Tp-086/2019-20 Ewe , Stub Setting , Transporting , Erection Of Tower , Stringing Of Panther Conductor 6Nos . And Gi Earth Wire 7/3 . 55Mm 1No . For Making Lilo Of The Existing Arani-Kaveripakkam 110 Kv Feeder At The Proposed Kalavai 110/33-11 Kv Ss
Tender Overview
Project Description
Tp-086/2019-20 Ewe , Stub Setting , Transporting , Erection Of Tower , Stringing Of Panther Conductor 6Nos . And Gi Earth Wire 7/3 . 55Mm 1No . For Making Lilo Of The Existing Arani-Kaveripakkam 110 Kv Feeder At The Proposed Kalavai 110/33-11 Kv Ss ( Loc . 1-34 )
BOQ
| Name of work :Earth work excavation, Stub setting, Transporting & Erection of tower, Stringing of Panther conductor 6 Nos. and GI earth wire 7/3.55mm 1 No. for making LILO of the existing Aarani - Kaveripakkam 110 KV feeder at the proposed Kalavai 110/33-11 KV SS | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Check surveying and pit marking including hire charges for T & P all labour charges, lead, lift, etc., complete. | item1 | 34 | Loc. |
| 2 | 2 | Clearing of light jungle between tower location | item2 | 17000 | m2 |
| 3 | 3 | Earth work excavation for depositing on bank for tower foundation with initial lead, in all class of soil etc., complete., for Hard Gravelly soil | item3 | 1611 | m3 |
| 4 | 4 | Earth work excavation in soft disintegrated rock for foundation not requiring blasting | item4 | 537 | m3 |
| 5 | 5 | Earth work excavation in medium and dense medium rock not requiring blasting for foundation | item5 | 269 | m3 |
| 6 | 6 | Earth work excavation in Hard rock requiring Control blasting for foundation | item6 | 269 | m3 |
| 7 | 7 | Labour charges for Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For GCR tower | item7 | 15 | Loc. |
| 8 | 8 | Labour charges for Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For HCR tower | item8 | 10 | Loc. |
| 9 | 9 | Labour charges for Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete., For KCR tower | item9 | 9 | Loc. |
| 10 | 10 | PCC 1:3:6, using 20mm HBG metal for foundation without form work including cost of cement all materials, labour, lead, lift, etc., complete. | item10 | 51 | m3 |
| 11 | 11 | PCC 1:2:4 using 12 to 20mm HBG metal for foundation with steel form work including cost of cement all materials labour etc., complete.,for Chimney and frustum concrete. | item11 | 433 | m3 |
| 12 | 12 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete. | item12 | 2201 | m3 |
| 13 | 13 | Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and transporting charges etc., complete. | item13 | 485 | m3 |
| 14 | 14 | Providing muffing copping with PCC 1:2:4 using 12-20mm HBG metal with form work including cost of cement all materials, labour, lead, lift, etc., complete. | item14 | 10 | m3 |
| 15 | 15 | Providing pipe type earthing using earth pipe and GI earth wire supplied including all labour and cost of earth pipe, etc., complete | item15 | 34 | Loc. |
| 16 | 16 | Providing special earthing arrangements for Terminal tower including necessary excavation for fixing 3m long 50mm dia GI \"B\" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip including all cost of materials lead lift etc complete. | item16 | 1 | Loc. |
| 17 | 17 | Plastering with C.M 1:3 12mm thick including cost of cement, all materials labour etc., complete. | item17 | 110 | m2 |
| 18 | 18 | Labour charges for Transport & Erection of tower including shorting out of tower parts at site, unloading at site,tighting and punching of bolts, nuts for final checking, including all lead lift labour etc. complete. | item18 | 149 | MT |
| 19 | 19 | Labour charges for Hoisting of single unit of Disc 7 nos of 110KV 90 KN insulator with fixing of single suspension fittings including cost of hardware fittings, labour, lead, lift etc., complete. (90 KN Insulator supply by Board) | item19 | 125 | sets |
| 20 | 20 | Labour charges for Hoisting of single unit of Disc 8 nos of 110KV 120 KN insulator with fixing of single tension fittings including cost of hardware fittings, labour, lead, lift etc., complete. (120 KN Insulator supply by Board) | item20 | 236 | sets |
| 21 | 21 | Providing trussel for High way Road crossings and Telephone lines during paying out, rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labour etc., complete. | item21 | 12 | Nos |
| 22 | 22 | Providing temporary stays during rough sagging and tensioning including excavation, refilling and dismantling the stays after tensioning etc., complete. | item22 | 19 | Nos |
| 23 | 23 | Labour charges for Transport, Paying out, jointing, rough sagging,& tensioning of 6 No. ACSR Panther conductors including clipping, providing SB dampers and jumpering in tension points transport of all materials from stores to site & fixing of all other accessories, labour, leads and lifts etc., complete. | item23 | 8 | Kms |
| 24 | 24 | Labour charges for Paying out,Sagging and tensioning of 1no GI earth wire (7/3.55mm )to the required clearance, clipping using necessary clamp, tools with cost of required tension and suspension fittings and fixing of all accessories labour, lead ,lift ect complete. | item24 | 8 | Kms |
| 25 | 25 | Labour charges for dismantling of GI tower angles including cost of materials,T & P, labour, lead, lift etc complete. as per approved drawing and specification | item25 | 1.9 | MT |
| 26 | 26 | Labour charges for Releasing and lowering of 7 units of single suspension insulator with fittings including all labour lead lifts, and T & P etc complete. | item26 | 3 | Sets |
| 27 | 27 | Labour charges for Releasing lowering and restringing of existing 3 Nos of conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. | item27 | 2 | Span |
| 28 | 28 | Labour charges for releasing, Lowering and restringing of existing 1 No of 7/3.55mm GI earthwire including lead, lift, labour and cost of T&P etc comple | item28 | 2 | Span |
| 29 | 29 | Providing PG clamp for Loop jumpers and removal of the same after commissioning of the 110 line including cost of all materials, labour lead llift T&P etc complete | item29 | 1 | No |
| 30 | 30 | Arranging and availing of Rail way LC on HT/LT power lines and lowering and retensioning after stringing is completed including all labour etc., complete | item30 | 27 | Nos |
| 31 | 31 | Painting with best quality of anti-corrosive black paint for a height of 1.00m from the top level of coping including cost of paint all labour etc., complete. | item31 | 34 | Loc. |
| 32 | 32 | Labour charges for Tack welding of bolts and nuts in towers up to bottom cross arm using diesel generator sets and applying cold galvanizing paint including cost of all materials, lead and hire charges etc., complete. | item32 | 24000 | Nos |
| 33 | 33 | Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete. | item33 | 355 | m2 |
| 34 | 34 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete | item34 | 285 | Hrs |
| 35 | 35 | Uprooting and removing small palmyrah | item35 | 1600 | Nos |
| 36 | 36 | Uprooting and removing large palmyrah | item36 | 800 | Nos |
| 37 | 37 | Labour charges for fixing number plate, phase plate and danger board including lead lift etc | item37 | 34 | Sets |
| 38 | 38 | Transportation charges for Devolution of Insulator to store | item38 | 0.13 | MT |
| 39 | 39 | Fabrication, supply and fixing in position of the Name Board made of steel sheet 18 Gauge (1.25mm)thick and Letter painting over the board as directed by the Engineer in charge of the work. | item39 | 34 | Nos |
| 40 | 40 | Supply of fixing number plate as directed by the Engineer in charge of the work including all labour etc., complete | item40 | 34 | Nos |
| 41 | 41 | Supply of fixing Danger boards as directed by the Engineer in charge of the work including all labour etc., complete | item41 | 34 | Nos |
| 42 | 42 | Supply of fixing Phase plates (Set of three) as directed by the Engineer in charge of the work including all labour etc., complete | item42 | 34 | Nos |
| 43 | 43 | (Tower Parts) Fabrication, Supply of tower parts including cutting, drilling holes, galvanizing as per IS 2629-1985 and IS 4759 -1966 with hot dip process as per Technical specification as directed by the engineer in charge of the work including cost of all materials, galvanizing charges, all labour, lead and lift etc., complete. | item43 | 1.35 | MT |
| 44 | 44 | Supply of standard G.I Bolts and nuts of various sizes and transporting of Bolt and nuts to site including all taxes and duties,freight charges etc.,complete.The raw material standard should be as per IS 2062 and for galvanising as per I.S.2633 and 6745(Latest code).The governing standards for towers should be as per the specified IS Codes directed by the Departmental Engineer at site.supply of GI bolts and nuts. | item44 | 0.07 | MT |
| 45 | 45 | LESS CREDIT Take away of dismantled material in [As is where is condition] consisting of various type of tower (Approximately)G.I/M.S tower angle scrap - 1.90 MT. The quoted amount shall not be less than the board fixed minimum bid amount of Rs.25,000/MT | item45 | 1.9 | MT |
| 46 | 46 | GST for bidders within TamilNadu | |||
| 47 | 46.01 | SGST | item46 | 1 | percentage |
| 48 | 46.02 | CGST | item47 | 1 | percentage |
| 49 | 47 | GST for bidders outside TamilNadu (IGST) | item48 | 1 | percentage |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents