02 | Providing and fixing of stay insulator. | BI01010001010000000000000515BI0100001130 | 20 | Nos. |
| 23 | 8 | Laying , sagging, stringing, binding and jumpering etc. of ACSR Weasal Conductor weasel line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001131 | 9600 | Mtr. |
| 24 | 9 | LT ABC 3x120+1x95+1x16 /3x95+1x70+1x16/ 3x50+1x35+1x16 sq.mm BUNCH CONDUCTOR | BI01010001010000000000000515BI0100001133 | 150 | Mtr. |
| 25 | 10 | Providing/Fixing of clamps. | BI01010001010000000000000515BI0100001133 | 60 | Nos. |
| 26 | 11 | Laying of cable :- | BI01010001010000000000000515BI0100001132 | ||
| 27 | 11.01 | LT Cable size 4x16 Sq.mm with cost of lugs/Aluminium Clamp at both ends. | BI01010001010000000000000515BI0100001133 | 30 | Mtr. |
| 28 | 11.02 | Laying of 3x70 sq. mm./ 3x120 mm 11 KV XLPE cable by conventional brick method 1050 m.m. Deep. | BI01010001010000000000000515BI0100001134 | 50 | Mtr. |
| 29 | 12 | Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001132 | ||
| 30 | 12.01 | ACSR Weasal Conductor/ GI Wire | BI01010001010000000000000515BI0100001133 | 200 | Mtr. |
| 31 | 13 | Erection of section Tee pole including fixing of all fittings as per RESPO norms. | BI01010001010000000000000515BI0100001133 | 4 | Nos. |
| 32 | 14 | Grouting of following poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm). | BI01010001010000000000000515BI0100001135 | ||
| 33 | 14.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001136 | 90 | Nos. |
| 34 | 14.02 | ST poles11 Mtr. | BI01010001010000000000000515BI0100001137 | 8 | Nos. |
| 35 | 15 | Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour | BI01010001010000000000000515BI0100001138 | 80 | Nos. |
| 36 | 16 | Fabrication of T-off Channel as per RESPO Norms. | BI01010001010000000000000515BI0100001139 | 20 | Nos. |
| 37 | 17 | Fabrication of Top Channel as per RESPO Norms. | BI01010001010000000000000515BI0100001140 | 5 | Nos. |
| 38 | 18 | Fabrication of Dropper Channel as per RESPO Norms. | BI01010001010000000000000515BI0100001141 | 5 | Nos. |
| 39 | 19 | Fabrication of T/F Base Channel/Angle as per RESPO Norms. | BI01010001010000000000000515BI0100001142 | 10 | Nos. |
| 40 | 20 | Fabrication of F Bracket as per RESPO Norms. | BI01010001010000000000000515BI0100001143 | 45 | Nos. |
| 41 | 21 | Fabrication of V- type cross arm as per RESPO Norms. | BI01010001010000000000000515BI0100001144 | 45 | Nos. |
| 42 | 22 | Fabrication of Holding Clamp as per RESPO Norms. | BI01010001010000000000000515BI0100001145 | 40 | Nos. |
| 43 | 23 | Fabrication of Guarding Angle as per RESPO Norms. | BI01010001010000000000000515BI0100001146 | 4 | Nos. |
| 44 | 24 | Replacement of following damaged accessories:- | BI01010001010000000000000515BI0100001135 | ||
| 45 | 24.01 | 11 KV Disc Insulator | BI01010001010000000000000515BI0100001144 | 6 | Nos. |
| 46 | 24.02 | 11 KV Pin Insulator | BI01010001010000000000000515BI0100001145 | 6 | Nos. |
| 47 | 24.03 | 11 KV V-type Cross Arm | BI01010001010000000000000515BI0100001146 | 2 | Nos. |
| 48 | 25 | Chopping of Tree Branches which are touching to 11 KV/LT lines. | BI01010001010000000000000515BI0100001147 | 40 | Nos. |
| 49 | 26 | Installation of extra “T” off as per RESPO Norms. | BI01010001010000000000000515BI0100001148 | 7 | Nos. |
| 50 | 27 | Installation of Danger Board with clamp as per RESPO Norms. | BI01010001010000000000000515BI0100001149 | 25 | Nos. |
| 51 | 28 | Making the plinth of ST pole 11 Mtr. | BI01010001010000000000000515BI0100001150 | 8 | Job |
| 52 | 29 | Installation and mounting of T/F on D/P | BI01010001010000000000000515BI0100001135 | ||
| 53 | 29.01 | 10/16 KVA Transformer | BI01010001010000000000000515BI0100001121 | 2 | Nos. |
| 54 | 29.02 | 25 KVA Transformer | BI01010001010000000000000515BI0100001121 | 4 | Nos. |
| 55 | 29.03 | 63 KVA Transformer | BI01010001010000000000000515BI0100001121 | 1 | Nos. |
| 56 | 30 | Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completion | BI01010001010000000000000515BI0100001152 | 80 | Mtr. |
| 57 | 31 | Providing and Fixing of 3x70 Sq.mm./3x120 Sq.mm 11 KV XLPE heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work. | BI01010001010000000000000515BI0100001153 | 2 | Nos. |
| 58 | 32 | Hoisting of 11 KV cable outdoor with the help of 150mm G.I./M.S. Pipe, on existing double pole, work includes jumpering of P.G. Clamps/Lugs. | BI01010001010000000000000515BI0100001154 | 2 | Job |
| 59 | 33 | Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to store centre/ J.E. Store of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001154 | 1 | Job |
| 60 | 34 | Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms. | BI01010001010000000000000515BI0100001154 | 2 | Nos. |
| 61 | 35 | Metering :- | BI01010001010000000000000515BI0100001155 | ||
| 62 | 35.01 | Installation and mounting of 11 KV metering pilfer as per convetional method. | BI01010001010000000000000515BI0100001156 | 1 | Job |
| 63 | 35.02 | Installation and mounting of 11 KV metering outdoor CT/PT Unit as per convetional method. | BI01010001010000000000000515BI0100001157 | 1 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.