Supply Of Material And Labour Work For Cctv Project At Central Prison Tvm-3 Supply Of 12 Port Fully Loaded Fiber Liu Including Sc Fiber Pigtail, Splice Tray, Splicing Charges For All Fiber Cores Etc.. For Termination Of Fiber Cable In Control Room Approved Make: Adc Krone / Amp / Legrand / Molex 4 Supply Of 12 Port Fiber Liu Loaded With 6 Adaptor Plate And 1 Blank Plate Including Sc Fiber Pigtail, Splice Tray, Splicing Charge For All Cores Etc..Approved Make: Adc Krone / Amp / Legrand / Molex 5 Supply Of 1Mtr Sc-Lc Duplex Single Mode Fiber Patch Cord To Patch The Liu And Corresponding Switchesapproved Make: Adc Krone / Amp / Legrand / Molex 6 Supply Of 24 Port Cat-6 Utp Patch Panelapproved Make: Adc Krone / Amp / Legrand / Molex 7 Supply Of Cat-6 Utp Keystone Jacks Including Termination Charge, Suitable Patch Cordsapproved Make: Adc Krone / Amp / Legrand / Molex 8 Supplying Of 63Mm Size Dwc Hdpe Pipe Isi Marked Along With All Accessories Like Socket, Bend, Couplers Etc. Conforming To Is14930, Part Ii Complete With Fitting And Cutting, Jointing Etc..Direct In Ground ( 75 Cm Below Ground Level ) Including Excavation And Refilling The Trench But Excluding Sandcushioning And Protective Covering Etc., Complete As Required. 9 Supply Of 6 Core Outdoor Armoured Single Mode Optical Fibre Cable Through The Hdpe Pipe For The Backbone Connectivity Of All Outdoor Switches To The Control Roomapproved Make: Adc Krone / Amp / Legrand / Molex 10 Supply Of 25Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables 11 Supply Of 20Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables 12 Supply Of 32Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables 13 Supply Of 3 Core 1.5Sq.Mm Pvc Insulated & Pvc Sheathed 650 / 1100 V Grade Copper Conductor Round Flexible Cables Conforming To Is 694 Part I 1960 In The Existing Surface / Recess Conduit As Required Including Giving Necessary Connections For Providing Power Supply To All Network Switches And Cameras Wherever Necessary 14 Supply Of 2Mtr Cat-6 Giga Utp Patch Cord. Make: Adc Krone / Amp / Legrand / Molex 15 Supply Of 1Mtr Cat-6 Giga Utp Patch Cord. Make: Actassi / Beldel / Panduit / R&M 16 Supplying Of 1.5 Sq. Mm 3 Core Frls Pvc Insulated ( Isi Standard ) Steel Armoured Pvc Sheathed Copper Conductor Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required.Preferred Make: Finolex / Havels 17 Supplying Of 1.5 Sq. Mm 3 Run Frls Pvc Insulated ( Isi Standard ) Copper Conductor, Single Core Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required. Make: Finolex / Havels 18 Supplying Of 2.5 Sq. Mm 3 Run Frls Pvc Insulated ( Isi Standard ) Copper Conductor, Single Core Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required. Preferred Make: Finolex / Havels 19 Supply Of 6 X 4 Pvc Box With Plate 20 Supply Of Rj 45 Connector Make: D-Link 21 Supply And Providing Plate Earthing As Per Is 3043 With 600X600x6.30Mm Gi / Ci Earth Plate , 25Mm Gi Watering Pipe Fixed To The Earth Plate With 20X3mm Gi Clamps , Gi Funnel With Wire Mesh , Filling Required Quantity Of Charcoal Including Construction Of Inspection Chamber With A Bed Concrete Of 1:4:8 Pcc Of Pcc Bed With Cement Mortar 1:4 , 12Mm Thick , ( The Finished Inside Dimension Shall Be 300X300x300mm. Ci Manhole Cover With Frame Shall Be Painted With Bituminized Paint, Mixtures Of Charcoal Around Electrode Including Digging Of Pit Up To Permanent Moisture Level But Not Less Than 3M Depth And Back Filling ( Value Of Earth Resistance Should Be Less Than 1 Ohm ) 22 Supply Of Re-Inforced Flexible Pipe With Suitable Glands And Connector ( All Accessories Under The Scope Of Supplier ) 23 Supply Of 10Swg Copper For Earthing With Suitable Legs ( All Accessories Under The Scope Of Supplier ) 24 Supply Of 12Swg Copper For Earthing With Suitable Legs ( All Accessories Under The Scope Of Supplier ) 25 Supply Of 3 Modular Pvc Box With Plate ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 26 Supply Of 4 Modular Pvc Box With Plate ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 27 Supply Of 6A Switch ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 28 Supply Of 6A Socket ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 29 Supply Of 16A Plug Top ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 30 Supply Of 16A Switch ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 31 Supply Of 16A Socket ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 32 Supply Of 16A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 33 Supply Of 32A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 34 Supply Of 20A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 35 Supply Of 6A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 36 Supply Of 8 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 37 Supply Of 6 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 38 Supply Of 4 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 39 Supply Of 2 Pole 40A Isolator ( Mcb Type ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 40 Supply Of Exhaust Fan 230Mm Industrial Standard ( All Accessories Under The Scope Of Supplier ) Make: Havells / Crompton 41 Supply Of Materials For Civil Work-Modification Of Existing Tv Fixing Wooden Panel By Using Using 12 / 18 Mm Marine Quality Plywood With Teak Wood Stiffeners On Back Side, Alround 50X25 Mm Or Nearest Size, Front Face Covered With Approved Color Wellvet Cloth Of Required Thickness, Using Required Synthetic Adhesive The Modified Monitor Panel Should Accommodate 4 Nos 55”Tv Of Lg- Make Model. 42 Supply Of Materials For Ups Room Ups Room Aluminum Fabrication, Partition Door Using Powder Coated Aluminum Extrusions Of Thickness Not Less Than 2 Mm Using 63 X 38 Mm Sections, Alround Intermediate Horizontals And Vertical And Suitable Size Door Sections Etc And Pvc Panel And 9 Mm Both Side Laminated Particle Board In Matching Shade, For Bottom Panels Etc Five Nos 250 Mm Steel Hinges For Each Shutter, Heavy Duty Handles, Stopper, Heavy Duty Door Lock, Aluminum Tower Bolts Minimum Two Nos, Etc All As Per The Requirement At Site. Area = 385 Sq.Ft. Please Refer Annex A 43 Labour Work 44 Installation Of Outdoor 2Mp Hd, 30X Ptz Poe Speed Dome Camera Of 270° Pan With Poe+Injector / Power Adapter And Proper Mounting Bracket As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 45 Installation Of 2Mp Indoor Varifocal Lense Ir Dome Poe Camera As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 46 Installation Of 2Mp Outdoor Varifocal Lense Ir Bullet Poe Camera As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 47 Installation Of Enterprise Class Rack Mount 128 Channel Nvr With Raid Function, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) Installation Of Enterprise Class Rack Mount 128 Channel Nvr With Raid Function, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 48 Installation Of 55” Led Back Lighted Lcd Tv Of 16:9 Aspect Ratio With All Mounting Accessories As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 49 Installation Of Enterprise Class 24Port L3 Managed Gigabit Poe+ Switch With Min4 Sfp Ports Populated With Min 4 Nos Of Singlemode Sfp Modules As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 50 Installation Of Enterprise Class 24 Port L2 Managed Gigabit Poe+ Switch With Min2 Sfp Ports, Populated With The Single Mode Sfpmodules As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 51 Installation Of Enterprise Class 8 Portl2 Managed Gigabit Poe+ Switch With Min 2Sfp Ports, Populated With The Single Mode Sfpmodulesas Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 52 Installation Of 12 Port Fully Loaded Fiber Liu Including Sc Fiber Pigtail, Splice Tray, Splicing Charges For All Fiber Cores Etc.. For Termination Of Fiber Cable In Control Room As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 53 Installation Of 12 Port Fiber Liu Loaded With 6 Adaptor Plate And 1 Blank Plate Including Sc Fiber Pigtail, Splice Tray, Splicing Charge For All Cores Etc..As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 54 Installation Of 6U Rack With Fan, Cable Manager Etc. And Mov Based Surge Protectors With Impulse Discharge Current Of7ka, Nominal Discharge Current Of 30 Ka.As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 55 Installtion 24 Port Cat-6 Utp Patch Panelas Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 56 Laying Of 63Mm Size Dwc Hdpe Pipe Isi Marked Along With All Accessories Like Socket, Bend, Couplers Etc. Conforming To Is14930, Part Ii Complete With Fitting And Cutting, Jointing Etc..Direct In Ground ( 75 Cm Below Ground Level ) Including Excavation And Refilling The Trench But Excluding Sandas Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 57 Removing Of Paver Blocks Direct In Ground ( 75 Cm Below Ground Level ) Including Excavation And Refilling The Trench But Excluding Sand As Per Site Requirement 58 Relaying Of Paver Blocks Direct In Ground ( Mentioned As Ref:Si.No.14 ) 59 Drawing Of 6 Core Outdoor Armoured Single Mode Optical Fibre Cable Through The Hdpe Pipe For The Backbone Connectivity Of All Outdoor Switches To The Control Roomas Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 60 Installation Of 3Kva Online Double Conversion Single Phase Ups For The Camera System As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 61 Fixing Of 25Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 62 Fixing Of 20Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 63 Fixing Of 32Mm Size Of Pvc Conduit Conforming To Is 9537 / 1983 Part Iii Along With All Required Accessories On Surface Including Making Good The Damages Etc As Required For Drawing Of Cables, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 64 Drawing Of 3 Core 1.5Sq.Mm Pvc Insulated & Pvc Sheathed 650 / 1100 V Grade Copper Conductor Round Flexible Cables Conforming To Is 694 Part I 1960 In The Existing Surface / Recess Conduit As Required Including Giving Necessary Connections For Providing Power Supply To All Network Switches And Cameras Wherever Necessary As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 65 Drawing Of 1.5 Sq. Mm 3 Core Frls Pvc Insulated ( Isi Standard ) Steel Armoured Pvc Sheathed Copper Conductor Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required.As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 66 Drawing Of 1.5 Sq. Mm 3 Run Frls Pvc Insulated ( Isi Standard ) Copper Conductor, Single Core Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required. As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 67 Drawing Of 2.5 Sq. Mm 3 Run Frls Pvc Insulated ( Isi Standard ) Copper Conductor, Single Core Cable In The Existing Surface / Recessed Steel / Pvc Conduit As Required. As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 68 Drawing 1 Run Cat-6 Utp Cable Conforming To Relevant Standards Through The Existing Conduit And Giving Connections As Required, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 69 Drawing 2 Run Cat-6 Utp Cable Conforming To Relevant Standards Through The Existing Conduit And Giving Connections As Required, As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 70 Drawing 3 Run Cat-6 Utp Cable Conforming To Relevant Standards Through The Existing Conduit And Giving Connections As Required , As Per Site Requirement ( All Accessories Under The Scope Of Suplier ) 71 Fixing Of Plate Earthing System, A Plate Made Up Of Either Copper With Dimensions 60Cm X 60Cm X 3.18Mm ( I.E. 2Ft X 2Ft X 1 / 8 In ) Or Galvanized Iron ( Gi ) Of Dimensions 60Cm X 60Cm X 6.35 Mm ( 2Ft X 2Ft X ¼ In ) Is Buried Vertical In The Earth ( Earth Pit ) Which Should Not Be Less Than 3M ( 10Ft ) From The Ground Level. 72 Fixing Of 3 Modular Pvc Box With Plate ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 73 Fixing Of 4 Modular Pvc Box With Plate ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 74 Fixing Of 6A Switch ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 75 Fixing Of 6A Socket ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 76 Fixing Of 16A Plug Top ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 77 Fixing Of 16A Switch ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 78 Fixing Of 16A Socket ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 79 Fixing Of 16A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 80 Fixing Of 32A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 81 Fixing Of 20A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 82 Fixing Of 6A Mcb ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 83 Fixing Of 8 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 84 Fixing Of 6 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 85 Fixing Of 4 Way Db ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 86 Fixing Of 2 Pole 40A Isolator ( Mcb Type ( All Accessories Under The Scope Of Supplier ) Make: Legrand / Crabtree / Schneider 87 Fixing Of Exhaust Fan 230Mm Industrial Standard ( All Accessories Under The Scope Of Supplier ) Make: Havells / Crompton 88 Installation Of Materials For Ups Room Ups Room Aluminum Fabrication, Partition Door Using Powder Coated Aluminum Extrusions Of Thickness Not Less Than 2 Mm Using 63 X 38 Mm Sections, Alround Intermediate Horizontals And Vertical And Suitable Size Door Sections Etc And Pvc Panel And 9 Mm Both Side Laminated Particle Board In Matching Shade, For Bottom Panels Etc Five Nos 250 Mm Steel Hinges For Each Shutter, Heavy Duty Handles, Stopper, Heavy Duty Door Lock, Aluminum Tower Bolts Minimum Two Nos, Etc All As Per The Requirement At Site. Area = 385 Sq.Ft. Please Refer Annex A 89 Control Room Cleaning, Necessary Patch Work Of Wall And Filling And Leveling The Wall Using Putty And Painting The Wall With Double Coat Interior Emulsion ( Materials Under The Scope Of Supplier ) 90 Modification Of Existing Tv Fixing Wooden Panel By Using Both Side Laminated Particle Board / Medium Density Fiber Boards Of Approved Shade And Marine Grade Plywood. The Modified Monitor Panel Should 4 Nos Accommodate 55”Tv Of Lg- Make Model. Control Room Cleaning, Necessary Patch Work Of Wall And Filling And Leveling The Wall Using Putty And Painting The Wall With Double Coat Interior Emulsion