| 1 | 1 | ROAD AND DRAIN | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001114 | 120.49 | cum |
|---|
| 3 | 1.002 | od211204/2019_2020 : od100550/2019_2020 :4.1.8 Providing and laying in position cement concrete of specified grade excluding<br>the cost of centering and shuttering - All work up to plinth level:<br>1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001115 | 40.368 | cum |
|---|
| 4 | 1.003 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001116 | 519.8 | sqm |
|---|
| 5 | 1.004 | od211209/2019_2020 : od100551/2019_2020 :4.1.6 Providing and laying in position cement concrete of specified grade excluding<br>the cost of centering and shuttering - All work up to plinth level:<br>1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)<br> | BI01010001010000000000000515BI0100001117 | 90.965 | cum |
|---|
| 6 | 1.005 | od211211/2019_2020 : od100549/2019_2020 :13.16.1 6 mm cement plaster of mix: 1:3 ( 1 cement : 3 fine sand) | BI01010001010000000000000515BI0100001118 | 322.2 | sqm |
|---|
| 7 | 1.006 | od211214/2019_2020 : od100548/2019_2020 :5.12 Providing, hoisting and fixing up to floor level precast reinforced cement concrete<br>work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including<br>the cost of required centering, shuttering but excluding cost of reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001119 | 11.48 | cum |
|---|
| 8 | 1.007 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001120 | 746.2 | kilogram |
|---|
| 9 | 1.008 | od289174/2019_2020 : od100546/2019_2020 :50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides<br>of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming<br>and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge<br> | BI01010001010000000000000515BI0100001121 | 20.87 | cum |
|---|
| 10 | 1.009 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | BI01010001010000000000000515BI0100001122 | 3.3 | cum |
|---|
| 11 | 1.01 | od211295/2019_2020 : od100554/2019_2020 :4.1.3 Providing and laying in position cement concrete of specified grade excluding<br>the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded<br>stone aggregate 20 mm nominal size)<br> | BI01010001010000000000000515BI0100001123 | 4.382 | cum |
|---|
| 12 | 1.011 | od289211/2019_2020 : Man coolies for removing /replacing and placing slabs and struts in position / for cutting and removing over hanging branches of trees and clearing waste materials and clearing small & thick vegetation by the side of thodu<br> provided | BI01010001010000000000000515BI0100001124 | 6 | each |
|---|