Construction Of Ramp At Thalook Hospital Building
Tender Value
12.94 Lakhs
Estimated cost
Bid Submission
10 Jan 2020
0 days left
EMD
32370
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
VARKALA → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Ramp At Thalook Hospital Building
BOQ
| Work Name:168/20. Construction of ramp at Taluk Hospital Varkala | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Building Work | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.001 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001114 | 24.192 | cum |
| 3 | 1.002 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001115 | 3.024 | cum |
| 4 | 1.003 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | BI01010001010000000000000515BI0100001116 | 11.201 | sqm |
| 5 | 1.004 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | BI01010001010000000000000515BI0100001117 | 100.688 | sqm |
| 6 | 1.005 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | BI01010001010000000000000515BI0100001118 | 138.406 | sqm |
| 7 | 1.006 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | BI01010001010000000000000515BI0100001119 | 132.364 | sqm |
| 8 | 1.007 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | BI01010001010000000000000515BI0100001120 | 4.738 | cum |
| 9 | 1.008 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001121 | 10.221 | cum |
| 10 | 1.009 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | BI01010001010000000000000515BI0100001122 | 24.78 | cum |
| 11 | 1.01 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001123 | 4618.17 | kilogram |
| 12 | 1.011 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | BI01010001010000000000000515BI0100001124 | 17.1 | cum |
| 13 | 1.012 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001125 | 288.558 | sqm |
| 14 | 1.013 | 13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | BI01010001010000000000000515BI0100001126 | 288.558 | sqm |
| 15 | 1.014 | 13.44.1 : Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm) | BI01010001010000000000000515BI0100001127 | 288.558 | sqm |
| 16 | 1.015 | 51.18.12.5 : Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) External work - 40 mm nominal dia | BI01010001010000000000000515BI0100001128 | 310 | metre |
| 17 | 1.016 | 13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | BI01010001010000000000000515BI0100001129 | 20.41 | sqm |
| 18 | 1.017 | 16.68 : Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001130 | 95 | sqm |
| 19 | 1.018 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | BI01010001010000000000000515BI0100001131 | 9.5 | cum |
AI Tender Summary
Tender Timeline
Dec 24, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedJan 10, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 14, 2020
Bid Opening Date
Technical bids will be opened and evaluated.