Flood Restoration Work On Various Roads Under Pwd Sub Dn Second Kekri
Tender Value
8.23 Lakhs
Estimated cost
Bid Submission
14 Dec 2019
0 days left
EMD
16460
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
KEKRI → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Flood Restoration Work On Various Roads Under Pwd Sub Dn Second Kekri
BOQ
| Name of Work: Flood Restoration Work on Various Roads under PWD Sub Dn II Kekri | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Name of Road :A/R Pipliya Km 0/0 to 4/05 | BI01010001010000000000000515BI0100001112 | ||
| 2 | 2 | Providing and laying 20 mm thick premix patching with 0.27 cum of stone chipping ( 0.18 cum of 13.2 mm size and 0.09 cum of 11.2 mm size ) mixed with 14.6 kg of straight run bitumen per 10 sqm of road surface including heating of binder and aggregate, cleaning the area of patch, pot holes cut to regular shape with vertical sides, removing all loose & disintegrated material, application of tack coat @ 2.25 kg per 10 sqm., laying of patching material and compacting with 8-10 tonne power road roller including cost of bitumen , aggregate, fuel, lubrication, binder ,hire charges of Machinery, T&P etc. | 972 | Sqm | |
| 3 | 3 | Providing and laying premixed sand seal coat on patch area comprising of thin application of fine aggregate (0.06 cum/10 sqm) premixed with 6.8kg/10 sqm binder 80/100 grade in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material. | 972 | Sqm | |
| 4 | 4 | Collection of graded broken hard stone aggregates free from Katcha stuff, deleterious and organic matter, as per IRC/MORTH Specifications, including stacking as per the Standard Specifications of sizes: 53mm to 22.4mm Crusher broken | 29 | Cum | |
| 5 | 5 | Collection of Binding material/mooram for WBM course (P.I. less than 6 as per MoRTH Specification clause No.404-2.7), including stacking the standard as per Specifications. | 6 | Cum | |
| 6 | 6 | Labour charges for patching WBM surface using crushed/hand broken aggregate including preparation of pot hole, scarifying and re-shaping to the required grade and camber, as per the standard specifications, spreading of material, consolidation with mechanical drop hammer of 11.40kg hand rammer or 8-10tonne power roller, spreading & consolidation of binding material including cost of fuel and lubricants and hire charges of T & P. | 29 | Cum | |
| 7 | 7 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15 To achieve 100% Proctor density | 101.25 | Cum | |
| 8 | 8 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002. | 133.65 | Cum | |
| 9 | 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of thorny jungle | 2.025 | Hect | |
| 10 | 10 | Name of Road :Dhundari to Tankawas Km 0/0 to 1/750 | |||
| 11 | 11 | Providing and laying 20 mm thick premix patching with 0.27 cum of stone chipping ( 0.18 cum of 13.2 mm size and 0.09 cum of 11.2 mm size ) mixed with 14.6 kg of straight run bitumen per 10 sqm of road surface including heating of binder and aggregate, cleaning the area of patch, pot holes cut to regular shape with vertical sides, removing all loose & disintegrated material, application of tack coat @ 2.25 kg per 10 sqm., laying of patching material and compacting with 8-10 tonne power road roller including cost of bitumen , aggregate, fuel, lubrication, binder ,hire charges of Machinery, T&P etc. | 420 | Sqm | |
| 12 | 12 | Providing and laying premixed sand seal coat on patch area comprising of thin application of fine aggregate (0.06 cum/10 sqm) premixed with 6.8kg/10 sqm binder 80/100 grade in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material. | 420 | Sqm | |
| 13 | 13 | Collection of graded broken hard stone aggregates free from Katcha stuff, deleterious and organic matter, as per IRC/MORTH Specifications, including stacking as per the Standard Specifications of sizes: 53mm to 22.4mm Crusher broken | 13 | Cum | |
| 14 | 14 | Collection of Binding material/mooram for WBM course (P.I. less than 6 as per MoRTH Specification clause No.404-2.7), including stacking the standard as per Specifications. | 3 | Cum | |
| 15 | 15 | Labour charges for patching WBM surface using crushed/hand broken aggregate including preparation of pot hole, scarifying and re-shaping to the required grade and camber, as per the standard specifications, spreading of material, consolidation with mechanical drop hammer of 11.40kg hand rammer or 8-10tonne power roller, spreading & consolidation of binding material including cost of fuel and lubricants and hire charges of T & P. | 13 | Cum | |
| 16 | 16 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15 To achieve 100% Proctor density | 43.75 | Cum | |
| 17 | 17 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002. | 52.5 | Cum | |
| 18 | 18 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of thorny jungle | 0.875 | Hect | |
| 19 | 19 | Name of Road : A/R Sadari Km 0/0 to 2/250 | |||
| 20 | 20 | Providing and laying 20 mm thick premix patching with 0.27 cum of stone chipping ( 0.18 cum of 13.2 mm size and 0.09 cum of 11.2 mm size ) mixed with 14.6 kg of straight run bitumen per 10 sqm of road surface including heating of binder and aggregate, cleaning the area of patch, pot holes cut to regular shape with vertical sides, removing all loose & disintegrated material, application of tack coat @ 2.25 kg per 10 sqm., laying of patching material and compacting with 8-10 tonne power road roller including cost of bitumen , aggregate, fuel, lubrication, binder ,hire charges of Machinery, T&P etc. | 540 | Sqm | |
| 21 | 21 | Providing and laying premixed sand seal coat on patch area comprising of thin application of fine aggregate (0.06 cum/10 sqm) premixed with 6.8kg/10 sqm binder 80/100 grade in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material. | 540 | Sqm | |
| 22 | 22 | Collection of graded broken hard stone aggregates free from Katcha stuff, deleterious and organic matter, as per IRC/MORTH Specifications, including stacking as per the Standard Specifications of sizes: 53mm to 22.4mm Crusher broken | 17 | Cum | |
| 23 | 23 | Collection of Binding material/mooram for WBM course (P.I. less than 6 as per MoRTH Specification clause No.404-2.7), including stacking the standard as per Specifications. | 4 | Cum | |
| 24 | 24 | Labour charges for patching WBM surface using crushed/hand broken aggregate including preparation of pot hole, scarifying and re-shaping to the required grade and camber, as per the standard specifications, spreading of material, consolidation with mechanical drop hammer of 11.40kg hand rammer or 8-10tonne power roller, spreading & consolidation of binding material including cost of fuel and lubricants and hire charges of T & P. | 17 | Cum | |
| 25 | 25 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15 To achieve 100% Proctor density | 56.25 | Cum | |
| 26 | 26 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002. | 67.5 | Cum | |
| 27 | 27 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of thorny jungle | 1.125 | Hect | |
| 28 | 28 | Name of Road : Kushyata to Bisundani Km 0/000 to 6/000 | |||
| 29 | 29 | Providing and laying 20 mm thick premix patching with 0.27 cum of stone chipping ( 0.18 cum of 13.2 mm size and 0.09 cum of 11.2 mm size ) mixed with 14.6 kg of straight run bitumen per 10 sqm of road surface including heating of binder and aggregate, cleaning the area of patch, pot holes cut to regular shape with vertical sides, removing all loose & disintegrated material, application of tack coat @ 2.25 kg per 10 sqm., laying of patching material and compacting with 8-10 tonne power road roller including cost of bitumen , aggregate, fuel, lubrication, binder ,hire charges of Machinery, T&P etc. | 1440 | Sqm | |
| 30 | 30 | Providing and laying premixed sand seal coat on patch area comprising of thin application of fine aggregate (0.06 cum/10 sqm) premixed with 6.8kg/10 sqm binder 80/100 grade in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material. | 1440 | Sqm | |
| 31 | 31 | Collection of graded broken hard stone aggregates free from Katcha stuff, deleterious and organic matter, as per IRC/MORTH Specifications, including stacking as per the Standard Specifications of sizes: 53mm to 22.4mm Crusher broken | 43 | Cum | |
| 32 | 32 | Collection of Binding material/mooram for WBM course (P.I. less than 6 as per MoRTH Specification clause No.404-2.7), including stacking the standard as per Specifications. | 9 | Cum | |
| 33 | 33 | Labour charges for patching WBM surface using crushed/hand broken aggregate including preparation of pot hole, scarifying and re-shaping to the required grade and camber, as per the standard specifications, spreading of material, consolidation with mechanical drop hammer of 11.40kg hand rammer or 8-10tonne power roller, spreading & consolidation of binding material including cost of fuel and lubricants and hire charges of T & P. | 43 | Cum | |
| 34 | 34 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15 To achieve 100% Proctor density | 156 | Cum | |
| 35 | 35 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002. | 180 | Cum | |
| 36 | 36 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of thorny jungle | 3 | Hect |
AI Tender Summary
Tender Timeline
Dec 09, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedDec 14, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 16, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender