Smart City Development Limited has published Selection Of System Integrator For Supply , Installation , And Maintenance Of Gps Based Vehicle Tracking Software And Iot Devices For Ajmer Municipal Solid Waste Collection And Public Transport Vehicles. Submission Date for this Tender is 06-01-2020. Customised Software Development Tenders in ASCL, AJMER Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: Selection of System Integrator for Supply, Installation, and Maintenance of GPS based Vehicle Tracking Software and Internet of Things (IoT) devices for Ajmer Municipal Solid Waste collection and Public Transport Vehicles | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of GPS Devices as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge. with 3 years onsite OEM warranty. | 190 | Nos. | |
2 | 2 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of Vehicle Tracking Software \n1)SWM Software : i)Vehicle Tracking System with Dashboard and MIS reports ii)Mobile Application for Android and iOS\n2)AMC Public transport : Vehicle Tracking System with Dashboard and MIS reports as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite system Integrator support. | 1 | Job. | |
3 | 3 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of Fuel Sensors as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite OEM warranty. | 25 | Nos. | |
4 | 4 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of Video Wall (2x2,55’’ inches) with Controller of reputed make as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite OEM warranty. | 1 | Nos. | |
5 | 5 | Supply, Installation, Customization, Integration, Testing , Implementation & Commissioning of Operational Center Computers as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite OEM warranty. | 3 | Nos. | |
6 | 6 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of UPS as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite OEM warranty. | 3 | Nos. | |
7 | 7 | Supply, Installation, Customization, Integration, Testing, Implementation & Commissioning of A4 Printer Devices as per requirement, scope of work, technical specification as per RFP section-V clause 9 & complete in all respect as per the satisfaction of Engineer In charge with 3 years onsite OEM warranty. | 1 | Nos. | |
8 | 8 | Cloud hosting services | |||
9 | 8.1 | Cloud hosting services for 1st Year | 1 | Year | |
10 | 8.2 | Cloud hosting services for 2nd Year | 1 | Year | |
11 | 8.3 | Cloud hosting services for 3rd Year | 1 | Year | |
12 | 9 | Deployment of Support Engineers during Hand holding for period of 1 year after the works are certified to be completed (3 engineer for 1 year duration) | 36 | Man-Month | |
13 | 10 | All inclusive Comprehensive Maintenance of SWM waste collection and Public Vehicle tracking system, Software and associated Hardware for 3 years to be calculated from the date when works are certified as completed and project is GO Live.\n\nComprehensive Maintenance shall trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified | 1 | Lumpsum. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail