| 1 | 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | | 1820 | SQM |
|---|
| 2 | 2 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) \na)80 mm Metal, By breaking Boulders (Hand broken). | | 163.8 | CUM |
|---|
| 3 | 3 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)\n(a)40 mm Metal, By breaking Boulders (Hand broken). | | 81.9 | CUM |
|---|
| 4 | 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | | 136.5 | CUM |
|---|
| 5 | 5 | Supplying soft murum at the road site, including conveying and stacking complete. | | 27.3 | CUM |
|---|
| 6 | 6 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | | 245.7 | cum |
|---|
| 7 | 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | | 163.8 | CUM |
|---|
| 8 | 8 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. | | 546 | SQ.M |
|---|
| 9 | 9 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | | 819 | SQM |
|---|
| 10 | 10 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | | 819 | SQM |
|---|
| 11 | 11 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | | 409.5 | CUM |
|---|
| 12 | 12 | Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | | 819 | SQ.M |
|---|
| 13 | 13 | Providing and Laying 20 mm thick premix bituminous carpet including supplying all materials preparing and cleaning the base, heating bitumen applying tack coat at 151kg./100 Sq.M. rate mixing hot bitumen and chips , laying carpet layer and compacting with static roller of 8 to 10 MT complete includin..etc... | | 819 | SQ.M |
|---|
| 14 | 14 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials & bitumen of VG-30 grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc...etc... | | 819 | sqm |
|---|
| 15 | 15 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. VG-30 bulk bitumen | | 819 | sqm |
|---|
| 16 | 16 | Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. | | 1 | no |
|---|
| 17 | 18 | metal 40mm/80mm | | 2 | no |
|---|
| 18 | 19 | Asphalt | | 1 | no |
|---|
| 19 | 20 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges of Rs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. | | 461.1 | CUM |
|---|