| 1 | 1 | Road Work | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | od30088/2019_2020 : Taking out existing CC interlocking paver blocks including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | BI01010001010000000000000515BI0100001114 | 1000 | sqm |
|---|
| 3 | 1.02 | 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | BI01010001010000000000000515BI0100001115 | 150 | cum |
|---|
| 4 | 1.03 | 4.1.B.2 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br>\nGrading-VI - For sub base cum drainage layer - Mix in Place Method<br>Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub base cum drainage layer - Mix in Place Method | BI01010001010000000000000515BI0100001116 | 100 | cum |
|---|
| 5 | 1.04 | 4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | BI01010001010000000000000515BI0100001117 | 150 | cum |
|---|
| 6 | 1.05 | 5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | BI01010001010000000000000515BI0100001118 | 1000 | sqm |
|---|
| 7 | 1.06 | od30090/2019_2020 : Supplying and stacking 24mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001119 | 32 | cum |
|---|
| 8 | 1.07 | 55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001120 | 22 | cum |
|---|
| 9 | 1.08 | 55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001121 | 9 | cum |
|---|
| 10 | 1.09 | od30089/2019_2020 : Providing 40mm premixed chipping carpet over BT surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brooms and appying a priming coat of hot bitumen @ 2.50 Kg/ 10 m2 and spreading the hot premix of 0.32 m3 of 24mm, 0.22 m3 of 12mm departmental metal\rmixed with 22.08 Kg of bitumen per 10m2, rolling to dense surface, then spreading the seat coat comprising 0.09m3 of 6mm metal mixed with 8.64 Kg of of bitumen per 10m2 and rolling again including cost of bitumen, fuel, hire charges machineries etc complete (Total usage of bitumen 33.22 Kg per 10 m2) (IRC 3.4.2) | BI01010001010000000000000515BI0100001122 | 1000 | sqm |
|---|