| 1 | 1 | S & F PVC heavy duty sprinklers suitable for 25 mm dia pipe including stand pipe & connecting accessories.\nMake: Jain Irrigation system Ltd Model No.D5153 or equivalent make from Hunter / Rain Bird | | 4 | Each |
|---|
| 2 | 2 | Supplying and planting of tree saplings (Neem / Banyan / Ashoka / Gulmohar / Teak / Mango / Aina / Ber / Kusumbi / Karanda creeper / Vine / Yam / Chineese potato Diosoorea Batata Hep Humulus) of not less than 1.2 m height of approved species including excavation and earth work in any type of strata for pit of required size (minimum 0.50 cum) and filling in pit with fertile soil mixed with composed manure in the ratio 1:1 by volume levelling and watering, maintaining, growing as required all as specified and directed.\nNote: The grass / plant / trees shall be kept green and live by watering and taking care of the same up to date of completion. If grass / plant / trees / shrubs / hedges die during period of completion or period of defect liability period, contractor has to replace the same as per grown position at no extra cost to Govt. and make all arrangements to take care so that it shall not die. | | 50 | Each |
|---|
| 3 | 3 | M & L for surface excavation in any type of soil averaging 15cm depth but n.exc 30cm depth and ploughing the excavated ground for 20 to 30cm depth levelling and providing Doob grass on ground including filling in with fertile soil mixed with compost manure in the ratio 1:1 by volume of minimum thickness 100mm over excavated ground, watering, growing, maintaining as required all as specified and directed.\nNote: The grass / plant / trees shall be kept green and live by watering and taking care of the same up to date of completion. If grass / plant / trees / shrubs / hedges die during period of completion or period of defect liability period, contractor has to replace the same as per grown position at no extra cost to Govt. and make all arrangements to take care so that it shall not die. | | 500 | Sqm |
|---|
| 4 | 4 | Supply & plantation of approved shrubs / hedges including all necessary excavation in trenches in any type of soil/strata of size, 0.45m wide & 0.30 m depth all as specified & directed.\nNote: (i) The minimum height of plant shall be 0.30 m including necessary manure etc complete as specified and as directed by Engr-in charge. (ii) The plant / hedge shall be kept live by watering and taking care of plant up to date of completion. If plant die during period of completion or period of defect liability period, contractor has to replace the same and make all arrangements and take care so that plants / shrub / hedge do not die. | | 250 | RM |
|---|
| 5 | 5 | Cutting and jointing to existing pipe line upto 50 mm bore size including inserting tee / elbows etc necessary for connecting existing pipe line with new pipe. | | 2 | Each |
|---|
| 6 | 6 | Supply and fix / lay in trenches 25mm bore galvanised steel water tubing, medium grade including necessary fittings such as GI bends / elbow, tee, union etc complete and connecting to water supply pipe line including excavation and returning filling complete all as specified and as directed by Engineer-in-Charge. | | 450 | RM |
|---|
| 7 | 7 | Supply and install, test & commissioning of booster pump, self priming, monoblock, electric driven, single phase 230 V, discharge capacity 3.9 ltr/sec, head 5.00 m suitable for sprinklers, incl DOL starter, electric cable from starter to Motor appx 2.5 m long etc complete.\nMake: CG, KSB, Kirloskar, Beacon, Mather & Platt, CRI Coimbatore, Wasp | | 1 | Each |
|---|
| 8 | 8 | Maintenance and supervision of grass, lawn, plants, trees, saplings, shrubs, hedges provided under subject work including spreading of manure, pesticides, insecticides in the desired periodicity, weeding, watering etc executed under this contract and periodical maintenance from the certified date of completion of Phase-I work all as specified and idrected.\nNote: \n(i) The contractor shall ensure that the water tanker vehicle fitted with hose pipe etc for watering purpose and requisite equipement for spraying the medicine, ploughing where required the earth for weeding out unwanted growth / grass etc in running condition throughout the period.\n(ii) The foliage and other unwarranted items shall be removed from site to a place as directed by the GE. | | 24 | Per Month |
|---|