Ase - Maintenance Of Avikkal Kuriyadi Seawall From 46M South Of Cp 2067 Towards South For A Lengf 44M In Vatakara Municipality Ase - Maintenance Of Avikkal Kuriyadi Seawall From 46M South Of Cp 2067 Towards South For A Length Of 44M In Vatakara Mu
Tender Overview
Project Description
Ase - Maintenance Of Avikkal Kuriyadi Seawall From 46M South Of Cp 2067 Towards South For A Lengf 44M In Vatakara Municipality Ase - Maintenance Of Avikkal Kuriyadi Seawall From 46M South Of Cp 2067 Towards South For A Length Of 44M In Vatakara Municipality
BOQ
| Work Name: ASE - Maintenance of Avikkal Kuriyadi seawall from 46m south of CP 2067 towards south for a length of 44m in Vatakara Municipality | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | detailed estimate | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 60.34.7 : A.S.E Reformation work- Calicut -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement. | BI01010001010000000000000515BI0100001114 | 33 | cum |
| 3 | 1.02 | 60.36.7 : A.S.E Reformation work- Calicut -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement. | BI01010001010000000000000515BI0100001115 | 50 | cum |
| 4 | 1.03 | 60.40.7 : A.S.E -Reformation work- Calicut-\nSupplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete . | BI01010001010000000000000515BI0100001116 | 1985 | each |
| 5 | 1.04 | 60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site. | BI01010001010000000000000515BI0100001117 | 33 | cum |
| 6 | 1.05 | 60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site. | BI01010001010000000000000515BI0100001118 | 50 | cum |
| 7 | 1.06 | 60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton) | BI01010001010000000000000515BI0100001119 | 1569 | each |
| 8 | 1.07 | 60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton) | BI01010001010000000000000515BI0100001120 | 416 | no |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender