| 1 | 1 | Dismantling the shutter and hoist unit ,chipping concreting the groove and convey the scrap materials to nearest custodian office . Cost includes of labors, hire charge of tools , conveyance, loading and unloading charges etc. complete | | | |
|---|
| 2 | 1.01 | od42174/2018_2019/MH : Dismantling and removing the existing canal shutter &hoist unit and convey the scrap materials to nearest custodian office . Cost includes of labors, hire charge of tools , conveyance, loading and unloading charges etc. complete | BI01010001010000000000000515BI0100001114 | 4 | set |
|---|
| 3 | 1.02 | 15.1 : Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charges. | BI01010001010000000000000515BI0100001115 | 2.735 | cum |
|---|
| 4 | 1.03 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001116 | 25.517 | sqm |
|---|
| 5 | 1.04 | 4.4.1 : Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing.1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001117 | 2.735 | cum |
|---|
| 6 | 1.05 | 13.9.2 : Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster | BI01010001010000000000000515BI0100001118 | 25.517 | sqm |
|---|
| 7 | 2 | Supply , Fabrication of MS material for Embeded parts , cost includes cost of material | BI01010001010000000000000515BI0100001119 | | |
|---|
| 8 | 2.01 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001120 | 508.415 | kg |
|---|
| 9 | 2.02 | 85.107 : Supply of MS round bar including cost of conveyance charges | BI01010001010000000000000515BI0100001121 | 53.4 | kg |
|---|
| 10 | 2.03 | od42483/2018_2019/MH : Fabrication, erection and commissioning of Structural steel Embedded parts in IS2062 Grade and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour , machinery , incidental and handling charges etc complete but excluding cost of material already supplied | BI01010001010000000000000515BI0100001122 | 561.815 | kg |
|---|
| 11 | 3 | Supply of materials, fabrication,painting and erection of MS shutter | BI01010001010000000000000515BI0100001123 | | |
|---|
| 12 | 3.01 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001124 | 406.024 | kg |
|---|
| 13 | 3.02 | 85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges | BI01010001010000000000000515BI0100001125 | 323.148 | kg |
|---|
| 14 | 3.03 | 85.107 : Supply of MS round bar including cost of conveyance charges | BI01010001010000000000000515BI0100001126 | 50.853 | kg |
|---|
| 15 | 3.04 | od29777/2019_2020/MH : Fabrication and supply of Structural steel wheel gate and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied | BI01010001010000000000000515BI0100001127 | 780.025 | kg |
|---|
| 16 | 4 | Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint | | | |
|---|
| 17 | 4.01 | 85.114 : Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | BI01010001010000000000000515BI0100001129 | 24.965 | sqm |
|---|
| 18 | 5 | Erection of the shutters safely in the grooves , assembling and aligning | BI01010001010000000000000515BI0100001130 | | |
|---|
| 19 | 5.01 | od29781/2019_2020/MH : Erection of the shutters safely in the grooves , assembling and aligning including cost of all machinery, labour all incidental and conveyance charges etc complete as per direction ofdepartmental officer at site | BI01010001010000000000000515BI0100001131 | 12 | no |
|---|
| 20 | 6 | Supplying and fixing of flat type rubber seal at the bottom side , angular type at vertical side of tyhe shutter | | | |
|---|
| 21 | 6.01 | 85.116 : Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing | BI01010001010000000000000515BI0100001133 | 5.87 | metre |
|---|
| 22 | 6.02 | 85.117 : Supplying and fixing in correct position with specified initial interface the Angular type rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings | BI01010001010000000000000515BI0100001134 | 18 | metre |
|---|
| 23 | 7 | Supply of materials, fabrication,painting and erection of hoisting bridge and hoist units, screw rod for shutter | | | |
|---|
| 24 | 7.01 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001136 | 987.216 | kg |
|---|
| 25 | 7.02 | 85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges | BI01010001010000000000000515BI0100001137 | 1399.68 | kg |
|---|
| 26 | 7.03 | od30190/2019_2020/MH : Supply of MS Bolts and Nuts | BI01010001010000000000000515BI0100001138 | 45.447 | per kg |
|---|
| 27 | 7.04 | od30191/2019_2020/MH : Fabrication and supply of Hoisting Girder in structural steel confirming to IS2062Gr as per approved specifications and directions of deptl officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied. | BI01010001010000000000000515BI0100001139 | 2386.9 | kg |
|---|
| 28 | 8 | Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning | | | |
|---|
| 29 | 8.01 | 85.115 : Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | BI01010001010000000000000515BI0100001141 | 60.48 | sqm |
|---|
| 30 | 9 | :Providing base and nut arrangement for hoisting the shutter. including cost of all materials labour hire charges of machinery, industrial charges etc complete | | | |
|---|
| 31 | 9.01 | od31965/2019_2020/MH : :Providing base and nut arrangement for hoisting the shutter. including cost of allmaterials labour hire charges of machinery, industrial charges etc complete. | BI01010001010000000000000515BI0100001143 | 12 | set |
|---|
| 32 | 10 | Supply of EN -8 shaft having 67mm outer dia for Screw rod | BI01010001010000000000000515BI0100001144 | | |
|---|
| 33 | 10.01 | od30197/2019_2020/MH : Supply of EN -8 shaft having 67mm outer dia for Screw rod | BI01010001010000000000000515BI0100001145 | 26.401 | metre |
|---|
| 34 | 11 | Machining of shaft 67mm outer dia to 63mm dia, head pitch of 12.7 mm root dia 50.3 mm using EN -8 shaft | | | |
|---|
| 35 | 11.01 | od30198/2019_2020/MH : Machining of shaft 63mm outer dia , head pitch of 12.7 mm root dia 50.3 mm using EN -8 shaft Including cost of all material, labour,tools etc. complete. | BI01010001010000000000000515BI0100001147 | 24 | metre |
|---|
| 36 | 12 | Erection of the hoisting bridge and units including Screw rod, base and nut etc | BI01010001010000000000000515BI0100001148 | | |
|---|
| 37 | 12.01 | od30199/2019_2020/MH : Erection of the hoisting bridge and units including Screw rod, base and nutetc. in correct alignment and anchoring the bridge etc. properly including cost of all labour,machinery, lead and lifts charges etc complete.but excluding cost of materials | BI01010001010000000000000515BI0100001149 | 12 | set |
|---|