Maintenance Of Complete Schemes Under Flyover Civil ( Fod-1And 3 ) Elect ( Ed-3 , 5 And 10 ) Running Operation And Maintenance Of 11 Kv 433V Sub Station , 1250 And 320 Kva Dg Set , Tunnel And High Mast Lighting , Dewatering Pump Sets And Ei And
Tender Overview
Project Description
Maintenance Of Complete Schemes Under Flyover Civil ( Fod-1And 3 ) Elect ( Ed-3 , 5 And 10 ) Running Operation And Maintenance Of 11 Kv 433V Sub Station , 1250 And 320 Kva Dg Set , Tunnel And High Mast Lighting , Dewatering Pump Sets And Ei And Fans Of Sub Station And Office Building ( F . O . D . -4 ) At Sarita Vihar Underpass .
BOQ
| Name of Work: M/o complete schemes under flyover Civil (FOD-1&3) Elect (ED-3,5 & 10) .Sub Head :-Running operation & maintenance of 11 KV/433V Sub station, 1250/320 KVA DG Set, Tunnel/ High Mast Lighting, Dewatering pump sets and EI & fans of sub station and office building (F.O.D.-4) at Sarita Vihar underpass. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Running operation, logging & routine / preventive maintenance of storm water pump sets by deploying 3 Nos. skilled & trained pump operators 1 no. in each shift (total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM) for 9 months and 9 Nos. skilled & trained pump operators 3 no. in each shift (total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM) 1 no. for each pump house or each pump at 3 locations for 3 months (during rainy season), one no wireman having at least competency certificate Class 2 & trained in maintenance of pumping installations once in a week (general shift 9 AM to 5 PM) & one no fitter trained in maintenance of pumping installations once in a week (general shift 9 AM to 5 PM) as per additional conditions & special conditions attached etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance. Quoted rates shall be inclusive of additional labour & material components, charges for liaison / communication with department. Nothing extra shall be payable on any account.\n | 1 | 12 | Months |
| 2 | 2 | Running maintenance, logging & routine / preventive maintenance of substation equipments and Diesel generating set by deploying 3 Nos skilled & trained electricians ,1 No. in each shift (total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM), one No wireman having at least competency certificate Class 1 & trained in maintenance of substation equipments and one No wireman having competency class 1& trained in maintenance of diesel generating set once in alternate week (i.e. one M/o substation in 1st week and M/o DG set in 2nd week and so on), (general shift 9 AM to 5 PM) & one No foreman (Electrical) and one No. mechanic once in alternate month ( i.e. one M/o substation in 1st month and M/o DG set in 2nd month and so on), (general shift 9 AM to 5 PM) as per additional conditions & special conditions attached etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance including periodical testing of transformer oil, dehydration if required & testing / calibration once in year etc. For DG set;- Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance including servicing, topping up of mobile oil/ water etc. Quoted rates shall be inclusive of additional labour & material components, charges for liaison / communication with department. Nothing extra shall be payable on any account.\n | 2 | 12 | Months |
| 3 | 3 | Running maintenance including routine / preventive maintenance of high mast lighting system by deploying 1 No. wireman having at least competency certificate class 2 and trained in maintenance of high mast lighting once in a week (general shift 9 AM to 5 PM) and 1 No mechanic trained in maintenance of high mast lighting once in a week (general shift 9 AM to 5 PM ) as per additional conditions & special conditions attached etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance. Quoted rates shall be inclusive of additional labour & material components, charges for liaison / communication with department. Nothing extra shall be payable on any account.\n | 3 | 12 | Months |
| 4 | 4 | Running maintenance including routine / preventive maintenance of IEI and fans of sub-station and office building of FOD-4 by deploying 1 No wireman having atleast competency certificate class 2 once in a week (general shift 9 AM to 5 PM) and 1 No Khallasi once in a week (general shift 9 AM to 5 PM ) as per additional conditions & special conditions attached etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance. Quoted rates shall be inclusive of additional labour & material components, charges for liaison / communication with department. Nothing extra shall be payable on any account.\n | 4 | 12 | Months |
| 5 | 5 | Comprehensive maintenance of following system as per detailed inventory attached as per annexure \"C\", including repair / replacement of any part of parts to the original finish & performance required for fully functional system for original system requirement etc. as required.\n5.01 ) Storm water pumping sets | 5 | 12 | Months |
| 6 | 5.02 | Substation equipments | 6 | 12 | Months |
| 7 | 5.03 | High Mast Lighting | 7 | 12 | Months |
| 8 | 5.04 | Tunnel Lights | 8 | 12 | Months |
| 9 | 6 | Providing supervisor for daily monitoring & supervision and ensure logging of operation / maintenance staff, attending routine, preventive & breakdown maintenance. \nNote: The supervisor must be minimum graduate qualified.\n | 9 | 12 | Months |
| 10 | 7 | Providing helper for routine work as per direction of engineer-in-charge or his authorized representative in case of emergencies. | 10 | 50 | Per day |
| 11 | 8 | B' check Servicing of 1250 KVA capacity D.G. set (cummins make) by deploying authorize mechanical engineer from Cummins Svam Sales & Service Ltd. including replacement of following material, connection, testing etc. as required.\na) Element Lub Oil Filter (84212300)-4 Nos\nb) Element Fuel Filter (84212300)-2 Nos\nc) Gasket Fuel Filter Cover (40169340)-2 Nos\nd) Element Oil Bypass Filter (84212300)-2 Nos\ne) Seal,O Ring (40169320)-1 No\nf) Inhibitor, Corrosion 10 Liters (38200000)-1No\ng) STRIP TEST (38200000)-2 Nos\nh) kit Air Cleaner elements (K, QSK, V Series)-1 No\ni) Volvoline Premium Blue 7600 1/210 Ltr (27101980)-1 No\nj) Any other item required for servicing etc.\n\n | 11 | 1 | Per Job |
| 12 | 9 | B' check Servicing of 320 KVA capacity D.G. set (Kirloskar make) by deploying authorize mechanical engineer from M/s Kirloskar Ltd. including replacement of following material, connection, testing etc. as required.\na) FUEL FILTER CATRIGE-2 Nos\nb) SOINON ASSEMBL KIT-1 No\nc) LUB OIL FILTER-2 Nos\nd) KOEL CARE Genuine Oil Premium 20 Litres Can-2 Nos\ne) Any other item required for servicing etc\n\n\n\n\n\n\n\n\n\n | 12 | 1 | Per Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender