| 1 | 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation not exceeding 1,500 mm.. | Item1 | 70.83 | % cum |
|---|
| 2 | 2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | Item2 | 9.04 | % cum |
|---|
| 3 | 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | Item3 | 90.14 | sqm. |
|---|
| 4 | 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.Pakur Variety | Item4 | 5.5 | Cum |
|---|
| 5 | 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety | Item5 | 47.06 | Cum |
|---|
| 6 | 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs,beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).25 mm to 30 mm shuttering without staging in foundation. | Item6 | 400.77 | sqm. |
|---|
| 7 | 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor/upto 4 m. Tor steel/Mild Steel. Other than SAIL/ TATA/RINL. | Item7 | 4.43 | M.T. |
|---|
| 8 | 8 | 125 mm. thick brick work with 1st class bricks in cement mortar. (1:4) inground floor. | Item8 | 281.11 | sqm. |
|---|
| 9 | 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 15 mm thick plaster | Item9 | 923.81 | sqm. |
|---|
| 10 | 10 | Neat cement punning about 1.5mm thick in wall, dado, Window sill, floor etc. | Item10 | 103.16 | sqm. |
|---|
| 11 | 11 | Applying decorative cement based paint of approved quality afterpreparing the surface including scraping the same thoroughly(plastered or concrete surface) as per manufacturer's specification.One coat on new surface. | Item11 | 931.15 | Sqm. |
|---|
| 12 | 12 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receivedecorative textured (matt finish) or smooth finish acrylic exterioremulsion paint including scraping and preparing the surface per manufacturer's specification and as per direction of the EIC.throughly,complete as In Ground Floor: One Coat | Item12 | 931.15 | % Sqm |
|---|
| 13 | 13 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidentalharges but excluding the cost of primer.In Ground floor (Two Coat)Normal Acrylic Emulsion | Item13 | 931.15 | Sqm. |
|---|
| 14 | 14 | M.S. structural works in columns, beams, etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6) - 1964 connected to one another with bracket, gussets, cleans as per design, direction of Engineering-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816-1969 & IS: 1995 using electrodes of approved make and brand conforming to IS: 814-2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc.. For structural members of specified sections weighing less than 22.5 Kg./mtr. Angle 40x40x5mm - | Item14 | 0.61 | M.T. |
|---|
| 15 | 15 | Supplying fitting and fixing galvanised 3 ply 12 gauge ' 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples, tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples, straining bolt and binding wire where necessary. | Item15 | 165 | %Mtr. |
|---|
| 16 | 16 | Supplying fitting and fixing (+/_ 30mm) diametre R.B.T.(Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approximately 6 meters length at site clipped with two nos. of horizontal R.B.T. Strands which will be tensioned and fixed with the vertical M.S. angle iron posts by means of security (such as 'C' clips, R.B.T. clips etc.) | Item16 | 165 | Mtr. |
|---|
| 17 | 17 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).With earth obtained from excavation of foundation | Item17 | 14.18 | % cum |
|---|
| 18 | 18 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sandpapering etc. | Item18 | 15 | Sqm. |
|---|
| 19 | 19 | Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary : On steel or other metal surface With super gloss (hi-gloss) -Two coats (with any shade except white) | Item19 | 15 | Sqm. |
|---|
| 20 | 20 | M. S. gate of jail type as per approved design made of strong M.S. frame work, intermediate stiffeners and round/square bars or angles. M.S. sheet (not less than 14 gauge), gussets , cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in-charge. in ground floor. | Item20 | 10 | Qntl |
|---|
| 21 | 21 | Providing & fixing Concrete Sign Board as per IRC specification of size 900x750x37mm thick made with RCC 1:1.5:3 with pakur variety stone chips reinforced with double layer ISC febric (75 x 75 mmmesh) and fixed with necessary nuts & bolts on two RC precast posts 100mm x 150mm of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 meter above GL & .75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of Engineer-in-Charge. (The rate is iclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) | Item21 | 2 | Each |
|---|